Original source · versioned page text
2017-03-07 Planning & Environment Committee Agenda
The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 87 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Interim Results — po :
example “ om
. | d li >.
Active landslip on upper yk
slopes and deposition
caught by dam/s
When 2008 LIDAR imagery is placed over
the 2015 imagery we can see where
‘change’ in elevation has occurred and
can therefore measure areas of soil loss ,
and gain.
| es S| |
Pee Ser i
Interim Results —
example 5 ees ;
Yi g Ser aS
. . . ‘ ss r Se
Active landslip on upper Le
slopes and deposition PO ere
caught by dam/s ee =
When 2008 LIDAR imagery is placed over ie
the 2015 imagery we can see where :
‘change’ in elevation has occurred and
can therefore measure areas of soil loss a
and gain. . j
a a
Page 87 of 91See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.