Council archive · source document
NSC Approved Plans MCU17 0559 02 · MCU17/0559.03
Plans and drawings: the text below has words only, no drawings.
Original PDF page 2, section 3. The text section number identifies this passage in the reader.
11
tio n OL 12
25 39
0.0 00
5
Kerb & Channel
sP Ex 18
ST .83 9
LOT
ting 87 - 595m²
TR 00 11 02.F 12
0.4
00
58
it
30
07
PA .55 1 is PO
OL Ing 25 28
ST .84 7
= 238m² = 233m² = -5m²
12
PO
INC
IAN
G0
2 25 40
.83 r ou 02
PO
OL
Balcony
A
Ho ST
02
7
PO nd
us e 12 OL
Po
Steps
25 41
ST .83 5
151°48'10"
10
22 91
02.L
ol
= 40% = 39% = 1%
.96 PO
FE 6 12 OL
01 42
CO 25
10 R PA ST .83 6
20 63
5900
LI NG 02
10 10 .96 12 .F 12
22 BB 1 43 PO
10 20 21 20.40 01 25 OL 53
20 20 .44 KI 10 8 EG ST
.83
7
25
KI 03.60 8
KL
01
4 2002 23 01 02 ST .77 7
02
KI 02.42 4 PO
OL PO
12 OL
25 44
ST .83 7 Ga
02.F
rd
Edge of Kerb
PO
OL 12
en
Concrete Driveway
11
23 91
BR .72 7
W02
TIM
BE R
12
25 73
ST
.69
03
6
DE
12
25
45
ST .83 2
02.F
PO
OL
12
25 51
25 52
ST
.77
02.F
2
PO
OL
12
26 15
FE .88 0
04
GT
PLOT RATIO:
20 .5
CK
ST .80 9
P1
12
25 46 02.F
ST .83 3 PO
03
02.F OL
25.5
PO
16
REQUIRED PROVIDED DIFFERENCE
OL
12
De 25 47
.83
12
25 50
.75
4
ck See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
NSC Approved Plans MCU17 0559 02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.