Council archive · source document
13441 SARA Concurrence · OPW16/0125
Attached to the e-mail OPW 16/0125 - Operational Works Application.
SPL-0516-030663 Our reference: SPL-0516-030663 Attachment 2—Reasons for decision to impose conditions The reasons for this decision are: To ensure the development is carried out generally in accordance with the plans of development submitted with the application To ensure that at all times, all lights on or above the development site do not interfere with safe navigation in surrounding waterways. To ensure the development does not encroach on the navigation corridor or high risk maritime zone to ensure the safe passage of vessels. To ensure that debris from the development does not create a hazard to navigation. To ensure that there is no residual material that could create a hazard to navigation. Development works must comply with the approved plans to avoid unacceptable impact on coastal values and physical coastal processes. RPEQ signoff indicates the development is appropriately designed and is structurally sound. Ensures that the coastal resource (State land) is appropriately administered under the Coastal Protection and Management Act 1995 and the Land Act 1994. Ensures impacts on coastal values (water quality) are avoided or minimised. Ensures importation of materials does not result in adverse impacts on coastal values. Chemical and other contaminants have the potential to have an unacceptable impact on coastal values. Damaged structures can impact on coastal resources and public safety. Department of Infrastructure, Local Government and Planning Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
13441 SARA Concurrence.pdfRelated documentApplication case desk ↗
About this file
- File size
- 247 KB (small file)
- File type
No other editions are linked here.