11. Electrical conduits or other services proposed to be installed within existing and proposed
road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
driveways or significant vegetation must be installed by boring. Trenching is not permitted,
unless specifically approved by Council.
Earthworks and Retaining Walls
12. All earthworks and associated retaining structures/batters, both above and below ground
level, both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
13. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development.
14. All excavation and dewatering works must be undertaken in accordance with the
recommendations provided by ADG Consulting’s Dewatering Management Plan
(ADG1580.23, Rev. 0) dated 28 September 2023 and in a manner that will not cause
environmental harm or damage to surrounding infrastructure or property as a result of the
developments interaction with actual or potential Acid Sulphate Soils or groundwater.
15. All excavated material must be treated for Acid Sulfate Soils generally in accordance with
the recommendations provided by Pacific Geotechnical’s Acid Sulfate Soil Investigation
Report (PG-10899, Ver. 3) dated 28 November 2023.
Treated material must undergo verification testing at the rate of one sample per 250m3
throughout the duration of the excavation phase of the development. The verification testing
must be undertaken by a qualified person in accordance with the Queensland Acid Sulfate
Soil Technical Manual: Soil Management Guidelines v4.0, and the results must be submitted
to Council for appraisal when requested during construction and prior to commencement of
use and must demonstrate that the material has been adequately neutralised.
Certification of the verification results for compliance with this condition must be provided by
a suitably qualified Geotechnical Engineer prior to the issuing of the certificate of
classification for the dwelling.
16. Fall protection must be provided to retaining walls that are over 1m high.
17. Slope and batters are a maximum grade of:
a. 1 in 6 where in proximity to waterbodies;
b. 1 in 4 for grassed areas;
c. 1 in 3 for planted areas; and
d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
18. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
19. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g., by blocking or interfering with natural overland flows).
20. Prior to the completion of the development, all site surfaces must be effectively stabilised
using methods which have achieved effective short-term stabilisation and which will continue
to achieve effective stabilisation in the medium- to long-term (refer to E&SC Advisory Notes).
For the purpose of this condition, an effectively stabilised surface is defined as one that does
not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion
or lead to sedimentation, or lead to water contamination
Page 3 of 7
Document Set ID: 25156139
Version: 2, Version Date: 10/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW26 0094 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 154 KB (small file)
- File type
No other editions are linked here.