Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Synergy Property Partners- Noosaville- Town Planning Report_REVA

Attached to the e-mail MCU15/0095 & REC15/0022 IDAS Forms, Report & Plans (1 of 3).

of 40

Page text shows just the words. Original shows the document exactly as it was published.

TfA Project Group Pty Ltd                                            Synergy Property Partners- Noosaville- Town Planning Report


3.2.6. Utilities


All necessary utilities and services are currently available to the site. This includes all dedicated stormwater, sewer,
water and electrical / communications points to connect into.


3.2.7. Miscellaneous


The air / water facility will be located at car parking space 1 on the southern boundary adjacent to Eumundi-Noosa Road.
The refuse storage area will be located at the eastern boundary adjacent to the petrol building and will be suitably
screened with a barrier and will be set back from the refuelling forecourt area.


The vent pipes and breathers will be located in a landscaped area on the northern boundary in the landscaped area.


3.2.8. Signage


This application will comprise signage for indicative purposes only. An Operational Works Application will be lodged at a
later stage.


3.2.9. DA Drawings


Refer to Appendix A for the design DA drawing package of the proposal. For reference, the drawing titles and plan
numbers are shown in the table below.
                                                Table 1: Drawing Reference List
                   Drawing Name                                              Drawing Number
                   Site Locality Plan and site views                         15193- D01

                   Proposed Site Layout                                      15193- D02

                   Proposed Building Floor Plan                              15193- D03

                   Site and Building Elevations                              15193- D04

                   Site Perspectives                                         15193- D05

                   Landscaping Concept Layout                                15193- D06

                   Erosion and Sediment Control Plan                         15193- D07

                   Pre-development Catchment Plan                            15193- D08

                   Post-development Catchment Plan                           15193- D09

                   Site grading and stormwater drainage                      15193- D10

                   HRV Turning Path                                          15193- D11

                   Tanker Turning Path                                       15193- D12

                   Site Queuing Plan                                         15193- D13

                   Potential adjoining lot layout                            15193- D14




                                                          Page 11 of 30                                                        6/10/2015
Log in to download the original file

Synergy Property Partners- Noosaville- Town Planning Report_REVA.PDF · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.