bock of herb KERB & CHAMNEL Of INVERT CROSSING
CROSSOVER DETAIL
(Scale 1:20)
THIS FOOTING [S FOUNDED BELOW CRITICAL
DEPTH UNE AND [S STABLE.
PIERS OR UNDERPINNING FOUNDED BELOW THE
CRITICAL DEPTH LINE WOULD BE NEEDED TO
‘SUPPORT ARY FOOTING THAT (S FOUNDED
ABOVE THE CRITICAL DEPTH UNE.
FOOTING WTHOUT PIERS 1S FOUNDED
4 I HS
BT EE ae
LUNE OF PROPOSED EXCAVATION EXCAVATION OR
TRENCH.
Ww SPRAYED. 25MPo
7 CONCRETE FACING
SU72 WESH MIDDLE
SATURATE GROUND ADJACENT
EXCAVATION FOR A MINUUM OF
24 HOURS PRIOR TO WORKS
COMMENCING.
CTION ~ SPRAYED C EMBANKMENT
EXISTING DRIEWAY TO
BE REMOVED
NOW KERB & CHANNEUNG 10 BE
REMSTATED 10 NOOSA SHIRE
COUNCL STANDARDS.
2 = SILT RETENTION RAINAGE
Scdle 1: 200
Der
900{4) GEO-FABRIC SLI ae
FENCE, FXED TO SPKES ————— Pa poh TD
SILT RENTENTION FENCE DETAIL
Depth determined
on-site.
VENTURA ST
LEGEND
_- 7 7 INDICATES EXISTING SURFACE
43.00 CONTOUR AND LEVEL TO AHD.
‘ATIONS BE DEPARTED FROM WITHC:, © -—SL- SLT RETENTION FENCE TO DETAIL
[72) ‘INDICATES PROPOSED FINISHED SPOT
SURFACE LEVELS TO AHD.
+ EXISTING SURFACE SPOT LEVELS.
reler general notes.
25mm Asphallic Surfacing to N.S.C specifications
150 Base course type 2.1 CBR 80
150 Sub=base course lye 2.3 CBR 45
Sub-grode preperation in accordance with specifications /noles
BARRIER KERB & CHANN
Barrier Kerb & Channel
f to NSC standord
Extend sub-base 150mm
passed bock of kerb.
CONSTRUCTION NOTES
GENERAL: -
1. Do not scale fram this drawing.
2. At dimensions in millimetres
3. Selting out dimensions are to be obtained from the architectural
drawings.
4, Any discrepancies between these drowing ond the architectural drowings
are to be referred to the engineer immediately.
5. The bulder i responsible for locating dit existing services within ond
odjocent the olotment ond shall ensure thal all new works are in
accordance with the cttoched csiticd depth line dagram.
FOOTPATHS AND DRIVEWAYS:
1. Existing footpaths to be sow cut prior to removet
2. Crossings ore nat designed for commerciol vehicles
3. Concrete driveway to de 125mm thk. excing ony finished treatments,
eg. stomping
4, Concrete surtace lolerance +5.0mm over 3.0m
5, Concrete N25 in accordance with AS 1379 ond AS 3600
6. Reinforcement fabric to AS 1304, placed centr stab depth.
7. Expansion jpints to be Oram wide wet tooled with every 2nd mesh vie
aut dong joint.
8. One access pomt permitted for each dlotment.
9. For curved drivesays, maximum grades apply to inside edge of cure
10. AB seraces to be located and protected es required prior lo work
tssue: TENDER NOT FOR CONST.
SC Sara Sit “pte
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
OPERATIONAL WORKS & DRAINAGE.
Title:
Project Lot 29 Ventura Street,
Sunrise Beach.
Oate: Oct 2007. Drg No. 17003-OW1 > |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2104 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 682 KB (small file)
- File type
No other editions are linked here.