Landscape Specification Report URB-P0003847-001-SP (A)
LANDSCAPE
SPECIFICATION
SUNRISE -
GRASSTREE COURT
For OPW Approval
Prepared for
LENDLEAS ON BEHALF OF BLUECARE
P0003847-001-SP
6th April 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 37 pages
Page 2
URBIS STAFF RESPONSIBLE FOR THIS REPORT WERE:
Director Glen Power
Associate Director Sam Burns
Senior Consultant Simon Madigan
Consultant n/a
Project Code P0003847
Report Number P0003847-001-SP
DOCUMENT CONTROL
REVISION DATE DESCRIPTION WRITTEN BY APPROVED BY
A 06.04.22 For OPW Simon Madigan Simon Madigan
Urbis’ Economic and Social Advisory team has received ISO 20252 Certification
for the provision of Economic and Social Research and Evaluation.
Certificate No.: MSR 603559
All information supplied to Urbis in order to conduct this research has been treated in the strictest confidence.
It shall only be used in this context and shall not be made available to third parties without client authorisation.
Confidential information has been stored securely and data provided by respondents, as well as their identity, has been treated in the
strictest confidence and all assurance given to respondents have been and shall be fulfilled.
© Urbis Pty Ltd
50 105 256 228
All Rights Reserved. No material may be reproduced without prior permission.
You must read the important disclaimer appearing within the body of this report.
urbis.com.au
URBIS
URB -P0003847-001-SP ii
Page 3
CONTENTS
CONTENTS ........................................................................................................................................................3
1. NOTES TO THE CONTRACTOR .......................................................................................................1
1.1. Scope of Work .....................................................................................................................1
1.2. Definitions ............................................................................................................................1
1.3. Qualification .........................................................................................................................1
1.4. Tender contract ....................................................................................................................2
1.5. Site Conditions .....................................................................................................................3
1.6. Local Business Notes ..........................................................................................................3
2. QUALITY AND RESPONSIBILITIES .................................................................................................4
2.1. Safety and Conducts............................................................................................................4
2.2. Environmental Protection .....................................................................................................4
2.3. Existing works ......................................................................................................................5
2.4. Quality & Regulations ..........................................................................................................5
2.5. Products and Materials ........................................................................................................5
2.6. Material and Soil Testing & certification...............................................................................6
2.7. Changes To The Design ......................................................................................................6
2.8. Plant Procurement ...............................................................................................................6
3. EXECUTION OF WORK .....................................................................................................................7
3.1. Program and Management Plans ........................................................................................7
3.2. Site Preliminary Works.........................................................................................................7
3.3. Demolition ............................................................................................................................7
3.4. Earth works ..........................................................................................................................7
3.5. Setting Out ...........................................................................................................................8
4. CRITICAL HOLD POINTS ..................................................................................................................9
4.1. Hold point schedule .............................................................................................................9
9.1. General Specifications .......................................................................................................11
9.2. Edge Types ........................................................................................................................11
5. SOIL ..................................................................................................................................................12
18.1. General Specifcation..........................................................................................................12
18.2. Soil Types ..........................................................................................................................14
6. GARDENS ........................................................................................................................................18
19.1. General Specification .........................................................................................................18
19.2. Garden Profiles ..................................................................................................................19
7. TURF .................................................................................................................................................20
20.1. General Specifications .......................................................................................................20
20.2. Turf Profiles ........................................................................................................................21
8. PLANTING ........................................................................................................................................22
21.1. General Specifications .......................................................................................................22
21.2. Plant Installation.................................................................................................................23
9. INSPECTIONS ..................................................................................................................................24
25.1. Inspection schedule ...........................................................................................................26
10. ESTABLISHMENT MAINTENANCE ................................................................................................27
26.1. General ..............................................................................................................................27
26.2. Tree transplanting / protection maintenance .....................................................................27
URBIS
URB -P0003847-001-SP iii
Page 4
26.3. Establishment Maintenance Log ........................................................................................28
26.4. Establishment Maintenance Tasks ....................................................................................29
Appendix A ......................................................................................................................................................32
URBIS
URB -P0003847-001-SP iv
Page 5
1. NOTES TO THE CONTRACTOR
The following specification outlines the tender, construction and maintenance instructions for the Contractor
to undertake Landscape Works as documented by the URBIS document set.
1.1. SCOPE OF WORK
The scope of works is described in the Landscape Works Package which includes:
• These Specification Notes
• Plant Schedule
• Drawings;
and any other documentation, which may be issued during the tender period and the construction of the
works. Refer also to documentation prepared for the project by other Consultants.
The Contractor shall be responsible for and shall provide all necessary materials, labour and equipment to
carry out the works shown in this package.
1.2. DEFINITIONS
‘Contractor’ means a person, business or company who has entered into a Contract with the
Head Contractor or Client to provide landscape works as described in the Contract,
the contract drawings and contract specification. This includes employees, sub-
contractors and agents of the person, business or company
‘Landscape Architect’ means the nominated representative of URBIS working on behalf of the client
through whom all communications in relation to work under the contract shall be
given
‘Superintendent means the nominated representative of the Head Contractor or Client through whom
all communications in relation to work under the contract shall be provided
‘The Works’ the activities included in the Contract that have been outlined in the tender
documentation inclusive of this specification
‘The Site’ the area where the contracted works are to be undertaken
‘Establishment Period’ equivalent to the specified maintenance period
‘Defects Liability Period’ equivalent to the specified maintenance period
‘Sub grade’ means the level at the underside of garden topsoil
1.3. QUALIFICATION
Contractor’s personnel shall be suitably qualified and competent in all aspects of landscape works and shall
be conversant with all relevant Australian Standards and other revenant relegations / guidelines.
URBIS
URB -P0003847-001-SP PAGE 1
Page 6
Landscape works must be supervised by an onsite qualified foreman who is experienced in this work. The
whole of the work must be executed to the requirements of the specification.
Landscape Qualified Person is:
• For Supervising landscape construction and establishment works - is considered to be a person with 5
years current experience in commercial landscape construction projects.
• For undertaking rehabilitation construction and establishment works - is considered to be a person with 5
years current experience in commercial land revegetation and regeneration.
• For being the supervising Project Arborist and preparing arboreal certification - is considered to be a
person with level 5 AQS qualification in Arboriculture and a minimum 5 years current experience in tree
protection, hazard identification / mitigation and NATSPEC (Guidelines: Specifying Trees) assessment.
• For assessing and certifying soil quality - is considered to be an Agronomist with 3 years current
experience in soil testing
• For all maintenance work to new and existing trees – is considered to be an arborist with formal
qualifications (Level 3 Australian Qualification Framework) or at least five (5) years recognised
experience in Arboriculture.
1.4. TENDER CONTRACT
The lowest cost of any Tender will not necessarily be awarded the project. If the project is to be awarded to a
Contractor, the Contractor must first supply fully completed schedules, all required supporting information
and then will be required to enter a formal contract with the Head Contractor / Client.
During the tender period the Contractor is encouraged to offer alternative methods and materials to those
specified in this Specification where such alternatives can be shown to either reduce materials costs,
improve quality, reduce construction time and or save money while maintaining quality and design intent.
Provide these alternatives and their specific benefits in a separate letter or spreadsheet to this Specification
for review and discussion during the tender assessment period.
No alternative products are to be substituted for specific products listed in this schedule for the
inclusion of the tender. Any substitutions recommendations are to be listed separately with their
costs, as above.
List inclusions in detail including preliminaries and any other works or costs, and costs allowed for each, that
make up your total price shown for the documented works. Tendered format to supply details of quantity,
rate per item, and total cost. For example, a tendered rate of 1 qty of plant stock with a total cost will not be
acceptable.
It is the Contractor's responsibility to calculate all quantities and include all materials necessary to carry out
the works. Provide for all inspections, fees, escorts and permits required by Federal, State and local
authorities in supply, transport and handling of the specified materials. Where quantities are given, they are a
guide only and do not form part of the contract.
Report to the Superintendent and Landscape Architect of the adequacy of the documentation issued and any
discrepancies or shortfalls in information. Failure to report will imply unqualified acceptance and
understanding.
The Contractor is to be fully insured and make all required provision for Workers Compensation. If
requested, proof must be provided to the Superintendent.
If the Contractor intends to claim additional time and/or cost arising out of latent conditions, requests to carry
out additional works, instructions or any other circumstance then they must notify the Superintendent in
URBIS
URB -P0003847-001-SP PAGE 2
Page 7
writing. The Superintendent is not obliged to make any additional payment or accept any increase in the
contract period unless agreed prior to the Contractor beginning work.
1.5. SITE CONDITIONS
The Contractor shall inspect the site, and examine all plans, drawings and reports, and check all aspects of
work under the Contract and refer any discrepancies to the Superintendent for decision, prior to
commencement. Failure to do so will not be taken as a reason to claim a variation.
• Existing site conditions;
• Site access and storage requirements.
• Check all relevant dimensions on site before proceeding with work.
• No claim for extras arising from failure to obtain measurements and other information on site will be
allowed.
• It is the Contractor's responsibility to thoroughly inspect the site and to assess the quantity of cut and fill
of earthworks required to achieve the grades indicated on the grading plans.
1.6. LOCAL BUSINESS NOTES
Contractor is encouraged to maximise local industry participation in major procurement opportunities, by
providing local industry with full, fair and reasonable opportunity to tender.
The principle of full, fair and reasonable opportunity can be achieved by:
• considering the project’s whole-of-life from design to completion and ongoing maintenance
• ensuring at the tender preparation stage that tenders are packaged in a manner that optimises local
industry opportunities while enhancing project competitiveness and value for money
• undertaking a supply market analysis to identify potential local suppliers
• using Australia and New Zealand (ANZ) standards and codes ‘or equivalent’ in the formulation of
specifications, tenders and the letting of contracts, wherever it is practicable to do so
• providing early notice to the market of a planned upcoming major procurement
• encouraging sub-contractors to support and report against the charter principles
• using the services of local content specialists such as Industry Capability Network Queensland (ICN Qld)
and supporting the use of these specialists by sub-contractors.
Full, Fair and Reasonable Opportunity
The provision of equitable opportunity for capable local industry to participate in the procurement activity by
ensuring:
• Full: Local industry has the same opportunity as other potential suppliers to participate in all aspects of a
project from design through to completion, in all supply and ongoing maintenance.
• Fair: Local industry is provided the same opportunity as other potential suppliers to compete for
investment projects and other market based contracts on an equal and transparent basis.
• Reasonable: Tenders are free from any unreasonable specifications or requirements that could rule out
local industry and are structured in such a way as to provide local industry the opportunity to participate.
This definition is consistent with the Australian Industry Participation National Framework.
Procurement
Procurement is the entire process by which all classes of resources (human, material, facilities and services)
are obtained. This can include the functions of planning, design, standards determination, specification
writing, selection of suppliers, financing, contract administration, disposals and other related functions.
URBIS
URB -P0003847-001-SP PAGE 3
Page 8
2. QUALITY AND RESPONSIBILITIES
2.1. SAFETY AND CONDUCTS
The Contractor is responsible for (if not done so by the Head Contractor already):
• carrying out the Contract in a safe manner. Taking due care to prevent injuries to the public or to people
involved in the project.
• ensuring the supply and erection of construction zone fencing to protect their works for the duration of
the contract works.
• coordinating and facilitating pedestrian and vehicular traffic flow safely and unhindered around and the
works/site.
• Ensure there is to be no foul language, racist, sexist, violent or degrading behaviour.
If there are periods of reduced accessibility to the site and/or properties around the Contractor must provide
to the Superintendent a written report detailing the time and length of any periods of reduced accessibility.
The Contractor will immediately notify and furnish a written report to the Superintendent if any of the
following occurs in connection with the works:
• Accidents involving death or personal injury;
• Accidents involving loss of time;
• Incidents with accident potential such as equipment failure, collapses and the like.
2.2. ENVIRONMENTAL PROTECTION
The Contractor will ensure that all materials and the execution of the work are ecologically sound,
environmentally benign and consistent with the principles of sustainable development.
The Contractor is to ensure that no damage occurs to any existing trees or other plants which:
• Are specified to be retained;
• Are beyond the extent of works;
• Need not be removed or damaged during the course of the works.
The Contractor will prevent the spread of dirt and mud along roads and paths. The Contractor will install silt
and sedimentation control for the work.
At all times the Contractor shall ensure that dust resulting from work in progress including excavation,
backfilling, grading and dust from stockpiles is kept to an absolute minimum by use of a water truck or other
approved methods.
Construction works shall be undertaken pursuant to the Environmental Protection Policy – Noise (EPP) in
relation to control of noise from construction activities.
The Contractor will be responsible for assessing any potential wildlife problems when tendering and during
the course of the works. Allowance must be made for any protection or control of such pests the Contractor
deems necessary including the prevention of Fire Ants entering the site via equipment, machinery, materials
or plant stock.
Subsequent wildlife damage to planting or other works will be deemed as defective work and subject to
replacement as per the normal contract conditions. Any proposed method of protection or control of pests
must be agreed with the Superintendent prior to use on site.
URBIS
URB -P0003847-001-SP PAGE 4
Page 9
Landscape works must not obstruct overland flow paths and must include adequate drainage to minimise ponding. Mulch or any floatable material must not be located in swales, overland flow paths or around grated drains; and must not encroach onto kerb and channel, footpaths, pedestrian or vehicular/ circulation areas. 2.3. EXISTING WORKS Where works are adjacent to existing works, the Contractor is responsible for making the proper junction between new and existing works. The Contractor shall not disturb the existing ground surface outside of areas or locations shown on the Drawings. The Contractor is to repair or replace any damaged softscape, paving, kerbing, walls, fences, services, building facades or structures inside or outside the extent of works, which were damaged due to the Contractors. 2.4. QUALITY & REGULATIONS Performance of work is to be in accordance with all applicable laws, rules and regulations required by authorities having jurisdiction over such work. All work needs to comply with the National Construction Code (NCC) and Australian Standards. Further the Landscape works need to be compliance is with the: • Conditions of Approval • Approved Plan of Development • Approved Infrastructure Master Plan • Approved Concept Landscape Report Any work which is not complying need to be notified to the Landscape Architect. The landscape works must be coordinated with all relevant authorities and required development permits. If fire ants are suspected on the development site or locality, the relevant authorities must be contacted, being at the time of printing - the Department of Primary Industries & Fisheries Call Centre on 13 25 23. If Myrtle Rust is suspected on the development site or locality, the relevant authorities must be contacted, being at the time of printing – Biosecurity Queensland on 13 25 23 Any work or materials, which, in the opinion of the Landscape Architect, do not meet appropriate industry standards of workmanship or quality will be rejected. It will be the Contractor’s responsibility to remove rejected work and reinstall it to an acceptable standard at no additional cost to the Head Contractor / Client. 2.5. PRODUCTS AND MATERIALS Substitutions, product details and technical information for all materials and proprietary items are to be submitted to the Landscape Architect, and written approval gained prior to inclusion into the works. Obtain and submit reports on relevant tests by an independent testing authority as per this Specification or as requested by the Landscape Architect and/or Superintendent. Overseas products and materials must be accompanied by relevant certification from a registered Australian Testing Authority to confirm the product or material achieves the performance requirements complying with the Australian Building Code, Australian Standards, Green Star Requirement (if applicable) or any other relevant standards. All materials and products are to be without sharp protrusions or abrasive edges, obtrusive fitting or fixtures. Each colour is to be a uniform finish and there is to be no staining of adjacent materials. All materials are to be corrosion free. URBIS URB -P0003847-001-SP PAGE 5
Page 10
All materials liable to deteriorate by exposure to the weather shall be kept under cover at a location approved by the Superintendent and the Contractor shall be held responsible for loss or deterioration occurring in the course of loading, unloading, transit or storage, no matter what the cause. Supply samples as stated in the respective sections of this Specification. The Contractor is required to gain written approval from the Landscape Architect prior to inclusion into the works. If sample is not approved, samples are to be rectified or removed and replaced as required by the Landscape Architect. If approved, samples may be retained to form a part of the completed works. Following approval, all remaining works are to match the quality of the sample. 2.6. MATERIAL AND SOIL TESTING & CERTIFICATION Any testing required must be carried out by an authority registered with the National Association of Testing Authorities (NATA) to perform the specified testing. The Contractor shall provide Construction Certification Form 16 for all proposed structural elements certified under Form 15. Contractor will need to provide Certification Form 15 for all design and construct components (ie. timber decking). Provide confirmation of luminosity testing of specified tactile surface ground indicators on sample section of concrete pavement. Soil testing If site soils are to be used, it is the Contractors responsibility to undertake testing to ensure that all site soil is suitable for use, and complies with the requirements set out in Section 19 of this document. Any rectification to the existing site soil required to bring it to the standard required. To be carried out by the Contractor. All laboratory testing of work carried out shall be performed by a soil laboratory with the NATA and are to conform with all relevant Australian standards. Site soil sampling shall be carried out in locations selected by the Landscape Architect. Recommended soil laboratory is SESL Australia. 2.7. CHANGES TO THE DESIGN Any constraints at site and due to those changes to the documented design need to be reported to the Landscape Architect. The Contractor is not to proceed without a written approval by the Landscape Architect. 2.8. PLANT PROCUREMENT The Contractor will provide photographic evidence of the trees and plants to be supplied immediately upon award of the Contract. At award all trees and plants are to be secured immediately, with confirmation in writing accompanied by photographic evidence of plant stock. All trees and palms are to be tagged and numbered and photos have to be supplied from at least 3 different angles of the specimen. Notification is to be provided to the Landscape Architect to enable nursery site visit to be carried out for final approval. If suitable plant species stock is not available due to ordering not occurring immediately upon award of construction contract, the Contractor is responsible for supplying suitable matching species in a larger stock format at the approval of the Landscape Architect. It is the Contractors responsibility to inspect all plant stock delivered to site, prior to unloading from delivery truck. Any plant stock not suitable for installation will be rejected and sent back for replacement. Any stock that is unsuitable for installation due to poor form, heat, wind or water shock, overgrown form, disease, root binding or other damage is to be rejected. If any unsuitable stock is installed, and then rejected by the Landscape Architect, the rejected stock will be replaced by the Contractor at their expense. URBIS URB -P0003847-001-SP PAGE 6
Page 11
3. EXECUTION OF WORK
3.1. PROGRAM AND MANAGEMENT PLANS
Provide all work method statements, programs and quality assurance manuals, which are to be prepared
and updated as required by the Contractor. Confirm with the Superintend the full list of required documents.
These may include but are not limited to the following:
• Construction Program which includes supply, lead times, delivery to site and installation of all Landscape
Works
• Environmental Management Plan which will include, noise, dust, vibration, sedimentation and water
management controls;
• Access Management Plan which will include pedestrian, bicycle and vehicular traffic management and
indicate proposed construction fencing details, extent and duration;
• Safety and Incident Management Plan which will include safe-work methodology, incident management
protocols and risk management initiatives proposed by the Contractor;
• Method Statements where noted on the drawings
• Dilapidation Survey which includes detailed photographic record of the conditions of adjacent existing
trees (trunks and canopies), buildings, awnings, structures, features, poles, street furniture and the like,
adjacent to the works before commencing any site works.
• As Constructed and Record Drawings which includes Cad and PDF drawings showing all constructed
elements, all amendments, locations of all drainage and irrigation lines and other underground services
including any existing services uncovered during construction
3.2. SITE PRELIMINARY WORKS
The Contractor shall be responsible for any exploratory works required to ascertain the exact position of
existing services and required processes to ensure their protection. All employees are to be made aware of
any underground services.
Prior to commencing work the contractor is to contact the Landscape Architect to attain the most current
document package.
Install anything required to complete the works including but not limited to:
• Temporary Contractor's facilities;
• Environmental protection;
• Protection of work and making good;
• Construction and tree protection zone fencing (1800mm high chain wire mesh fence panels on concrete
"feet"). Confirm if fencing has already been installed or is within the Head Contractor’s scope;
• Public safety measures and provision for vehicular and/or pedestrian traffic control around the site
(Confirm the extent required with the Head Contractor).
3.3. DEMOLITION
Confirm with Head Contractor the extent of Landscape Contractor scope. Demolish and remove all items
shown on the demolition plan to be removed. Retain and protect all items noted to be retained and protected.
Traffic sign to be removed accordance to traffic engineering documentation if applicable. Tree removal
accordance to tree removal plan (issued separately).
3.4. EARTH WORKS
General
URBIS
URB -P0003847-001-SP PAGE 7
Page 12
Cut and fill as required to complete the works. Assumption that civil earthworks will provide finished levels +/- 150mm from required landscape levels. Refer to Civil documents to confirm provided finished levels. Remove spoil and excess fill from site. The Contractor will be required to achieve smooth even grading to landscape areas. The Contractor shall allow to remove existing plant matter, debris, rubble or other loose materials likely to interfere with the new work, and consolidate the filling to all resulting excavations. The Contractor is required to carry out final trimming of the entire works of the grades. Any areas of discrepancy from the Drawings should be brought to the attention of the Landscape Architect. Fine grading shall be undertaken with a tolerance of ± 25mm. Spot levels take precedence over contour lines and ground profile lines. The subgrade is to be compacted to 95% minimum dry density ratio (+ 0mm- 25mm of design levels) prior to sub-base placement. Any areas of soft ground are to be excavated & replaced with suitable fill and compacted to prevent subsidence. Provided that all areas are free draining, and no ponding of water occurs. Subsoil drains to have minimum fall of 1:100. Filling in layers approximately 150 mm thick compacted to 85% of the dry density ratio of the surrounding soil as determined by AS 1289, to minimise slumping and further internal packing down. Corners and intersections of planes shall be rounded gradual and curves generous. To grading from edgings, provide horizontal shoulders, minimum width 500 mm, before any change of level. Earth Mounds Planting mounds shall be formed from topsoil to the depths as required. The profile shall be such that the placement of topsoil, soil mix and mulch shall bring the mounds to the finished levels shown on the drawings. Slopes to mounds shall be no greater than 1:3 unless otherwise shown on the drawings. Ensure existing ground levels in locations of mounds are deep ripped 150mm prior to formation of mounds. Rake over all mounds for smooth profile. Filling in layers as stated above. 3.5. SETTING OUT Prior to commencing each stage of the Landscape works, set out alignments of all paths, walls and planting must be inspected and approved by the Landscape Architect. This may include key set-out points for pavement pattern. URBIS URB -P0003847-001-SP PAGE 8
Page 13
4. CRITICAL HOLD POINTS
The Contractor must request the Landscape Architect to attend inspections or provide approval at the
required critical hold points noted in this document. It is the Contractor’s responsibility to adequately notify
the Landscape Architect.
Sufficient allowance of timing needs to be provided for to allow for rejection of works and re-work or re-
ordering of materials, to then not affect the overall project delivery timeframes.
Lead times for ordering of all components in addition to and allowing for hold point inspections or shop
drawing reviews must be organised by the Contractor.
Any failure to co-ordinate these points resulting in delays, or demolition and re-construction of works,
extension of maintenance periods or ability for handover certification to be undertaken, are the responsibility
of the Contractor.
4.1. HOLD POINT SCHEDULE
HOLD POINTS
1 Council / Authority approvals conditions have been supplied to Contractor / Head Contractor, and
incorporated into the Construction Documentation set
2 Tree, palm and plant species stock ordering, upon award of construction contract. Early approval is
critical to avoid construction delays
3 Advanced tree and palm nursery stock approval obtained from the Landscape Architect either through
photos supplied or via nursery visit.
URBIS
URB -P0003847-001-SP PAGE 9
Page 14
HOLD POINTS CHKD DATE / NOTES
Soil Testing
X Soil testing of proposed imported soils supplied to Landscape Architect for
approval. Early testing and approval critical to avoid construction delays
X Soil delivery dockets showing Soil Supplier and batch information. Copies
of dockets to be supplied to Landscape Architect for approval and record.
Set out
X Set out of hardscape areas. Photographs supplied to Landscape Architect
for approval or Landscape Architect site inspection
X Set out for walls and edges
Grading
X On-Grade subsoil drainage installed and tested prior to backfilling.
Photographs and written confirmation supplied to Landscape Architect
Planting
X Photographs of all smaller stock species to be to Landscape Architect for
approval
X Written confirmation from nurseries that any plant stock located within
shade houses have been relocated to allow for full sun hardening 4 weeks
prior to delivery date
X Cultivated subgrade to all turf and planting areas to specified depths. Site
inspection by Landscape Architect or photographs of all areas of cultivation
supplied for approval. Critical that this is recorded and approved.
X Site fencing installed to exclude all site traffic from cultivated areas.
Photographs provided to Landscape Architect for approval. Ensure no
cultivated areas are recompacted by site traffic. This is critical to ensure
long term plant growth success.
X Setout and installation of tree trenches. Photographs supplied to
Landscape Architect for approval
X Plants / transplant when delivered to site, prior to being unloaded from the
truck Contractor to check for transport related damage, plant form and
suitability for installation.
URBIS
URB -P0003847-001-SP PAGE 10
Page 15
5. EDGES 5.1. GENERAL SPECIFICATIONS Samples Install a minimum 2.5m long typical portion of each different edge type showing materials, colour, finish and joints for approval by the Landscape Architect. If acceptable, this sample should be retained as a quality benchmark and shall form part of the finished works. 5.2. EDGE TYPES ED01: Edge Type – Concrete edge Material - In-situ concrete (grey Portland cement), 25 mpa or as per Noosa Shire Council requirements Dimension - 100mm wide x 100mm deep, 5mm rounded chamfer to top edges Sub-base depth/material - 100mm compacted road base Expansion joints - 10mm wide Abelflex, max. 5m spacing. Connection reinforcing rod between expansion joints Surface Finish - Smooth trowel finish Colour - Plain grey Levels - Top surface is to finish flush with the adjacent kerbs or pavement ED02: Edge Type– Timber Edge Material - CCA treated hardwood (HW), rough sawn, treatment Class H5 or as per Noosa Shire Council requirements Material dimensions - 100mm tall x 25mm wide Stakes / support - 50 x 50mm HW. Length suitable to be driven firmly into the ground (450mm typ). Install sufficient stakes and nails to hold the edge firmly in position and true to the design line, minimum1 stake per 2 Lm Joins - Connect individual edge timbers with a 1m length of edging set down 20mm below the main edge pieces and fixed to them to achieve a smooth line Colour - None to be applied Levels - Top surface is to finish flush with the adjacent kerbs or pavement URBIS URB -P0003847-001-SP PAGE 11
Page 16
6. SOIL 6.1. GENERAL SPECIFCATION Quality assurance and control Soil sample testing results are to be provided to ensure soils meet the specification requirements prior to installation. If the samples do not meet the performance specification corrective actions have to been undertaken with no additional cost to the Superintendent. Samples reports are to be submitted to the Landscape Architect, and written approval to be obtained before using the soil. All testing as required by the product specifications must be arranged by the Contractor, and carried out by an accredited laboratory. The test certificate will be accompanied by a statement of compliance from a competent person (e.g. qualified agronomist horticulturist or soil scientist). Testing facility shall be SESL Laboratories. Compliance certificates will be in the form of a report clearly stating the material is compliant, with an attachment showing the test results. In the case of minor non-compliance or substantial compliance, a clear statement must be obtained from a qualified independent agronomist waiving the compliance and certifying the sample is compliant with or without conditions. Soil testing All laboratory testing of work carried out shall be performed by a soil laboratory with the NATA and are to conform with all relevant Australian standards. Site soil sampling shall be carried out in locations selected by the Landscape Architect. Recommended soil laboratory is SESL Australia. No soil will be purchased or installed until initial compliance testing certification has been demonstrated and approved by the Landscape Architect. Delivery dockets for all imported soil is to be provided to the Landscape Architect immediately upon delivery, to demonstrate the approved soils are being supplied. Manufacturer’s product representation For imported soils from manufacturers, a ‘product representation’ document produced by the supplier may be accepted as a compliance certificate if: • it is an off-the-shelf product line, not a custom mix • a representative test certificate is available and is acceptably recent (within 1 month) • the testing covers all those criteria in the URBIS performance specification and complies • the manufacturer’s quality assurance system is externally certified. Quality control during construction The contractor must submit samples of blended soils or imported soil mixes at regular intervals during construction for the purposes of demonstrating continued compliance of quality control. Test submissions & Frequency Submit representative samples of ~5 kg of each product specification, packed and labelled to indicate the source and the specification to be met. The samples must be taken in a representative manner. The contractor must refer to the testing frequencies indicated in Table 1. Variations to the frequencies in this table are permitted on the submission to the Landscape Architect of an alternative testing program that clearly achieves the desired outcome of quality control. Materials supplied from operations that have a third- party-endorsed quality assurance program may be acceptable pending submission of the relevant documentation. URBIS URB -P0003847-001-SP PAGE 12
Page 17
Table 1. Outline of the required testing frequency to achieve compliance testing. Samples must be tested to the performance criteria indicated in the product specification. Specification Activity Minimum QC fest frequency On Grade soil media Turf Turf and lawn soils 1 per 1000 m3 On Grade soil media Gardens Mass planting and tree soil 1 per 500 m3 On slab soil media On slab soil All on slab turf and planting areas 1 per 100 m3 media Turf and Gardens Note: Where the delivery is less than the stated QC testing frequency, the initial compliance certification certificate must be deemed to demonstrate compliance. Minor non-compliance The Contractor will make corrective procedures to bring any soil that has been placed within compliance in accordance with the agronomist’s advice. Substantial non-compliance In the event that quality control samples and test results show substantial non-compliance from the approved performance target ranges, the Contractor is to provide methodology to rectify in place or remove and replace non-compliant soils. Record keeping Growing media initial compliance certification records must be kept in an easily retrievable manner that provides for traceability of purchase and location on site. Each compliance certification for all the product specifications used on site must be identified by date, quantity to be supplied and a copy of the formulation used to reach compliance. Each batch of soil must be identified by date of manufacture, quantity and a corresponding test result and must link into when the material was delivered and where the material was placed. Unwanted material The soil must be free from any debris, existing plant matter, rubble, waste or other contaminated materials likely to interfere with the quality of the soil. Visible contaminants smaller than 2mm shall not exceed 0.5 % of the soil mass. URBIS URB -P0003847-001-SP PAGE 13
Page 18
6.2. SOIL TYPES
The following soil test result requirements meet or exceed the current AS 4419 – 2018 requirements.
All test results must comply with the below testing requirements.
On Grade Soil Media - Turf
Quality – Soil must be free from any ‘unwanted materials’
Physical properties particle sizes
Property Units Target Range
2.0 mm (fine gravel) % retained by < 10
1.0 mm (very coarse sand) mass < 10
0.5 mm (coarse sand) 10 - 30 30 - 50
0.25 mm (medium sand) 20 - 40
0.1 mm (fine sand) 10 – 30
0.05 (very fine sand) 5 – 15 (max 25 % combine vfs, Si + Clay combined)
0.002 mm (silt) 5 – 10 (< 12 % Si + Clay combined)
< 0.002 mm (clay) 3 – 8 (< 12 % Si + Clay combined)
Large particles 2 – 20 mm = < 10 %, > 20mm = 0 %
(OM) Organic matter % dwb (dry Underlay Range 2 – 10%
content weight basis)
Permeability mm/hour > 20 (@32 drops by McIntyre Jakobsen)
Wettability (AS4419) mm/min >5
Dispensability in water 1 or 2 (AS 4419 Category)
Chemical Properties
Property Units Target Range
pH in water (1:5) pH units 5.4 – 7.5
pH in CaCl2 (1:5) pH units 5.2 – 7.5
Electrical conductivity (1:5) dS/m < 0.75
(EC)
Exchangeable Na % of eCEC <6
percentage
Exchangeable Ca/Mg ratio Ratio 3-9
Available phosphorus mg/kg 20 – 100
Mehlich 3
Olsen 20 - 50
Available nitrogen (nitrate mg/kg 20 - 60
N + ammonium N)
URBIS
URB -P0003847-001-SP PAGE 14
Page 19
On Grade Soil Media – Gardens
Quality – Soil must be free from any ‘unwanted materials’
Physical properties particle sizes
Property Units Target Range
Texture, preferred range n/a Sandy loam to clay loam
(OM) Organic matter content % dwb (dry Medium Organic Range 10 -15%
weight
basis)
Permeability mm/hour > 20 (@ 32 drops by McIntyre Jakobsen)
Wettability (AS4419) mm/min >5
Dispensability in water 1 or 2 (AS 4419 Category)
Large particles (naturally occurring)
2 – 20mm % w/w < 20
> 20mm % w/w < 10
Visible contaminants > 2mm (glass, % w/w < 0.5
plastic and metal
Chemical properties
Property Units Target Range
pH in water (1:5) standard range pH units 5.4 – 6.8
pH in CaCl2 (1:5) standard range pH units 5.2 – 6.5
pH in CaCl2 (1:5) alkaline range pH units 6.8 – 8.0
pH in CaCl2 (1:5) alkaline range pH units 6.5 – 7.5
Electrical conductivity (1:5) (EC) dS/m < 0.75
Phosphorus – P-tolerant / standard mg/kg 30 - 100
plants
Phosphorus for P-sensitive plants, mg/kg < 20
alkaline soil methods 9B1 or 9C1
Sodium (NA) % of eCEC <7%
Potassium (K) % of eCEC 3 – 15 %
Calcium (Ca) method 18F1 (or 15A1 % of eCEC 50 - 80
in alkaline soils)
Exchangeable magnesium (Mg) % of eCEC 10 - 30
Exchangeable aluminium (Al) % of eCEC <5
Exchangeable Ca/Mg ratio w/w 3-9
Available iron (Fe) mg/kg 100 - 400
Available manganese (Mn) mg/kg 25 - 100
Available zinc (Zn) mg/kg 5 - 30
Available copper (Cu) mg/kg 1 - 15
Available boron (B) mg/kg 0.5 - 5
Available nitrogen (nitrate N + mg/kg > 20
ammonium N)
URBIS
URB -P0003847-001-SP PAGE 15
Page 20
On Slab Soil Media A - Garden Upper Horizon
Quality – Soil must be free from any ‘unwanted materials’
Physical Properties
Units Target range
Property
Texture, preferred range n/a Gravelly loamy sand to organic
sandy loam
Air-filled porosity (AFP) % ≥ 10
Chloride % ≥ 40
Water holding capacity % ≥ 30
Permeability (@ 32 drops by McIntyre mm/h > 40
Jakobsen)
Saturated Density kg/L < 1.2
(OM) Organic matter content % dwb (dry weight Medium Organic Range 10 -
basis) 15%
Wettability min <5
Dispensability in water 1 or 2 (AS4419) Category
Large particles in the largest dimension
< 2 mm % w/w 30–70
2–10 mm % w/w 10 –20
10–20 mm % w/w 5–10
20–50 mm % w/w <5
> 50 mm % w/w 0
Chemical Properties
Units Target range
C2. Chemical properties
pH in water (1:5) Standard range pH units 5.4–6.8
Electrical Conductivity (1:1.5) dS/m < 2.2
Chloride mg/L ≤ 200
Ammonium-N (NH4) mg/L ≤ 100
Ammonium-N + nitrate-N (NH4 + NO3) mg/L ≥ 50
Nitrogen draw-down index (NDI) - ≥ 0.7
Toxicity index mm ≥ 70
Phosphorus – P standard range mg/L 8–40
Low phosphorus – P (P-sensitive plants) mg/L <3
Potassium (K) mg/L 50–250
Sulphate (SO4) mg/L ≥ 40
Calcium (Ca) mg/L ≥ 80
Magnesium (Mg) mg/L ≥ 15
Ca:Mg ratio – 1.5–10
K:Mg ratio – 1–7
Sodium (Na) mg/L ≤ 130
Iron (Fe) mg/L ≥ 35
Cooper (Cu) mg/L 0.4 - 15
Zinc (Zn) mg/L 0.3 - 10
Manganese (Mn) mg/L 1 - 15
Boron (B) mg/L 0.02 – 0.65
URBIS
URB -P0003847-001-SP PAGE 16
Page 21
On Slab Soil Media B - Gardens Lower Horizon
Quality – Soil must be free from any ‘unwanted materials’
Physical Properties
Units Target range
Property
Texture, preferred range n/a Gravelly loamy sand to organic
sandy loam
Air-filled porosity (AFP) % ≥ 10
Chloride % ≥ 40
Water holding capacity % ≥ 30
Permeability (@ 32 drops by McIntyre mm/h > 40
Jakobsen)
Saturated Density kg/L < 1.2
(OM) Organic matter content % dwb (dry weight Low Organic Range 3 – 5%
basis)
Wettability min <5
Dispensability in water 1 or 2 (AS4419) Category
Large particles in the largest dimension
< 2 mm % w/w 30–70
2–10 mm % w/w 10 –20
10–20 mm % w/w 5–10
20–50 mm % w/w <5
> 50 mm % w/w 0
Chemical Properties
Units Target range
C2. Chemical properties
pH in water (1:5) Standard range pH units 5.4–6.8
Electrical Conductivity (1:1.5) dS/m < 2.2
Chloride mg/L ≤ 200
Ammonium-N (NH4) mg/L ≤ 100
Ammonium-N + nitrate-N (NH4 + NO3) mg/L ≥ 50
Nitrogen draw-down index (NDI) - ≥ 0.7
Toxicity index mm ≥ 70
Phosphorus – P standard range mg/L 8–40
Low phosphorus – P (P-sensitive plants) mg/L <3
Potassium (K) mg/L 50–250
Sulphate (SO4) mg/L ≥ 40
Calcium (Ca) mg/L ≥ 80
Magnesium (Mg) mg/L ≥ 15
Ca:Mg ratio – 1.5–10
K:Mg ratio – 1–7
Sodium (Na) mg/L ≤ 130
Iron (Fe) mg/L ≥ 35
Cooper (Cu) mg/L 0.4 - 15
Zinc (Zn) mg/L 0.3 - 10
Manganese (Mn) mg/L 1 - 15
Boron (B) mg/L 0.02 – 0.65
URBIS
URB -P0003847-001-SP PAGE 17
Page 22
7. GARDENS 7.1. GENERAL SPECIFICATION Samples Supply soil sample testing reports as per soil section 18.1 in the frequency specified. Supply 1 litre bag of each different soil type. Testing to include specific ingredient percentages, as specified in AS 4419-2003: "Soils for landscaping and garden use" Table 1 on page 8 and "Documentation" on page 11. Supply 1 litre bag of each different mulch type to the Landscape Architect for approval prior to ordering and placement. Garden Soil specification All soil types are specified in the section 18.2 in this specification. All garden soil is to be consolidated yet not compacted. All soil is to be installed to heights which allow for settlement, so that at off-maintenance all surface levels are to those detailed in the documents. Additional volume allowances to be made to ensure this requirement is met. All garden soil is to be free of weed seeds and is to be non-toxic to living organisms. On-structure planters are to be free from any debris/rubble immediately prior to drainage and soil placement. Evenly grade between reduced levels i.e. (spot levels). URBIS URB -P0003847-001-SP PAGE 18
Page 23
7.2. GARDEN PROFILES GA01: Garden Bed Profile – On Grade Mulch –100mm depth, ‘Medium’ grade, aged / composted hoop pine bark fines or aged / composted "Forest Blend" (100 x 20mm max. particle size) Soil - 600mm depth ‘On Grade soil media - Gardens’ Refer to Section – Soils, for test results criteria Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum two weeks prior to lawn installation). Rip to 250mm depth. Where clay conditions are found, incorporate gypsum or clay breaker at the rate of 100g/m2 Notes: As per Noosa Shire Council requirements URBIS URB -P0003847-001-SP PAGE 19
Page 24
8. TURF 8.1. GENERAL SPECIFICATIONS Samples Supply soil testing reports as per Soil section 18.1 in the frequency specified. Garden Soil specification All soil types are specified in the soil specification section 18.2 in this specification. All garden soil is to be consolidated yet not compacted. All soil is to be installed to heights which allow for settlement, so that at off-maintenance all surface levels are to those detailed in the documents. All garden soil is to be free of deleterious material such as sticks, tree roots, stones, weed seeds and is to be non-toxic to living organisms. On-structure planters are to be free from any debris/rubble immediately prior to drainage and soil placement. Evenly grade between reduced levels i.e. (spot levels). Inside Planter Walls Wrap the waterproofing up the inside of the planter walls and/or and building façade. Use a protection board to protect the waterproofing membrane. Lay nonwoven, needle punched filter fabric to base and up the sides of the planter walls. Secure filter fabric between wall body and internal cladding (cladding to be min 150mm depth). If rendering is use apply 150mm wide steel flashing in the same colour as rendered finish to fix filter fabric to wall. Fix flashing through neoprene washer and seal flashing with flexible sealant on the top. Turf pattern / joints Lay a perimeter strip and then lay infill sods with staggered tightly butted joints. Dress joints and edges with soil (the same soil as used under turf) as required to prevent the turf drying and to provide a smooth transition to adjacent levels. Watering Water twice daily for the first week after laying to ensure rapid root establishment. Top Dressing Spread 10mm depth of medium washed river sand approximately 6 - 8 weeks after laying turf. Quality All turf must be AusGAP certified turf. URBIS URB -P0003847-001-SP PAGE 20
Page 25
8.2. TURF PROFILES TU01: Turf Profile – Turf on Grade Turf Type- Sir Walter Buffalo DNA certified Roll type - 600mm x 1.7m rolls (recommended for minimal wastage) Soil - 300mm depth ‘On grade soil media -Turf’ Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum two weeks prior to lawn installation). Rip to 150mm depth. Where clay conditions are found, incorporate gypsum or clay breaker at the rate of 100g/m2 Installation - To finish flush with adjacent surface levels. Top-dress with 10mm layer of clean washed river sand to achieve uniform surface if uneven. Top-dressing only to be undertaken in growing seasons (September to March) Notes: As per Noosa Shire Council requirements URBIS URB -P0003847-001-SP PAGE 21
Page 26
9. PLANTING 9.1. GENERAL SPECIFICATIONS Quality All plants 45L and over are to conform to NATSPEC's ‘Specifying Trees - a guide to assessment of tree quality’, Second Edition 2003 by Ross Clark. The Contractor is to supply the Landscape Architect with a written compliance certificate from a qualified Arborist. All plants are to be vigorous and appropriately acclimatised with a rootball that is full but not restrained. The root ball and canopy of all plants are to be balanced and the stem / trunk sufficiently developed so that the plants stay upright without staking and/or guying. The Contractor must inspect plants / transplants immediately after being unloaded to check quantity, quality, vigour, health, crown balance (+/ - 20% from stem axis) and symmetry, crown density, pests (< 10% of foliage), growth uniformity (max. internode <1.2 x shortest internode), included bark, sun scald, root division / direction (>90% down and / or outwards) and occupancy (> 90% rootball intact when removed from container) and rootball soil volume. Sampling Partial destructive sampling as outlined in NATSPEC's "Specifying Trees - a guide to assessment of tree quality" is likely to be carried out on some trees and plants. Trees and plants that fail may cause entire batches of trees and plants to be rejected. Plant Substitutions Any potential species substitutions or changes to nominated container or canopy sizes are to be noted in the tender as potential alternatives. Specified tree species and size to be provided as the submitted tender. Palm Heights Palm heights are measured from the rootball surface to the base of the frond shaft for smooth trunk palms such as Bangalow, Alexander and Royal Palms. Heights are measured to the base of the lowest fronds (after any required frond pruning / removal) for rough trunk palms such as Canary Island Date Palms, Livistonas and Washingtonias. Palm heights are never measured to the tip of the fronds. Installation Plants are to be installed in the locations shown on the planting plan. The tops of root balls of plants 45L and over are to be level with or up to 50mm higher than the surrounding soil level. Create watering "saucers" around all plants from containers larger than 5 litres (ie 200mm diameter). Do not pile up mulch against the base of the plant stem/trunk. URBIS URB -P0003847-001-SP PAGE 22
Page 27
9.2. PLANT INSTALLATION Plant Installation: 200L – On Grade Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the rootball. Rip the sides of the hole prior to planting. Watering dish - Form a 100mm high, 1400mm diameter mounded soil watering dish around the tree. Infill the watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period. Staking - Drive stakes into the ground, to approximately one third of their length, avoiding damage to roots. Install 3 times 50mm x 50mm x 2400mm stakes. Provide ties fixed securely to the stakes, one tie at half the height of the main stem. Others as necessary to stabilise the plant. Installation – Install as per manufacturers details. Re-tension after planting to provide a slightly loose fit, allowing for main trunk and canopy movement, which will provide wind support and promote root and stem growth. Notes: As per Noosa Shire Council requirements Plant Installation: 100L – On Grade Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 4 times the diameter of the rootball. Rip the sides of the hole prior to planting without disturbing the interfacing road sub-base. Watering dish - Form a 100mm high, 1000 mm diameter mounded soil watering dish around the tree. Infill the water dish with mulch. Staking - Drive stakes into the ground, to approximately one third of their length, avoiding damage to roots. Install 3 times 50mm x 50mm x 2400mm stakes. Provide ties fixed securely to the stakes, one tie at half the height of the main stem. Others as necessary to stabilise the plant. Installation – Install as per manufacturers details. Re-tension after planting to provide a slightly loose fit, allowing for main trunk and canopy movement, which will provide wind support and promote root and stem growth. Notes: As per Noosa Shire Council requirements URBIS URB -P0003847-001-SP PAGE 23
Page 28
10. INSPECTIONS
The Contractor must request the Landscape Architect to attend inspections at the required inspections noted
in this document and as advised by the Landscape Architect. An Inspection schedule shall be developed in
conjunction with the Superintendent.
The Superintendent shall undertake inspections of construction work carried out by the Contractor
throughout the period of the Contract. Any delays or extensions to the program or maintenance period, and
associated costs arising from lack of notification to Landscape Architect by the Superintendent, are to be
borne by the Superintendent and Contractor. The Contractor is to provide at least 2 weeks notice to the
Superintendent prior to any inspection required.
Work is not to proceed without approval from the Landscape Architect. Failure to gain approvals may result
in rectification of substantial amounts of work at the Contractor’s expense.
The Landscape Architect may inspect the works without notice at any time.
Pre Start Meeting
The landscape pre-start meeting must be conducted prior to work commencing on site, giving at least 5
business days’ notice.
The pre-start meeting must be attended by the:
• Superintendent
• Superintended
• Landscape Contractor;
• Landscape Architect;
• Council and / or relevant stakeholder representative
• All other relevant parties.
Structural Inspections during Construction
A Structural Engineer engaged by the contractor shall undertake inspections of structural construction work
carried out by the Contractor throughout the period of the Contract. The Contractor is to provide at least 48
hours-notice to the Superintendent prior to any inspection that the Structural Engineer will be on-site with all
reporting (Structural Certifications) due within 48 hours after the inspection.
Practical Completion Inspection
At Practical Completion the Contractor, the Landscape Architect, the Superintendent and the Superintendent
shall carry out a joint Inspection to ensure all landscape works have reached practical completion.
Items identified requiring attention, during the inspection are to be addressed immediately or as agreed.
The practical completion marks the start of the 52 weeks Establishment maintenance and Defects Liability
period.
Prior to the Practical Completion Inspection, the Contractor must provide the certificates below to the
Landscape Architect and Superintendent:
• Certification that all landscaping works have been completed in accordance with the approvals
• Soil Scientist certifications
• Pavements slip resistance certifications.
• Access certification that works meet all standard requirements.
• Wall, furniture and surface certification of anti-graffiti treatment.
• Maintenance manuals, parts and manufacture’s guarantees for all structures, furniture, pavement, seals,
fixtures or other used products.
URBIS
URB -P0003847-001-SP PAGE 24
Page 29
End of Establishment Maintenance Inspection
Four months prior to the agreed end of establishment period the Contractor, the Landscape Architect and the
Superintendent shall carry out a joint Inspection to ensure all landscape works are maintained as agreed.
Items identified requiring attention, during the inspection are to be addressed immediately or as agreed.
Quality Control Inspection
Two weeks prior to the agreed end of establishment period the Contractor and the Landscape Architect shall
carry out an Inspection to ensure all landscape works are ready for the hand-over.
Items identified requiring attention, during the inspection are to be addressed immediately.
Handover
At the end of establishment period the Contractor, the Landscape Architect and the Superintendent shall
carry out a joint Inspection to ensure all landscape works are maintained and cleaned to the client’s
expectation.
Prior to the Handover the Contractor must provide the certificates below to the Superintendent:
• Arborist certification that all trees and palms in public land have been inspected and rectification works
for public safety and longevity of the tree/s have been completed.
• Prove of completion of all maintenance works which were required within the 52 weeks period by the
manufacturers recommendation.
URBIS
URB -P0003847-001-SP PAGE 25
Page 30
10.1. INSPECTION SCHEDULE
(REFER TO URBIS FEE PROPOSAL TO CONFIRM THE NUMBER OF SITE INSPECTIONS ALLOWED
FOR. SPECIFY BELOW)
Inspections
1 Prestart Meeting (1x inspection)
2 Hold point inspections as per Hold point schedule (Xx inspections)
3 Construction period inspections (Xx inspections)
4 Practical Completion Inspection (1x inspection)
5 Defects Completion Inspection (1x inspection)
6 Council On-Maintenance Inspection (1x inspection)
7 End of Establishment Maintenance Inspection (1x inspection)
8 Client / Council Off Maintenance Handover Inspection (1x inspection)
No sub-staging, separable portions or trade packages have been allowed for during documentation or
construction. It is assumed that the landscape set is suitable for trade packages purposes.
No allowance has been made for changes to the plant schedules or drawings, nor for updated client / approval
authority approvals or contractor liaison arising from lack of early plant procurement by the contractor, leading
to unavailability of specified trees or plants. This work will be done on hourly rate basis, payable by the Head
Contractor.
No allowance has been made for us to make modifications to our CAD (2D) or Revit (3D) documentation during
construction based on site changes, or updates from other consultants for example. It is assumed that any
changes will be captured as part of the “As-constructed” scope.
No allowance has been made to attend regular site co-ordination meetings. If these meetings align with the
above listed site inspections, the Landscape Architect will assess if attendance is required.
If additional inspections to those listed above are required due to incorrectly installed works, or failure
to order materials and plant stock, or to maintain the completed works sufficiently to achieve
handover, the costs for additional Landscape Architects inspections are to the responsibility of the
Contractor / Head Contractor.
URBIS
URB -P0003847-001-SP PAGE 26
Page 31
11. ESTABLISHMENT MAINTENANCE 11.1. GENERAL The work contained in this section comprises the establishment maintenance of all works executed under this contract. The Establishment Maintenance period begins at the issue of the Certificate of Practical Completion. Maintain the contract areas for a period of 52 weeks. Maintenance of the works prior to the date of Practical Completion shall not be included in this period. If the maintenance period is extended, it is the Clients responsibility to meet the capital and maintenance costs of elements that require refurbishment. Promptly make good any defects or damage resulting from defective construction, materials or workmanship to the complete satisfaction of the Superintendent during this period. The cost of replacement is the responsibility of the Contractor. In the event of any failure to rectify defective work the Superintendent may instruct that the work be carried out by another company, the cost of which will be charged to the Contractor. Stolen items and plants are not included into the establishment maintenance. It is the Contractors responsibility to source and plant or place them in coordination with the facility management. It is the Contractors responsibility to highlight areas or items which may require additional maintenance management to the facility management. These include emptying of rubbish bins, general regular cleaning etc. Prior to the Handover allow for a clean up to presentation standard of the entire landscape works area. Tasks which are required on a 12-month interval are to be complete prior to the end of maintenance compliance inspection. This includes all timber surfaces to be recoated with protective treatment as specified. 11.2. TREE TRANSPLANTING / PROTECTION MAINTENANCE The start date for transplanted trees and palms begins the day the tree(s) or palm(s) are placed in their proposed final location and backfilled. The period from the transplanting of all plants until the start of certified On-Maintenance period is to be considered in addition to the required full maintenance period. The required maintenance period is not completed until certified Off-Maintenance is granted. Carry out all maintenance activities on the transplant(s) necessary to ensure they become fully re- established within the Establishment Maintenance period and are returned to a healthy and vigorous state with a min. 90% of the original foliage density (i.e. excluding epicormic growth). Watering The tree(s) may require large volumes of water to be applied by hand at the time of planting and repeated twice weekly during the initial period (min. 6 weeks). Test, rectify and adjust the irrigation system or watering regime as necessary to maintain optimum soil moisture levels in and around the root plate(s). The root plate (and not the surrounding backfill soil) is the tree's main water source for many months after transplanting. Ensure it is kept moist (but not over watered) at all times. Wrapping For thin or smooth bark trees, if more than 40% of the foliage is shed due to post-transplant stress then the trunk and branches (greater than 50mm diameter) are to be wrapped with light coloured biodegradable paper or hessian to reduce bark scalding. Wrap from the bottom of the trunk upwards so the layers overlap and thus shed water. URBIS URB -P0003847-001-SP PAGE 27
Page 32
Soil testing Provide detailed chemical and physical test results of the root plate of each tree and backfill soil 2 weeks prior to the completion of the Establishment Maintenance period. Rectify any identified chemical or physical soil imbalances as per the testing laboratory recommendations prior to the completion of the Establishment Maintenance period. 11.3. ESTABLISHMENT MAINTENANCE LOG Keep a detailed maintenance log of all activities undertaken including watering regimes and fertiliser applications. This log is to be given to the Landscape Architect and Facility Manager at the completion of the Establishment Maintenance period. URBIS URB -P0003847-001-SP PAGE 28
Page 33
11.4. ESTABLISHMENT MAINTENANCE TASKS
Task Standard
Turfed areas • Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• Fertilize at 3-month intervals
• Aerate at 12-month intervals
• Replace bare patches over 1m2 immediately
• Trim edges to maintain straight lines
• Check regularly for pest infection and apply pest treatment
• Weed regularly to keep weed infestation to a minimum
• Mow regularly as required
• Apply 10mm deep clean washed river sand as a top dressing at 12-month intervals
Artificial grass / synthetic • Reapply sand at 12-month intervals
surfaces • Monthly check the grass and brush piles accordingly in the first 4 month
• Inspect on 3-months intervals and brush piles accordingly
Garden beds • Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• Replace failed plans immediately
• Weed regularly (weekly)
• Top up organic mulch at 6-month intervals
• Top up gravel mulch as required
• Mulched surfaces are to be kept clean and tidy and free of any deleterious material
and foreign matter
• Check plants weekly of pest and disease infestation
• Spray for pests and disease infestations when the pest and fungal attack has been
identified
• Apply a balance of man-made and natural slow release fertiliser to all planting
areas in a 3-month interval.
• Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
adapt fertiliser regime to suit. Treat as required
• Aerate at 12-month intervals
• Clean all leaves of plants which are undercover at a monthly interval
Trees and shrubs • Trees may require up to 50L of water to be applied by hand at the time of planting
and repeated twice weekly during the initial period (minimum 6 weeks). Test, rectify
and adjust the watering regimes or water manually regularly as necessary to
maintain optimum soil moisture levels in all areas
• Replace failed plants immediately
• Adjust and/or replace stakes and ties monthly. Remove staking and visible guying
after 11 months.
• Prune shrubs and trees in accordance to the maintenance manual. In general,
shrubs and trees will be tip pruned to ensure a strong, sound form and dense,
bushy appearance. Remove of overhanging branches or foliage that prevents
proper function of a space e.g. pathways, seating areas, sightlines. Remove
branches which are at risk of storm damage
• All tree pruning to be carried out by a qualified arborist
URBIS
URB -P0003847-001-SP PAGE 29
Page 34
• Apply root hormone periodically once new roots have begun to grow (fertiliser is
unlikely to be effective until new roots are absorbing water).
• Clean all leaves of trees and shrubs which are undercover at a monthly interval
• Weed regularly (weekly)
• Top up organic mulch at 6-month intervals
• Top up gravel mulch as required
• Mulched surfaces are to be kept clean and tidy and free of any deleterious material
and foreign matter
• Check plants weekly of pest and disease infestation
• Spray for pests and disease infestations when the pest and fungal attack has been
identified
• Apply a balance of man-made and natural slow release fertiliser to all planting
areas in a 3-month interval.
• Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
adapt fertiliser regime to suit. Treat as required
• Aerate at 12-month intervals
Green walls • Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• Replace failed plans immediately
• Weed regularly (weekly)
• Check plants weekly of pest and disease infestation
• Spray for pests and disease infestations when the pest and fungal attack has been
identified
• Apply fertilizer as per manufactures manual
• Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
adapt fertiliser regime to suit. Treat as required
Trellis System • Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• Bind up climbing plants
• Replace failed plans immediately
• Weed regularly (weekly)
• Check plants weekly of pest and disease infestation
• Spray for pests and disease infestations when the pest and fungal attack has been
identified
• Apply fertilizer as per manufactures manual
• Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
adapt fertiliser regime to suit. Treat as required
Irrigation • Adjust irrigation control as required by the respective season
• Check irrigation system of possible leaks and sound operation of automatic system
monthly
• Flush irrigation system at 12-month intervals.
• Maintain irrigation component as required by the manufacturers manual
External furniture and • Maintained in accordance to manufacturer’s instructions
structure • Apply sealer in accordance to manufacturer’s instructions
Timber Works • Inspect monthly
URBIS
URB -P0003847-001-SP PAGE 30
Page 35
• Removal of splinters, the replacement of cracked, cupped or degraded boards as
identified at inspection
• Apply a light sand and preservative coat in accordance with manufacturers
specification at 6-month intervals
• Retightening and/or replacement of fixings at 12-month intervals
Artificial Timber Works • Inspect monthly
• Sweep deck and clean gaps between the boards regularly
• Clean deck in the intervals and with a cleaning product recommended by the
manufacturer
• Do not use high pressure cleaners
• Treat scuffs and scratches as per manufacturers recommendation
Tree / Palm Transplanting • Monitoring / adjusting the irrigation system or watering regime in liaison with the
Landscape Contractor, water if required
• Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• Spray for pests and disease infestations when the pest and fungal attack has been
identified
• Apply fertilize once root growth & water uptake has begun
• Wrap trunk/branch to prevent sun scald if necessary due to leaf loss >40%
• Prune dieback
• Top up soil and mulch
• For thin or smooth bark trees, if more than 40% of the foliage is shed due to post-
transplant stress then the trunk and branches (greater than 50mm diameter) are to
be wrapped with light coloured biodegradable paper or hessian to reduce bark
scalding. Wrap from the bottom of the trunk upwards so the layers overlap and thus
shed water.
• Organise soil testing
• Adjust and/or replace stakes and ties monthly. Remove staking and visible guying
after 11 months.
• Weed regularly (weekly)
Swale / Bio Pods • Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• The uses of synthetic, granular blended fertilisers on the site are not permitted.
Slow release organic tree tablets shall be used at establishment.
• Spray for pests and disease infestations when the pest and fungal attack has been
identified
• Replace failed plans immediately
• Weed regularly (weekly)
• Top up gravel mulch as required
• Sweep and/or remove from bio-pod area any fallen branches and leaf (including
any autumn leaf drop), grass clippings and other garden debris.
• Maintenance of the bio-pods includes the detention area, 1:3 batters, kick edges,
bio-pod grate covers, and gutter in front of the bio-pod.
• Subsoil drains are to be cleaned out and accumulated sediment manually removed
from the surface area of the bio retention device at Off Maintenance and as
required during the maintenance period.
URBIS
URB -P0003847-001-SP PAGE 31
Page 36
APPENDIX A URBIS URB -P0003847-001-SP PAGE 32 [OCR of page images] uRBIS | APPENDIX A URBIS ; . » URB -P0003847-001-SP
Page 37
2000 min width back of kerb/backing strip
500 500
Possible service Possible service
corridor corridor CAUTION
Verify location of services
prior to commencement of
work
Tree species selection to consider
mature height, trunk diameter
(frangibility), and spread on
Refer to G—-010 for street lighting and road safety
staking requirements. : :
Do not penetrate rootball. (sight lines). Refer to CAUTION.
\ Refer to planting schedule
Finished level of for shrubs and groundcover
mulch to be 25 L species 600 max height.
below top of < p< Gal
: - S
backing strip <= 300 min deep Concrete reinforced backing
8 imported topsoil strip if specified refer to
. Ss as specified relevant Council for details.
300 min deep Ns 100 mulch
300 imported topsojfe"4” © as specified B6 kerb type refer to note 4
nom as specified rZo€s > J
*& A : “ y 7-7
« L “
as
af LYLLLIGLLLLE. VLILEL ILLS —
KEKXQRAKS NRK
Existing Pavement KE KIARA SESSA Re
y
Z, VAY PY) XY) YP PRP Y
Compacted subgrade IQR y ERKRAARAN KX
Subsoil drainage as specified A RLQOEOQROEK LLL III
N
Existing subgrade to be cultivated 150 deep
Planting hole to be 2 x the width and
1.5 x the depth of rootball. Break up
sides and base of hole with crow bar
to aid root and moisture penetration.
Root barrier to surround tree as
specified refer to GS—010 and
manufacturers specifications
Fertilise as specified. Do not
place fertiliser at base of
Tree root ball to be placed on plant or in contact with the NOTES:
150 deep lightly compacted root system
premium garden soil. Top of 1. Trees, groundcover and shrub planting as specified.
root ball to be 20 below finished 2. Mulch dished at tree base to prevent rot.
surface level. 3. Height of clear tree trunk is dependant upon road safety
TYPICAL MEDIAN PLANTING SECTION sight distance requirements. Refer to Austroads "Guide to
TREES, SHRUBS AND GROUNDCOVERS Road Design Part 3 — Geometric Design”
4. Refer to RS—080 for kerb type
. . . wen . 5. All dimensions are in millimetres unless shown otherwise
These drawings have been developed in consultation between the participating Councils.
BEFORE USE, the user shall confirm that the drawing has been adopted by the appropriate Council.
E Review
oa a a INSTITUTE. OF PUBLIC WORKS ENGINEERING AUSTRALASIA STREET TREE PLANTING DETAILS GS-012
A ORIGINAL ISSUE —— STANDARD DRAWINGS
Page 38
URBIS URB -P0003847-001-SP PAGE 33 [OCR of page images] uRBIS | URBIS.COM.AU