Original source · versioned page text
Landscape Specification Report URB-P0003847-001-SP (A)
HOLD POINTS CHKD DATE / NOTES
Soil Testing
X Soil testing of proposed imported soils supplied to Landscape Architect for
approval. Early testing and approval critical to avoid construction delays
X Soil delivery dockets showing Soil Supplier and batch information. Copies
of dockets to be supplied to Landscape Architect for approval and record.
Set out
X Set out of hardscape areas. Photographs supplied to Landscape Architect
for approval or Landscape Architect site inspection
X Set out for walls and edges
Grading
X On-Grade subsoil drainage installed and tested prior to backfilling.
Photographs and written confirmation supplied to Landscape Architect
Planting
X Photographs of all smaller stock species to be to Landscape Architect for
approval
X Written confirmation from nurseries that any plant stock located within
shade houses have been relocated to allow for full sun hardening 4 weeks
prior to delivery date
X Cultivated subgrade to all turf and planting areas to specified depths. Site
inspection by Landscape Architect or photographs of all areas of cultivation
supplied for approval. Critical that this is recorded and approved.
X Site fencing installed to exclude all site traffic from cultivated areas.
Photographs provided to Landscape Architect for approval. Ensure no
cultivated areas are recompacted by site traffic. This is critical to ensure
long term plant growth success.
X Setout and installation of tree trenches. Photographs supplied to
Landscape Architect for approval
X Plants / transplant when delivered to site, prior to being unloaded from the
truck Contractor to check for transport related damage, plant form and
suitability for installation.
URBIS
URB -P0003847-001-SP PAGE 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.