Amended - Decision Notice - Negotiated - MCU22 0145 & OPW22 0212 [As Published] · MCU22/0145
Easements
36. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
37. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
38. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
39. All earthworks and associated retaining structures/batters/anchors, both above and below
ground level, both temporary and permanent, must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
40. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
41. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Landscaping Works
42. The development site must be landscaped. The works must be undertaken in accordance
with the PSP 2 - Landscape and the Noosa Plan for that specific area and must include in
particular:
a. the works shown on the Approved Plans
b. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
43. All landscape works must be maintained generally in accordance with the approved design
for the life of the development.
Page 6 of 16
Document Set ID: 22808839
Version: 2, Version Date: 12/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended - Decision Notice - Negotiated - MCU22 0145 & OPW22 0212 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 198 KB (small file)
- File type
No other editions are linked here.