Council archive · source document
Proposal plans_230216 · MCU16/0018
Attached to the e-mail MCU16/0018 Development Application - 9 Duke Street Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
3780
6280
2000
£ EXISTING CONTOURS
$
.® PROPOSED LEVELS
a
ve EXISTING TREES
© PROPOSED TREES
6620 no: amendment: date:
consultants: —
EXISTING TIMER structural engineer:
FENCE SCG CONSULTING ENGINEERS
hydraulic engineer:
oa Cee
CIR
4 Fa SSeZ AO %
45.43 surveyor:
Power pote LAU SURVEYS
cacy
Se
6000
FEL46.40
co
Or .
P. P.
$348
13:
P
oF
g
-_ «4 ; geotechnical:
‘GAZEEBQ | IF SCG CONSULTING ENGINEERS
electrical engineer:
landscape architect:
m7)
*
Construction to. with all relevont SAA
code We BOA Tea act 1975, a9 amended.
313°
6090
@
Ct
[Hite |]...
gd PY Se &
Verify’ all dimensions on site prior fo
commencement of any work,
Cope oe ee or ee can.
snd drawings reenains
the oF GES ces At CTS,
These ‘shall not be used for constrection
unt noted issue A ("For Construction’) with
‘subsequent revisions 6, 0, etc,
Concretd Footpath
Back of Kerb
Edge of Bitumen
STREET
ys
os
project:
a
DRIVE
PROPOSED DUPLEX
Nh
K E
2000
°\
EXISTING TI
FENCE
Snr WIDE}
~~
byw]
(am
CROSSOVER TO
LAL
WANGA,
COUNEth STANDARDS |—ocation
é 9 DUKE ST
EXISTING TIMBER 3 SUNSHINE BEACH
FENCE LOT 205 RP48113
6290 | client:
SITE AREA
680m? [
SITE COVER 272m? (40%) bet sce
GFA
LEVEL 4
LEVEL 2
LEVEL 3
L.0.8.
1 JAVAKA PTY LTD
‘BOBO No 007158
305m’ (40%) ABN 89 852 712 006
63m? PO BOX 1272 NOOSA HEADS QLD 4567
MOB 0418 874 149
200m?
42m? EMAlL [email protected]
354m? detail:
SITE PLAN
PROPOSED CONDITIONS
L.O.S.
dwg no: issue: p
1511 SK02 -LOS LK
goole date drown
1:200 @ A3_| FEB 2016 GWG
checked approved AB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposal plans_230216.PDFRelated documentApplication case desk ↗
About this file
- File size
- 876 KB (small file)
- File type
No other editions are linked here.