         General Committee Agenda 16 May 2022
         Attachment 1 to Item 7




OPW22/0029 – NOOSA RIVER OYSTER HABITAT
    RESTORATION/ENHANCEMENT PROJECT
Assessment Manager Development Assessment
                                April 2022


                                 Marine Approval Specialists

                        Email: [email protected]

                                        ABN: 28 453 148 408

                                           ACN: 658 085 913
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 79 sections

Section 2

Contents
1.0         Development Details................................................................................................................... 1
2.0         Overview ..................................................................................................................................... 1
3.0         Methodology & Assessment Framework .................................................................................... 1
4.0         Assessment Summary ................................................................................................................. 1
     4.1 Noosaville Local Plan Code ........................................................................................................... 1
     4.2 Zone Codes and Planning Scheme Policies ................................................................................... 2
     4.3 Waterways Works Code ................................................................................................................ 2
     4.4 Code for Assessable Development that is Prescribed Tidal Works .............................................. 3
     4.5 Applicant response to QX and winter mortality disease risk ........................................................ 3
        4.5.1 Literature review .................................................................................................................... 3
        4.5.2 Adequacy of controls ............................................................................................................. 4
5.0        Recommendations ...................................................................................................................... 5
6.0        Appendices .................................................................................................................................. 6
     Appendix 1 – Assessment Manager Approval Conditions .................................................................. 6
     Appendix 2 – Code Assessments......................................................................................................... 7
        1.0 Noosaville Local Plan Code ....................................................................................................... 7
        2.0 Waterways works Code .......................................................................................................... 11
        3.0 Code for assessable development that is prescribed tidal works .......................................... 29




Document History & Status

 Revision               Date Issued           Approved By             Date Approved                 Revision Type           Issued To

 A                      26/04/2022            J. Richard              26/04/2022                    Draft                   Kerri Coyle & Mark Lewis




 File name:                    MAS_NC_Noosa River Oyster Restoration Project_Development Assessment
 Author:                       Tonia Richard
 Client:                       Noosa Council
 Document Title:               OPW22/0029 Noosa River Oyster Habitat Restoration/Enhancement Project Assessment
                               Manager Development Assessment
 Document Version:             Draft

Section 3

1.0 Development Details
 Applicant                                            The Nature Conservancy Limited
 Application number                                   OPW22/0029
 Assessment type                                      Code
 Details                                              Operational Works – Prescribed Tidal Works
 Assessment Manager                                   Noosa Council
 Referral Agencies                                    State Assessment and Referral Agency (SARA)



2.0 Overview
The Noosa Oyster Ecosystem Restoration/Enhancement Project (“the Project”) is a partnership
between The Nature Conservancy (TNC) and Noosa Council (NC), which aims to deliver oyster
ecosystem restoration in the Noosa River.
As per the Development Assessment Rules, NC is the Assessment Manager for the proposed works,
which form Operational Works – Prescribed Tidal Works.
NC commissioned Marine Approval Specialists (MAS) to provide an assessment of the proposed
works against the Noosa Planning Scheme (Noosa Plan 2020) and the Coastal Protection and
Management Regulation 2017 (Schedule 3 – Prescribed Tidal Works Code).



3.0 Methodology & Assessment Framework
The following methodology was used to assess the Project against the Noosa Plan 2020 and the
Coastal Protection and Management Regulation 2017:
    1. Review of application documents and supporting materials
    2. Assessment of the application against the Noosa Plan 2020, including
           a. Noosaville Local Plan Code
           b. Applicable Zone Code (if relevant), focusing on adjacent land uses given that the
               works are primarily within waterbodies
           c. Waterways Works Code
           d. Relevant planning scheme policies
    3. Assessment of the Project against the relevant provisions of the Coastal Protection and
       Management Regulation 2017, including specifically Schedule 3 Prescribed Tidal Works Code
    4. Technical review of application materials including marine studies, management plans and
       other supporting technical information as it relates to fisheries values


4.0 Assessment Summary
The following section provides a summary of the assessment completed against each applicable
code.

4.1 Noosaville Local Plan Code
The Project requires assessment against the Noosaville local plan code, as per Part 5, Table 5.8.4 of
the Noosa Plan 2020.

Given the nature of the Project – prescribed tidal works on the seabed of the Noosa River for the
restoration of oyster reef habitats, a large portion of the Noosaville local plan code is not applicable.
Relevant provisions requiring assessment against are:

                                                                                                        1

Section 4

    -   Noosa River; and
    -   Environment, natural resources and recreation

Given that the Project does not include commercial development, all Performance Outcomes (PO’s)
relating to Noosa River are met.

Both PO’s (PO31 & PO32) relating to environment, natural resources and recreation are relevant to
the Project and require consideration. The Project demonstrates compliance with PO31 and PO32
by:

    •   Demonstrably avoiding or managing significant adverse effects on relevant natural heritage
        values.
    •   Enhancing marine habitat complexity and connectivity by restoring oyster reefs while
        limiting impacts on existing recreational uses.

The Project is considered to meet the purpose and overall outcomes of the Noosaville local plan
code, therefore has been assessed as compliant with this code.



4.2 Zone Codes and Planning Scheme Policies
As the Project is wholly located within a watercourse, there were no Zone codes relevant to the
Project.

Schedule 6, Planning Scheme Policy 1 PSP1 – Preparing a well-made application is generally relevant
to the Project but does not call up specific requirements for a development of this nature. Given the
breadth of technical studies and supporting information which underpin the application, the
requirements of PSP1 should be considered satisfied.


4.3 Waterways Works Code
The Project requires assessment against the Waterways works code, as per Part 5, Table 5.8.4 of the
Noosa Plan 2020.

The Project is not located within the Noosa Waters Estate waterways, therefore all PO’s relating to
Noosa Waters Estate waterways are not applicable. Furthermore, given that Project does not
include landings, boat ramps, wharves or pontoons all PO’s relating to these items are not relevant
to the application.

The key PO’s relevant to the Project and requiring assessment against are PO7 (relating to the siting
provision) and PO9 (relating to character, amenity and access provision). The Project demonstrates
compliance with PO7 and PO9 by:

    •   Not proposing prescribed tidal works on the southern bank of the Noosa River and
        tributaries between the Noosa Heads Lions Park and Weyba Bridge. All works are located on
        the seabed and not the bank of the Noosa River and tributaries.
    •   Configuring the proposed load-out site at Noosaville to minimise interruption to existing
        foreshore uses, primarily by allowing sufficient space for recreational boaters and
        commercial companies to access the existing shoreline.

Section 5

The Project is considered to the meet the purpose and overall outcomes of the Waterways works
code, therefore has been assessed as compliant with this code.



4.4 Code for Assessable Development that is Prescribed Tidal Works
The State Coastal Protection and Management Regulation 2017 also applies to prescribed tidal
works in a local government tidal area. The Project therefore requires assessment against Schedule 3
Code for Assessable Development that is prescribed tidal works.

The majority of this code is relevant to the Project, therefore an assessment was completed against
the entire code. The Project demonstrates compliance with the code by:

    •   Proposing habitat restoration works that are compatible with the character and amenity of
        the Noosa River and surrounds
    •   Installing signage and navigation aids consistent with MSQ requirements
    •   Completely avoiding disturbance to intertidal vegetation (mangroves and saltmarshes) and
        minimising impacts to seabed vegetation including seagrass beds and macroalgae
    •   Buffering of mangroves, including pneumatophores by 2m and seagrass beds by 10m
    •   Providing for ongoing public access to the foreshore, including at the proposed load-out site
        at Noosaville
    •   Allowing for the safe passage of vessels at all tides through careful consideration of gaps
        between restored reef habitats
    •   Engineering rock substrates in accordance with applicable standards, assured by an RPEQ
    •   Buffering existing tidal works (e.g., jetties) by at least 30m
    •   Generally improving the stability of the seabed at the restoration sites, and monitoring
        changes to the seabed and banks to ensure potential impacts are detected and managed
    •   Using construction materials which are clearly compatible with the marine environment, and
    •   Minimisation and monitoring of seabed sediment disturbance as a result of the proposed
        works.

The Project is considered to meet the purpose of the Code for Assessable development that is
Prescribed Tidal Works, therefore has been assessed as compliant with this code.

4.5 Applicant response to QX and winter mortality disease risk
The Project applicant, The Nature Conservancy (TNC) has provided a response to an inquiry from
Shaun Walsh (Noosa Council). We understand that this was not a formal information request (IR) via
the Development Assessment process but rather a general inquiry relating to QX and winter
mortality disease risk to Sydney Rock Oysters (SROs) in the Noosa River estuary.

4.5.1 Literature review
QX disease causes mass mortalities of SROs and has severely impacted the industry in estuaries of
south-east Queensland and northern NSW since the mid-1970s. The causative agent of QX, Marteilia
sydneyi, was first identified in 1976 although the term QX has been in use since the 1960s when
mortalities were first observed in cultivated oysters in south-east Queensland when the cause was
not yet known.

QX infection in SRO’s is seasonally occurring, usually between January - April, with affected oysters
losing condition and dying through autumn and winter. While seasonal, infection dynamics are
complex, and it is not always observed each year in those estuaries where it is known to occur. M.

Section 6

sydneyi has a lifecycle which involves at least two hosts, which means QX cannot be passed directly
from one oyster to another (is not directly transmissible).

The parasite enters into the soft tissue of SRO through its gills and palps (near the oyster's mouth). If
it progresses to cause disease, the parasite divides and proliferates. It then migrates to the digestive
gland which surrounds the oyster’s stomach and intestine. There it undergoes further development
and multiplication to produce spores (sporulation), the end-stage of infection in oysters. Sporulation
damages the digestive gland of the oyster, resulting in starvation and eventual death of the oyster.

Time from infection until death can vary between several weeks to several months. Affected oysters
can be in poor condition and appear translucent or “watery”. The digestive gland can also appear to
be a light tan colour instead of the usual dark brown.

Prior to death of the oyster, the spores are released into the environment where they are taken up
by alternate host(s) required in the life cycle of QX. The identity of the alternate host(s) has not been
confirmed, but there is evidence suggesting that a polychaete worm (Nephtys australiensis) could
play a role in the development of the parasite (Adlard and Nolan, 2015).

Winter mortality is a protozoan born disease affecting the production of the SRO industry greatly.
This disease causes high oyster mortality during periods of low water temperature and high salinity.
It has the potential to severely impact the SRO industry through both stock losses and restrictions on
market access.

A species of Mikrocytos (subsequently renamed as a species of Bonamia) was historically thought to
be the cause of the disease, but a definitive link between its presence and disease outbreaks has
never been found.

Over the past few decades, breeding lines of SROs have been selected for resistance to Winter
mortality and QX disease.



4.5.2 Adequacy of controls
TNC proposes a monitoring and adaptive management framework informed by close consultation
with relevant industry experts. The management framework is considered sound. We note that the
framework relies on the careful implementation of the Noosa Oyster Ecosystem Restoration Project
- Project Restoration Plan and development of an appropriate Restoration Monitoring, Evaluation
and Reporting System. The latter has not been provided as part of the application material.

The primary mitigation measure if there are outbreaks of these diseases is the introduction of
hatchery-produced QX-resistant S. glomerata and this is acknowledged by TNC as a fundamental
response. As the causes of outbreaks of these diseases remain poorly understood, monitoring and
development of mitigation strategies in consultation with the network of experts proposed by TNC
are considered appropriate controls.

Section 7

5.0 Recommendations
The Project has been assessed as compliant with all relevant Codes of the Noosa Plan 2020 and the
Coastal Protection and Management Regulation 2017.

The application material includes a range of environmental management and monitoring
commitments, primarily documented in the Noosa Oyster Ecosystem Restoration Project - Project
Restoration Plan. These measures should be consolidated in a Construction Environmental
Management Plan (CEMP). We note that this has not been conditioned by referral agencies. We
recommend that Noosa Council includes an Assessment Manager condition to capture this
requirement.

It is therefore recommended that the Project be approved subject to the Referral Agency Conditions
provided by SARA on 7 April 2022 and the Conditions provided in Appendix 1.

Section 8

6.0 Appendices

Appendix 1 – Assessment Manager Approval Conditions

See Attachment ‘Prescribed Tidal Work Conditions’ Word doc.

To be inserted once Council reviews/accepts conditions.




                                                              6

Section 9

Appendix 2 – Code Assessments
1.0 Noosaville Local Plan Code
Relevant assessment criteria from Table 7.2.4.3 Criteria for Assessable development

 Performance outcome                        Acceptable outcome                    Applicant response                    Assessment
 Noosa River
 PO22                                       No acceptable outcome provided.       The applicant has not specifically    The Project is not commercial
 Commercial development on and                                                    addressed the Noosaville Local Plan   development therefore PO22 is
 adjacent to the Noosa River is designed                                          Code.                                 not applicable.
 to—
     (a) Provide for uses for marine
         facility purposes including
         water transport and boat hire;
     (b) Be compatible with the scenic
         values of the waterway;
     (c) Provide a high level of amenity,
         including ensuring low ambient
         noise levels;
     (d) Not increase overall scale and
         intensity of commercial
         operations;
     (e) Use materials, natural finishes
         and colours that blend with the
         surrounding natural landscape;
         and
     (f) Reflect the character and
         setting of the waterfront
         locality (such as timber and tin
         construction with a traditional
         pitched roof design).
 PO23                                       AO23.1                                The applicant has not specifically    The Project is not commercial
 Commercial development on and              No additional commercial leases are   addressed the Noosaville Local Plan   development therefore PO23 is
 adjacent to the Noosa River is not         created on or adjacent to the Noosa   Code.                                 not applicable.

Section 10

increased or expanded beyond existing      River and no additional areas are
building footprints and structures         added to the current commercial
within existing lease areas.               lease leases.

                                           AO 23.2
                                           Development does not increase the
                                           overall building footprint, gross floor
                                           area or height of buildings or
                                           structures associated with
                                           commercial jetties.

PO24                                       No acceptable outcome provided.           The applicant has not specifically    The Project is not commercial
The loading and unloading of                                                         addressed the Noosaville Local Plan   development therefore PO24 is
passengers and boat docking is                                                       Code.                                 not applicable.
confined to the commercial lease areas
of the respective commercial
operation.
PO25                                       AO25                                      The applicant has not specifically    The Project is not commercial
Parking of vehicles and boat trailers      The loading and unloading of              addressed the Noosaville Local Plan   development therefore PO25 is
and the loading and unloading of goods     passengers, goods and watercraft is       Code.                                 not applicable.
or passengers does not impede on           confined to the commercial lease
public open space in the vicinity of the   areas of the respective commercial
river.                                     operation.
PO26                                       No acceptable outcome provided.           The applicant has not specifically    The Project will not interact
The slipway accessed from Mill Street                                                addressed the Noosaville Local Plan   with the Mill Street slipway
provides essential infrastructure for                                                Code.                                 therefore PO26 is not
waterfront based marine industries                                                                                         applicable.
and is limited to this existing
commercial lease area adjoining
Chaplin Park.
PO27                                       No acceptable outcome provided.           The applicant has not specifically    The Project will not interact
                                                                                     addressed the Noosaville Local Plan   with the slipway at 238 Gympie
                                                                                     Code.

Section 11

The slipway at 238 Gympie Terrace,                                                                                    Terrace therefore PO27 is not
Noosaville serves as important                                                                                        applicable.
infrastructure for small vessels.
Environment, natural resources and recreation
PO31                                     AO31                                   The applicant has not specifically    The applicant has demonstrated
Development has no significant           Connecting Habitat Areas as            addressed the Noosaville Local Plan   compliance with PO31.
adverse effects on biodiversity, natural identified on Map SFM-4-Biodiversity   Code.                                 Given the nature of the works
vegetation, native fauna habitat,        (Strategic Framework) are protected                                          (placement of additional
landscape quality, water quality or      from fragmentation and                                                       oyster/rock substrates on the
cultural heritage values, including      encroachment by development.                                                 seabed) there is the potential
those related to—                                                                                                     for short-term impacts to water
    (a) changes to natural drainage;                                                                                  quality and movement of
    (b) disturbance to any wetland                                                                                    sediments.
         system;                                                                                                      The Project demonstrates
    (c) management of fire risk;                                                                                      appropriate mitigation and
    (d) erosion and the transport of                                                                                  management measures have
         sediments off site;                                                                                          been considered through the
    (e) unmanaged public access;                                                                                      Noosa Oyster Ecosystem
    (f) changes to fauna habitat and                                                                                  Restoration Project – Project
         behaviour.                                                                                                   Restoration Plan. In addition, as
                                                                                                                      required under condition 21 of
                                                                                                                      SARA Decision Notice, the
                                                                                                                      Inspection and Monitoring
                                                                                                                      Program will monitor any
                                                                                                                      potential impacts and provide
                                                                                                                      management measures to
                                                                                                                      remediate any adverse impacts
                                                                                                                      should they occur.
                                                                                                                      Furthermore, the works must be
                                                                                                                      undertaken in accordance with
                                                                                                                      an approved Construction
                                                                                                                      Environmental Management

Section 12

                                                                                                                      Plan (CEMP) as per Council
                                                                                                                      approval conditions.

                                                                                                                      The Connecting Habitat Areas
                                                                                                                      identified on Map SFM-
                                                                                                                      Biodiversity will not be
                                                                                                                      impacted.


PO32                                       AO32                                 The applicant has not specifically    The applicant has demonstrated
Development maintains and protects         Open space corridors identified as   addressed the Noosaville Local Plan   compliance with PO32. The
an integrated open space network           Ecological Linkages and Major        Code.                                 Project seeks to enhance items
throughout the locality to—                recreation areas on Map SFM-1-                                             listed at (c) and (d) through
    (a) provide for both passive and       Settlement and Map SFM-4-                                                  restoration of oyster reef
        active recreational pursuits;      Biodiversity (Strategic Framework)                                         habitats in Noosa River. The
    (b) provide connectivity for           are enhanced and protected from                                            Project will not impact on the
        pedestrians and cyclists;          fragmentation and encroachment by                                          open space network nor
    (c) provide habitat connectivity for   development.                                                               interact with the open space
        wildlife and fish passage;                                                                                    corridors identified on Map
    (d) protect watercourses and                                                                                      SFM-1-Settlement and Map
        drainage lines;                                                                                               SFM-4-Biodiversity.
    (e) protect vegetation on steep
        slopes; and
    (f) for a scenic backdrop for
        residential development.

Section 13

2.0 Waterways works Code
Table 9.4.9.3 Criteria for assessment

 Performance outcome                       Acceptable outcome                Applicant response                   Assessment
 Landing – prescribed tidal works outside Noosa Waters Estate
 Role and function                         No acceptable outcome provided.   The applicant has not specifically   The Project is not a landing
 PO1                                                                         addressed the Waterways works        therefore PO1 is not applicable.
 A landing—                                                                  code.
     (a) provides a high level of
         amenity with no adverse
         effects on the surrounding area
         including changes to light,
         views, air quality and noise;
     (b) is compatible with the scenic
         values of the waterway; and
     (c) does not adversely affect the
         natural landscape character
         and vegetation along the
         foreshore.
 Landings in conjunction with a            No acceptable outcome provided.   The applicant has not specifically   The Project is not a landing
 commercial use                                                              addressed the Waterways works        therefore PO2 is not applicable.
 PO2                                                                         code.
 Development—
     (a) does not detract from the
         function and viability of centres
         or nearby businesses;
     (b) does not increase the overall
         scale and intensity of any
         commercial operation;
     (c) © does not provide additional
         commercial leases on the
         Noosa River;

Section 14

     (d) ensures no net increase in site
         cover or gross floor area of
         buildings or structures;
     (e) uses materials, natural finishes
         and colours that blend with the
         surrounding natural landscape;
         and
     (f) reflects the character and
         setting of the locality (such as
         timber and tin construction
         with a traditional pitched roof
         design).
PO3                                         No acceptable outcome provided.   The applicant has not specifically   The Project is not a landing
All commercial activities including, the                                      addressed the Waterways works        therefore PO3 is not applicable.
loading and unloading of passengers                                           code.
and boat docking is confined to the
commercial lease areas of the
respective commercial operation.

Editor’s Note— The commercial lease
area is the lease area at the time of
gazettal of this plan
Car parking                               No acceptable outcome provided.     The applicant has not specifically   The Project does not require
PO4                                                                           addressed the Waterways works        carparking therefore PO4 is not
Sufficient car parking is provided on                                         code.                                applicable.
site to accommodate the number and
type of vehicles likely to be generated
by the use
Siting – prescribed tidal works outside Noosa Waters Estate
PO5                                       No acceptable outcome provided.     The applicant has not specifically   The Project does not include
The construction of new jetties,                                              addressed the Waterways works        jetties, wharves or boardwalks
wharves and boardwalks on freehold                                            code.                                on freehold land therefore PO5
                                                                                                                   is not applicable.

Section 15

land in largely undeveloped sections of
a watercourse is avoided.
PO6                                       No acceptable outcome provided.       The applicant has not specifically   The Project does not include
The construction of new jetties and                                             addressed the Waterways works        jetties or wharves on public land
wharves on public lands is avoided                                              code.                                therefore PO6 is not applicable.
unless there is a clear demonstrated
community benefit and community
support.
PO7                                       AO7                                   The applicant has not specifically   The Project satisfactorily
Prescribed tidal works are not located    Refer to Figure 9.4.9.3M— Noosa       addressed the Waterways works        complies with PO7. The Noosa
on the southern bank of the Noosa         Heads Lions Park to Weyba Bridge.     code.                                Sound East site and the Noosa
River and tributaries between the                                                                                    Sound west site are located
Noosa Heads Lions Park and Weyba                                                                                     between the Noosa Heads Lions
Bridge (Refer to Figure 9.4.9.3M).                                                                                   Park and Weyba Bridge.
                                                                                                                     However given the nature of the
                                                                                                                     Project being located on the
                                                                                                                     seabed not the bank of the
                                                                                                                     Noosa River it is considered that
                                                                                                                     the intention of this
                                                                                                                     Performance Outcome is met.
PO8                                      No acceptable outcome provided.       The applicant has not specifically    The Project does not include
Prescribed tidal works do not include                                          addressed the Waterways works         extensions of on-site
extensions of on-site recreational areas                                       code.                                 recreational areas therefore
unless there is a clear demonstrated                                                                                 PO8 is not applicable.
community benefit and community
support.
Character, amenity & access - prescribed tidal works outside Noosa Waters Estate
Site Responsive Design                   AO9.1                                 The applicant has not specifically    The Project satisfactorily
PO9                                      For lots with waterway frontage       addressed the Waterways works         complies with PO9. Given the
Prescribed tidal works are designed      greater than 15 metres in width,      code.                                 nature of the Project, lot
and sited to ensure—                     jetties and pontoons are setback a                                          boundaries and vessel berthing
                                         minimum of 3 metres from the                                                are not applicable.

Section 16

(a) they are contained within the       prolongation of the boundaries             Visual amenity will not be
    prolongation of boundaries of       (Refer Figure 9.4.9.3A).                   impacted given the Project is
    the lot;                                                                       predominantly on seabed/rocky
(b) that when a vessel is berthed it    AO9.2                                      intertidal areas.
    does not encroach over the          For lots with waterway frontage of         The most likely area of conflict
    prolongation of boundaries of       less than 15 metres in width               between the Project and
    the lot;                            (including lots located in waterway        existing uses is at the proposed
(c) a high level of visual amenity is   bends or at the head of the                load-out facility at Noosaville.
    maintained when viewed from         waterway)—
    the waterway and adjoining               (a) a joint application is made       Potential conflicts with uses in
    lands;                                         with the adjoining owner; or    the water and foreshore will be
(d) they avoid conflicts with uses           (b) where a joint application is      short-term and minimised by
    in the water and on the                        not possible, jetties and       appropriate configuration of the
    foreshore and adjoining lands;                 pontoons—                       proposed load-out site at
(e) cluttering of waterways is               (i) are setback a minimum of 1        Noosaville. The load-out site is
    avoided;                                       metre from the prolongation     configured in two sections
(f) public access to beaches and                   of the boundaries;              leaving sufficient space for
    foreshores is not impeded,               (ii) are not more than 1.2            recreational boaters and
    including the pocket sandy                     metres in width; and            commercial companies to
    beaches and other foreshores             (iii) have no head and are            access the shoreline
    along the Noosa River;                         located such that when a
(g) excessive traffic volumes                      vessel is berthed it does not   The works must be undertaken
    within foreshore areas and                     encroach over the               in accordance with an approved
    adjoining lands are avoided;                   prolongation of a boundary      Construction Environmental
(h) materials blend with the                       (Refer Figure 9.4.9.3B).        Management Plan (CEMP) as
    natural surrounds; and                                                         per Council approval conditions.
(i) they reflect the character and      AO9.3
    setting of the immediate            For lots that adjoin those described
    surrounds of the locality.          in AO9.2, a jetty or pontoon is
                                        located well away from the common
                                        boundary.

Section 17

PO10                                    No acceptable outcome provided.        The applicant has not specifically    The Project does not include
Jetties and wharves are not roofed.                                            addressed the Waterways works         jetties or wharves therefore
                                                                               code.                                 PO10 is not applicable.
PO11                                      No acceptable outcome provided.      The applicant has not specifically    The Project does not include
Boat lifting devices (including boat                                           addressed the Waterways works         boat lifting devices therefore
storage devices) are only located to                                           code.                                 PO11 is not applicable.
services properties on Noosa North
Shore.
PO12                                      No acceptable outcome provided.        The applicant has not specifically  The Project does not include
Large jetties, pontoons and wharves                                              addressed the Waterways works       jetties, pontoons or wharves
that are capable of serving other uses,                                          code.                               therefore PO12 is not
such as for private recreational                                                                                     applicable.
purposes, are not developed.
Design, Construction and Safety for jetties, wharves and pontoons - prescribed tidal works outside Noosa Waters Estate
PO13                                      AO13.1                                 The applicant has not specifically  The Project does not include
Prescribed tidal works are designed       The maximum width of a jetty, jetty    addressed the Waterways works       jetties, wharves or pontoons
and constructed for the sole purpose of head or associated walkway is 1.5        code.                               therefore PO13 is not
providing access to vessels and are       metres, except on Noosa North                                              applicable.
sited and designed to avoid—              Shore.
    (a) cluttering of waterways;
    (b) excessive traffic volumes         AO13.2
         within foreshore areas and       For jetties on Noosa North Shore,
         adjoining lands;                 the maximum width of the jetty
    (c) conflicts with uses on the        head is 2 metres.
         foreshore and adjoining lands;
         and                              AO13.3
    (d) unacceptable risks to personal The maximum length of a jetty head
         and public safety.               is not more than 7 metres.

                                        AO13.4
                                        A pontoon head has a maximum
                                        width of 3 metres and a maximum

Section 18

length of 5 metres (Refer Figure
9.4.9.3C).

AO13.5
For “Y” and “T” shaped jetty heads—
     (a) a maximum area 10.5m²
          excluding any walkway is
          provided; and
     (b) a walkway with a minimum
          length of 3 metres is
          provided (Refer Figure
          9.4.9.3D).
AO13.6
Gangways and walkways serving
jetties and pontoons have at least
one rigid handrail fitted and meet
the following—
     (a) for dwelling houses – a
          minimum width of 750
          millimetres and a maximum
          width of 1.5 metres;
     (b) for other residential uses –
     (i) the gangway for a single
          berth pontoon has a
          minimum width of 900
          millimetres;
     (ii) the gangway for a multiple
          berth pontoon has a
          minimum width of 1.2
          metres if fitted with one
          handrail and 900 millimetres
          if fitted with a handrail on
          each side;

Section 19

     (iii) the primary walkway to
           multiple berth pontoons has
           a maximum width of 1.5
           metres; and
           (iv)the maximum width of a
           gangway is 1.5 metres.

AO13.7
In Noosa Sound, where quaylines are
set, a jetty or pontoon does not
extend into the watercourse beyond
the quayline;

OR

AO13.8
Where no quaylines are set, the
maximum distance a jetty or
pontoon extends into the
watercourse is 10m, unless it can be
demonstrated that a distance in
excess of 10m is essential to safely
access a vessel from the jetty.

Editor’s Note— The quayline is
measured from real property
boundary except where a relevant
State Government Authority
permits the measurement from
High Water Mean Springtide.

AO13.9

Section 20

                                         All attachments to jetties, including
                                         but not limited to boat lifts, jetski
                                         cradles, floating berths and floating
                                         pontoons are located within the
                                         quay line.

                                         AO13.10
                                         Pontoons are structurally capable of
                                         sitting on the sand bed. Rollers and
                                         bracing should account for this
                                         situation.

                                         AO13.11
                                         Jetties and pontoons are free
                                         standing and do not rely on
                                         connecting to any revetment wall or
                                         other structure.
Design, Construction and Safety for Boat Ramps - prescribed tidal works outside Noosa Waters Estate
PO14                                     AO14.1                                The applicant has not specifically   The Project does not include
Boat ramps are designed and              Where there is an existing revetment addressed the Waterways works         boat ramps therefore PO14 is
constructed to—                          wall—                                 code.                                not applicable.
    (a) allow access by a wheeled boat        (a) the level of a boat ramp
        trailer;                                  surface at the revetment
    (b) ensure that unacceptable risks            wall is no more than 150
        to personal and public safety             millimetres above the top of
        are unlikely to be caused;                the wall, not more than 500
    (c) avoid cluttering of the                   millimetres below the top of
        waterways;                                the wall and not more than
    (d) avoid excessive traffic volumes           200 millimetres above the
        within foreshore areas and                existing beach;
        adjoining lands; and                  (b) the ramp extends into the
    (e) ensure that visual amenity of             waterway no more than 9
        the foreshore is maintained.

Section 21

                                                metres from a revetment
                                                wall;
                                            (c) the ramp is constructed at a
                                                uniform grade no steeper
                                                than 20% (1 in 5); and
                                            (d) the outer end of the ramp is
                                                no more than 100
                                                millimetres above the level
                                                of the beach (Refer Figure
                                                9.4.9.3E).

                                        AO14.2
                                        No part of the ramp is to extend
                                        closer than 1 metre to the
                                        prolongation of the boundaries.

                                        AO14.3
                                        The boat ramp surface profile is
                                        concave to allow concentration of
                                        water to the centre of the ramp.
PO15                                    No acceptable outcome provided.      The applicant has not specifically   The Project does not include
No new boat ramps are constructed                                            addressed the Waterways works        boat ramps therefore PO15 is
within the Noosa River system.                                               code.                                not applicable.
Character and amenity - operational works within Noosa Waters Estate waterways
PO16                                     AO16.1                              The applicant has not specifically   The Project is not within the
Works are designed and sited to          For lots with watercourse frontage  addressed the Waterways works        Noosa Waters Estate waterways
ensure—                                  greater than 15 metres in width,    code.                                therefore PO16 is not
    (a) they are contained within the    jetties are setback a minimum of 3                                       applicable.
        prolongation of boundaries of    metres from the prolongation of the
        the lot;                         boundaries (Refer Figure 9.4.9.3A).
    (b) that when a vessel is berthed it
        does not encroach over the       AO16.2

Section 22

    prolongation of boundaries of       For lots with watercourse frontage
    the lot;                            less than 15 metres in width
(c) a high level of visual amenity is   (including lots located in
    maintained when viewed from         watercourse bends or at the head of
    the watercourse and adjoining       the watercourse)—
    lands;                                   (a) a joint application is made
(d) the works avoid conflicts with               with the adjoining owner; or
    uses in the water, on the                (b) where a joint application is
    foreshore and adjoining lands;               not possible, jetties—
(e) materials blend with the                 - are setback a minimum of 1
    natural surrounds;                           metres from the
(f) cluttering of watercourses is                prolongation of the
    avoided;                                     boundaries;
(g) excessive traffic volumes                - are not more than 1.5
    within foreshore areas, on                   metres in width;
    adjoining lands and in the               - have no jetty head;
    water are avoided; and                   - allow for safe access and
(h) they reflect the character and               manoeuvrability of vessels
    setting of the work’s                        for both the neighbouring
    immediate surrounds of the                   property and the subject
    locality.                                    property; and
                                             - are not constructed on sites
                                                 where there is an existing
                                                 shared jetty on either
                                                 prolongation of the side
                                                 property boundaries.

                                        AO16.3
                                        For lots that adjoin those described
                                        in AO16.2, the jetty is located well
                                        away from the common boundary.

Section 23

PO17                                     No acceptable outcome provided        The applicant has not specifically   The Project is not within the
Landings are not roofed.                                                       addressed the Waterways works        Noosa Waters Estate waterways
                                                                               code.                                therefore PO17 is not
                                                                                                                    applicable.
Design, Construction and Safety for Jetties within Noosa Waters Estate waterways
PO18                                      No acceptable outcome provided.     The applicant has not specifically    The Project is not within the
Structures such as handrails, light                                           addressed the Waterways works         Noosa Waters Estate waterways
bollards, piers and pumping equipment                                         code.                                 therefore PO18 is not
for semi-submersible floating docks                                                                                 applicable.
have a maximum height of 1100mm
above the jetty floor.
PO19                                      AO19.1                              The applicant has not specifically    The Project is not within the
Development is designed and               Jetties—                            addressed the Waterways works         Noosa Waters Estate waterways
constructed for the sole purpose of       are a maximum width of 1.5 metres; code.                                  therefore PO19 is not
providing access to vessels and are       a maximum length of a jetty head is                                       applicable.
sited and designed to avoid—              not more than 7 metres (Refer
     (a) cluttering of waterways;         Figure 9.4.9.3C);
     (b) excessive traffic volumes        constructed predominantly of
         within foreshore areas, on       timber;
         adjoining lands and within the   are not constructed parallel to the
         waterway; and                    revetment wall; and extend a
     (c) unacceptable risks to personal maximum of 10 metres past the
         and public safety.               quayline.

                                         AO19.2
                                         For “Y” and “T” shaped jetty heads
                                         or other shaped jetty heads—
                                             (a) a maximum area of 10.5m²
                                                 excluding any walkway is
                                                 provided; and
                                             (b) a walkway with a minimum
                                                 length of 3 metres is

Section 24

       provided to the jetty head
       (Refer Figure 9.4.9.3D).

AO19.3
Jetties have independent support
structures and are not supported by
the revetment wall.

AO19.4
Seep holes in the revetment wall are
not obstructed by any jetty.

AO19.5
For lots comprising a dwelling house
or dual occupancy, a maximum of
one jetty per development is
constructed.

AO19.6
Multiple dwellings with common
property along the waterway
frontage meet the following—
    (a) a maximum of 2 jetties per
        multiple dwelling;
    (b) jetties are shared between
        unit owners;
    (c) a minimum of 20 metres
        separation is provided
        between each jetty;
    (d) the jetty is setback a
        minimum of 3 metres from
        the prolongation of
        boundaries; and

Section 25

    (e) jetty heads and pontoons
        are not constructed (Refer
        Figure 9.4.9.3F).

AO19.7
For multiple dwellings where each
unit has its own individual canal
frontage—
    (a) a joint application with the
        adjoining owner is made;
        and
    (b) jetties are constructed as
        follows—
    - the jetty is shared between
        two unit owners;
    - the jetty straddles the
        common boundary of the
        two units;
    - jetty heads and pontoons
        are not constructed; and
    - fencing between the two
        properties is setback a
        minimum 1 metre from the
        revetment wall to allow for
        efficient access to the jetty
        by both owners (Refer Figure
        9.4.9.3G).

Editor’s Note—Council is unlikely to
support a jetty application for the
exclusive use of one unit owner.

AO19.8

Section 26

                                       Walkways serving jetties have at
                                       least one rigid handrail fitted and the
                                       walkway is a minimum width of 750
                                       millimetres and a maximum width of
                                       1.5 metres where—
                                            (a) the walking surface of the
                                                jetty is constructed level
                                                with the top of the
                                                revetment wall;
                                            (b) water reticulation systems
                                                are fitted with a mechanical
                                                backflow prevention device;
                                                and
                                            (c) electrical reticulation
                                                systems carrying electricity
                                                in excess of 24 volts are not
                                                to extend beyond the
                                                revetment wall.

                                       AO19.9
                                       Any lower-level platform, or siding,
                                       along the jetty walkway has a
                                       maximum width of 500 millimetres
                                       and does not exceed 2m² and does
                                       not interfere with the prolongation
                                       of boundaries as indicated by
                                       Acceptable outcomes AO15.1,
                                       AO15.2 & AO15.3.
PO20                                   No acceptable outcome provided.           The applicant has not specifically   The Project is not within the
Pontoons and boat ramps are not                                                  addressed the Waterways works        Noosa Waters Estate waterways
constructed within the Noosa Waters                                              code.                                therefore PO20 is not
Estate waterways.                                                                                                     applicable.
Boat lifting devices within Noosa Waters Estate waterways

Section 27

PO21                                      AO21.1                                    The applicant has not specifically   The Project is not within the
Boat lifting devices are only             Boat lifting devices are only located     addressed the Waterways works        Noosa Waters Estate waterways
constructed in the absence of a boat      in conjunction with an approved           code.                                therefore PO21 is not
ramp and are designed and located         jetty where—                                                                   applicable.
to—                                            (a) the boat lifting device does
   (a) ensure that unacceptable risks              not extend into the
         to personal and public safety             waterway beyond the end of
         are unlikely to be caused;                the approved jetty;
   (b) avoid cluttering of the                 (b) the boat lifting device is no
         waterway;                                 greater than 4 metres in
   (c) ensure that visual amenity of               width or for a jetty hoist, 2
         the foreshore and waterway is             metres in width;
         maintained including—                 (c) the boat lifting device is
   - avoiding bulky or large                       located adjacent the
         structures; and                           walkway to the jetty and is
   - minimising structures above                   generally perpendicular to
         the water level;                          the revetment wall;
   (d) ensure the structural integrity         (d) the highest part of the boat
         of the works is maintained and            lifting device is no higher
         not compromised; and                      than the top of the
   (e) avoid a secondary boat lifting              revetment wall under
         device (floating dock) that               normal canal water level
         exceeds 8m².                              conditions;
                                               (e) the boat lifting device is not
                                                   located on the jetty head;
                                                   and
                                               (f) the outermost projection of
                                                   any boatlifting device is
                                                   setback a minimum of 1
                                                   metre from the prolongation
                                                   of the boundaries.

                                          AO21.2

Section 28

Only one primary boat lifting device
and one secondary small device
(floating dock) per jetty. The small
secondary floating dock is no greater
than 8m² and purpose designed for
personal watercraft such as jet skis,
kayaks, paddleboards etc.

AO21.3
A shared jetty contains only one
boat lifting device on either side of
the jetty.

AO21.4
The structure may be securely
attached, excluding roped, chains
and straps, to an existing jetty where
a structural engineer's report for the
design is provided certifying that the
jetty is structurally capable of
supporting the boat lifting device
(Refer to Figures 9.4.9.3H – 9.4.9.3J
for examples of boat lifting devices).

AO21.5
For twin jetty structures with central
boat lifting devices-
    (a) are only permitted in the
         absence of any jetties;
    (b) the structure does not
         exceed 10 metres in length;

Section 29

                                             (c) the structure does not
                                                 exceed 7 metres in width;
                                                 and
                                             (d) each jetty is a maximum of
                                                 1.5 metre wide.

Fixed Floating Structures & Boat Ramps within Noosa Waters Estate waterways
PO22                                     No acceptable outcome provided         The applicant has not specifically   The Project is not within the
Fixed floating structures whether or                                            addressed the Waterways works        Noosa Waters Estate waterways
not attached to land (e.g. pontoons                                             code.                                therefore PO22 is not
and any associated walkways) and boat                                                                                applicable.
ramps are not located within the Noosa
Waters Estate.
Flooding and amenity functions - operational works within Noosa Waters Estate waterways
PO23                                     AO23.1                                 The applicant has not specifically   The Project is not within the
The flood detention and amenity          For premises adjoining a waterway      addressed the Waterways works        Noosa Waters Estate waterways
functions of the area adjacent to the    within the Noosa Water estate, no      code.                                therefore PO23 is not
revetment wall within Noosa Waters       building work, filling or excavation                                        applicable.
Estate are retained and enhanced by      works within 4.5 metres of the
ensuring—                                centre line of the top of the concrete
    (a) works do not protrude through revetment wall.
         a batter line of 1:4.5 measured
         from the centre line of the     AO23.2
         revetment wall;                 A minimum of 25% of the area
    (b) there is no additional load      within 4.5 metres of the revetment
         placed on the revetment wall;   wall is planted with shrubs and small
    (c) works do not pose a risk to the trees with a mature height of 3
         membrane adjoining the          metres or less.
         revetment wall;
    (d) amenity of the waterway and      AO23.3
         surrounding land uses is not    The ground surface within the first
         adversely affected by           metre of the revetment wall—
                                             (a) is grass or ground cover; and

Section 30

        development (building, filling       (b) does not include shrubs.
        or excavation) ensuring—
    -   the 4.5 metre setback area is     AO23.4
        predominantly soft                Side boundary fences within 4.5
        landscaping;                      metres of the revetment wall taper
    -   a maximum of 25% of the area      down to a maximum height of 1.2
        is impervious;                    metres at the revetment wall and no
    -   dominant impervious areas         more than 1.5 metres at a distance
        and masonry retaining walls       of 2.25 metres from the revetment
        are avoided;                      wall.
    -   retaining structures and the
        like are light weight, low rise
        and screened by landscaping;
    -   natural materials such as
        timber or rock are used rather
        than manufactured materials;
    -   the acoustic privacy and access
        to sunlight of surrounding
        development is protected; and
    -   views are not impeded.
PO24                                      No acceptable outcome provided.       The applicant has not specifically   The Project is not within the
No shore side anchor points are                                                 addressed the Waterways works        Noosa Waters Estate waterways
installed within 4.5 metres of the                                              code.                                therefore PO24 is not
centre line of the revetment wall.                                                                                   applicable.
PO25                                      No acceptable outcome provided.       The applicant has not specifically   The Project is not within the
No mooring, anchoring, tying or                                                 addressed the Waterways works        Noosa Waters Estate waterways
docking of vessels occurs adjacent to                                           code.                                therefore PO25 is not
the revetment wall.                                                                                                  applicable.

Section 31

3.0 Code for assessable development that is prescribed tidal works
Schedule 3 of Coastal Protection and Management Regulation 2017

 Performance outcome                        Acceptable outcome                   Applicant response   Assessment
 Character and amenity (generally) – prescribed tidal works in a canal
 1.1 Prescribed tidal works in a canal      The design and construction of the   Not applicable.      The Project is not within a canal
 are compatible with their                  prescribed tidal works is            Not in a canal.      therefore PO1.1 is not applicable.
 location, having regard to the             consistent with the following
 following—                                 standards—
 (a) the character and amenity              (a) subject to paragraph (c),
 of the works’ immediate                    prescribed tidal works do not
 surroundings and the                       extend past the side boundary
 locality within which the                  or extended side boundary of
 works are located;                         the lot connected to the
 (b) if the relevant planning               works;
 scheme states the desired                  (b) subject to paragraph (c)—
 character or amenity for the               (i) for prescribed tidal
 works’ immediate                           works for a private
 surroundings or the locality               purpose—the works are
 within which the works are                 not roofed; or
 located—the stated desired                 (ii) for prescribed tidal
 character or amenity                       works for a non-private
                                            purpose—the works are
                                            not roofed unless they
                                            are the main access to
                                            land;
                                            (c) if a relevant planning scheme
                                            standard is more stringent
                                            than the standard mentioned
                                            in paragraph (a) or (b)—the
                                            relevant planning scheme
                                            standard, to the extent it is
                                            more stringent than the

Section 32

Performance outcome                      Acceptable outcome                   Applicant response              Assessment
                                         standard mentioned in
                                         paragraph (a) or (b);
                                         (d) any other relevant planning
                                         scheme standard that is not
                                         inconsistent with the
                                         standards mentioned in
                                         paragraphs (a) to (c).
Character and amenity (generally)—prescribed tidal works not in a canal
2.1 Prescribed tidal works not in a      The design and construction of the   Complies with Performance       The applicant has demonstrated
canal are compatible with their          prescribed tidal works is            Outcome 2.1. Due to the         compliance with PO2.1. As detailed,
location, having regard to the           consistent with the following        nature of the project the       given the nature of the Project the
following—                               standards—                           nominated Acceptable            character and amenity of the works
(a) the character and amenity            (a) subject to paragraph (d),        Outcomes are not                cannot be practically considered.
of the works’ immediate                  prescribed tidal works do not        considered to be suitable       Character and amenity will not be
surroundings and the                     extend past the side boundary        but have been considered.       impacted given the Project is
locality within which the                or extended side boundary of         The works are to restore        predominantly on seabed/rocky
works are located;                       the lot connected to the             rock oyster ecosystems          intertidal areas.
(b) if the relevant planning             works;                               throughout the Noosa
scheme states the desired                (b) subject to paragraph (d),        River estuary that meet
character or amenity for the             prescribed tidal works are the       site suitability criteria and
works’ immediate                         only works of their type             positively interact with
surroundings or the locality             along the edge of the tidal          current human uses. As the
within which the works are               water fronting the lot               Noosa River was
located—the stated desired               connected to the works;              historically characterised
character or amenity                     (c) subject to paragraph (d)—        by significant oyster
                                         (i) for prescribed tidal             ecosystems, they are
                                         works for a private                  considered to be consistent
                                         purpose—the works are                with the character and
                                         not roofed; or                       amenity of the works’
                                         (ii) for prescribed tidal            immediate surroundings
                                         works for a non-private              and the locality in which
                                         purpose—the works are                the works are located.

Section 33

Performance outcome                         Acceptable outcome                  Applicant response             Assessment
                                            not roofed unless they              Restoration Zones have
                                            are the main access to              been developed based on
                                            land;                               Habitat Suitability
                                            (d) if a relevant planning scheme   parameters and
                                            standard is more stringent          Restoration Suitability
                                            than the standard mentioned         parameters as detailed in
                                            in paragraph (a), (b) or            the Project Restoration
                                            (c)—the relevant planning           Plan.
                                            scheme standard, to the             (a) The Restoration Zones
                                            extent it is more stringent         include large areas of the
                                            than the standard mentioned         Noosa River and as such
                                            in paragraph (a), (b) or (c);       are adjacent to multiple
                                            e) any other relevant planning      Lots.
                                            scheme standard that is not         (b) The Works are expected
                                            inconsistent with the               to be implemented
                                            standards mentioned in              progressively with Phase 1
                                            paragraphs (a) to (d).              currently planned and
                                                                                Phase 2 to occur over time
                                                                                as funds become available.
                                                                                As such, Phase 2 could
                                                                                include extension of Phase
                                                                                1 reef habitat which could
                                                                                include placement of
                                                                                additional works of their
                                                                                type adjust to the frontage
                                                                                of the same lots as Phase 1.
                                                                                (c) The works are not
                                                                                roofed.
Character and amenity (height, scale and size)
3.1 Prescribed tidal works are of a        The height, scale and size of the    Complies with Performance The applicant has demonstrated
height, scale and size to ensure           prescribed tidal works is            Outcome 3.1               compliance with PO3.1. Given the
the works are compatible with              consistent with each relevant                                  nature of the Project, the height,

Section 34

Performance outcome                       Acceptable outcome                 Applicant response              Assessment
the character and amenity of              planning scheme standard.          (a) The works are of a          scale and size of the works is
their location, having regard to                                             height, scale and size that     considered consistent with the
the following—                                                               is consistent with natural      natural features of the seabed of the
(a) the height, scale and size of                                            oyster reefs which have         Noosa River.
the natural features of the                                                  historically been present
works’ immediate                                                             within the Noosa River.
surroundings and the                                                         Crest heights are relative to
locality within which the                                                    tidal levels (Mean High
works are located;                                                           Water Springs) for
(b) the height, scale and size of                                            individual sites.
the existing buildings or                                                    (b) The works are of a
other structures in the                                                      lower height and level than
works’ immediate                                                             other rock structures
surroundings and the                                                         within the Noosa River
locality within which the                                                    although extend further
works are located;                                                           seaward than seawall type
(c) if the relevant planning                                                 structures in order to
scheme states the desired                                                    provide larger area of
height, scale or size of                                                     habitat.
buildings or other
structures in the works’
immediate surroundings or
the locality within which
the works are located—the
stated desired height, scale
or size
Character and amenity (materials and colours)
4.1 The materials used for, and the       The materials used for, and        Complies with Performance       The applicant has demonstrated
colours of, prescribed tidal              colours of, the prescribed tidal   Outcome 4.1                     compliance with PO4.1. The
works are compatible with the             works are consistent with each     The works include the           ‘materials and colours’ of the works
character and amenity of the              relevant planning scheme           placement of locally            are considered consistent with the
works’ location, having regard            standard.                          sourced rock and oyster         planning scheme given that the

Section 35

Performance outcome                  Acceptable outcome                   Applicant response          Assessment
to the following—                                                         shell as detailed in ICM    works include locally sourced
(a) the natural features of the                                           drawing SROR-2021-02.       ‘materials’ (rock, oyster shell) from
works’ immediate                                                          a) The materials are        the Noosa River.
surroundings and the                                                      consistent with natural
locality within which the                                                 rocky rubble reefs which
works are located;                                                        are present within some
(b) the existing buildings or                                             area of the Restoration
other structures in the                                                   Zones.
works’ immediate                                                          b) The materials are
surroundings and the                                                      consistent with rock
locality within which the                                                 erosion protection
works are located;                                                        structures located
(c) if the relevant planning                                              throughout the Noosa
scheme states the desired                                                 River.
materials to be used for, or
desired colours of,
buildings or other
structures in the works’
immediate surroundings or
the locality within which
the works are located—the
stated desired materials or
colours
Lighting
5.1 Lighting, other than an aid to   The lighting for the prescribed      Complies with Performance The applicant has demonstrated
navigation, for prescribed tidal     tidal works, other than an aid to    Outcome 5.1                  compliance with PO5.1 given that no
works is installed in a way to       navigation, is consistent with the   The works are oyster         lighting is proposed.
ensure the security and safe use     following standards—                 habitat and will not be lit.
of the works without causing         (a) subject to paragraph (c),
significant adverse effects on the   lighting for prescribed tidal
amenity of the locality within       works is hooded and directed
which the works are located.         downwards;

Section 36

Performance outcome                 Acceptable outcome                    Applicant response            Assessment
                                    (b) subject to paragraph (c), each
                                    lighting standard, to the
                                    extent relevant;
                                    (c) if a relevant planning scheme
                                    standard is more stringent
                                    than the standard mentioned
                                    in paragraph (a) or (b)—the
                                    relevant planning scheme
                                    standard, to the extent the
                                    standard is more stringent
                                    than the standard mentioned
                                    in paragraph (a) or (b);
                                    (d) any other relevant planning
                                    scheme standard that is not
                                    inconsistent with the
                                    standards mentioned in
                                    paragraphs (a), (b) and (c).
Signage
6.1 A sign erected or otherwise     A sign erected or otherwise placed    Complies with Performance     The applicant has demonstrated
placed in position for prescribed   in position for prescribed tidal      Outcome 6.1                   compliance with PO6.1. The
tidal works, other than a sign      works, other than a sign erected or   Signage and aids to           proposed signage is consistent with
erected or placed for safety        placed for safety reasons or under    navigation are to be          the acceptable outcomes.
reasons or under an Act—            an Act, is consistent with the        installed as required by
(a) is compatible with the          following standards—                  MSQ permit conditions.
character and amenity of            (a) subject to paragraph (c), a       Section 7 of the Project
the works’ immediate                sign erected or placed in             Restoration Plan outlines
surroundings and the                position for identifying              navigation aid type,
locality within which the           prescribed tidal works, or the        signage specifications and
works are located; and              owner of the works, is the            signage certification. This
(b) is not a dominant feature of    only sign erected or placed in        selection has been
the works, unless the               position for identifying the          informed by pre-
dominance is for safety             works or owner;

Section 37

Performance outcome                        Acceptable outcome                  Applicant response            Assessment
reasons                                    (b) subject to paragraph (c), a     lodgement discussions with
                                           sign erected or otherwise           MSQ.
                                           placed in position for              a) The aids to navigation
                                           prescribed tidal works is           are to be of a type
                                           integrated into the design and      consistent with standard
                                           construction of the works;          MSQ buoys and are
                                           (c) if a relevant planning scheme   therefore compatible with
                                           standard is more stringent          the character and amenity
                                           than the standard mentioned         of the works’ locality. SCG
                                           in paragraph (a) or (b)—the         has certified that the
                                           relevant planning scheme            signage is consistent with
                                           standard, to the extent it is       the requirements of the
                                           more stringent than the             Coastal Protection and
                                           standard mentioned in               Management Act.
                                           paragraph (a) or (b);               b) The dominance of the
                                           (d) any other relevant planning     signage will be based on
                                           scheme standard that is not         navigational safety
                                           inconsistent with the               requirements.
                                           standards mentioned in
                                           paragraphs (a), (b) and (c).
Earthwork, vegetation and rehabilitation
7.1 Excavation and filling for             The earthwork and filling for the   Not applicable.               The Project does not propose any
prescribed tidal works—                    prescribed tidal works is           The works do not include      excavation or filling therefore PO7.1
(a) is carried out only to the             consistent with each relevant       removal of any material,      is not applicable.
extent reasonably necessary                planning scheme standard.           excavation or filling.
for the works; and
(b) does not have a significant
adverse effect on—
(i) the natural features,
including the banks, of
the tidal water in the
works’ immediate

Section 38

Performance outcome                    Acceptable outcome                     Applicant response              Assessment
surroundings; or
(ii) the level of the surface
of the land under the
tidal water in the
works’ immediate
surroundings or any
foreshore near the
works.
7.2 The location and construction of   Vegetation on land affected by the     Complies with Performance       The applicant has demonstrated
prescribed tidal works ensures         prescribed tidal works is dealt with   Outcome 7.2                     compliance with PO7.2 by avoiding
vegetation is cleared or               in a way consistent with the           The works only allow minor      direct disturbance to terrestrial or
disturbed only to the extent           following standards—                   temporary impacts to            intertidal vegetation at all
reasonably necessary for the           (a) subject to paragraph (b), the      terrestrial vegetation at the   restoration sites.
works.                                 clearing or disturbance of             Tewantin site (Refer ICM
                                       vegetation for a purpose               Drawing NROR-2021-04).
                                       associated with the                    While avoidance of this
                                       construction of prescribed             impact is possible, it is
                                       tidal works, including, for            anticipated the works will
                                       example, parking for                   provide considerable
                                       construction or workers’               enhancement to the
                                       vehicles or stockpiling of             existing degraded habitat
                                       construction materials—                in this location. The impact
                                       (i) is avoided; or                     of the works is limited to
                                       (ii) if the clearing or                the footprint of the
                                       disturbance of                         individual reef patches,
                                       vegetation for a purpose               such that the works will
                                       associated with the                    retain any marine plants
                                       construction of the                    present in access gaps
                                       works can not be                       between reef patches.
                                       avoided—the clearing or
                                       disturbance is limited to
                                       the smallest area of land

Section 39

Performance outcome                Acceptable outcome                     Applicant response             Assessment
                                   reasonably necessary for
                                   the purpose;
                                   (b) any other relevant planning
                                   scheme standard that is not
                                   inconsistent with the standard
                                   mentioned in paragraph (a).
7.3 After the construction of      Land or vegetation affected by the     Complies with Performance      The applicant has demonstrated
prescribed tidal works, any land   prescribed tidal works is dealt with   Outcome 7.3                    compliance with PO7.3 by avoiding
damaged or destabilised by, and    in a way consistent with the           The works only allow minor     direct disturbance to terrestrial or
any vegetation damaged,            following standards—                   temporary impacts to the       intertidal vegetation at all
destroyed or removed by, the       (a) subject to paragraph (b)—          significantly degraded         restoration sites.
construction of the works is       (i) land surfaces damaged              seabed habitat at the
rehabilitated.                     or destabilised by the                 Tewantin site (Refer ICM       Seabed impacted as a result of the
                                   prescribed tidal works                 Drawing NROR-2021-04).         works will ultimately be rehabilitated
                                   are restored and                       The site will be extensively   as part of the works as detailed in
                                   stabilised; and                        habilitated with rocky         ICM Drawing NROR-2021-04.
                                   (ii) vegetation damaged,               substrate and oyster cultch
                                   destroyed or removed by                as part of the proposed
                                   prescribed tidal works is              works. For detail, refer ICM
                                   replaced with native                   drawings and Project
                                   vegetation for the                     Restoration Plan.
                                   locality within which the
                                   works are located, to the
                                   extent it is reasonably
                                   practicable to replace
                                   the vegetation with
                                   native vegetation;
                                   (b) if a relevant planning scheme
                                   standard is more stringent
                                   than the standard mentioned
                                   in paragraph (a)—the
                                   relevant planning scheme

Section 40

Performance outcome                 Acceptable outcome                   Applicant response              Assessment
                                    standard, to the extent it is
                                    more stringent than the
                                    standard mentioned in
                                    paragraph (a);
                                    (c) any other relevant planning
                                    scheme standard that is not
                                    inconsistent with the
                                    standards mentioned in
                                    paragraphs (a) and (b).
Public access – availability
8.1 Prescribed tidal works do not   The design and construction of the   Complies with Performance       The applicant has demonstrated
have a significant adverse effect   prescribed tidal works is            Outcome 8.1                     compliance with PO8.1
on the availability of public       consistent with the following        The design provides for a       The Project does not have a
access to, along or across State    standards—                           minimum distance of 10m         significant adverse effect on the
coastal land.                       (a) subject to paragraph (b),        from foreshore access to        availability of public access to or
                                    prescribed tidal works do not        maintain public use of and      along State coastal land, given it is
                                    involve the erection or              access to and along state       primarily located on the seabed.
                                    placement of any physical            coastal land. Refer ICM         Where the project interfaces with
                                    barrier preventing existing          drawing NROR-2021-00.           State coastal land, appropriate
                                    public access to, along or           At the Tewantin site (ICM       access has been maintained. The key
                                    across State coastal land near       drawing NROR-2021-04)           location where public safety is a
                                    the works;                           upstream of the boat            concern is the load-out facility and
                                    (b) if a relevant planning scheme    ramp, there is an opening       appropriate management and
                                    standard is more stringent           in the vegetation that          separation of project activities from
                                    than the standard mentioned          could provide public access     ongoing public use has been
                                    in paragraph (a)—the                 to the structure if             considered.
                                    relevant planning scheme             desirable. In this location a
                                    standard, to the extent it is        wider 4m access gap has
                                    more stringent than the              been provided between
                                    standard mentioned in                shoreward reef patches to
                                    paragraph (a);                       facilitate safe access by a
                                    (c) any other relevant planning      larger number of persons if

Section 41

Performance outcome               Acceptable outcome                    Applicant response              Assessment
                                  scheme standard that is not           this was desirable (e.g. for
                                  inconsistent with the                 education purposes).
                                  standards mentioned in
                                  paragraphs (a) and (b).
Public access – safety
9.1 The location and design of    Public access to State coastal land   Complies with Performance       The applicant has demonstrated
prescribed tidal works does not   near the prescribed tidal works is    Outcome 9.1                     compliance with PO9.1.
adversely affect the safety of    consistent with each relevant         Members of the public           The location and design of
members of the public accessing   planning scheme standard.             could approach by vessel        the Project does not
State coastal land.                                                     or from land (for some          adversely affect the safety of
                                                                        sites). There are gaps          members of the public accessing
                                                                        between the reef patches        State coastal land, being primarily
                                                                        at the seabed and this          located on the seabed.
                                                                        would allow persons to          Where the project interfaces with
                                                                        transit between the reef        State coastal land, appropriate
                                                                        patches.                        access has been maintained. The key
                                                                        The design includes             location where public safety is a
                                                                        - Crest level at Mean High      concern is the load-out facility and
                                                                        Water Springs will result in    appropriate management and
                                                                        the works being exposed at      separation of project activities from
                                                                        most tides, although some       ongoing public use has been
                                                                        settlement is expected          considered.
                                                                        initially which may result in
                                                                        lowering of crest levels.
                                                                        - Provision of a navigation
                                                                        buoy and signage at each
                                                                        site to reduce the risk of
                                                                        vessel collision with the
                                                                        works, impacts from
                                                                        anchoring and warn against
                                                                        consuming oysters from
                                                                        the works.

Section 42

Performance outcome                         Acceptable outcome                       Applicant response             Assessment
                                                                                     - Gaps between reef
                                                                                     patches to be 1-4m wide to
                                                                                     allow for careful transit of
                                                                                     monitoring personnel and
                                                                                     public. This gap widens at
                                                                                     water level due to batter
                                                                                     slopes. A wider gap
                                                                                     (minimum 4m) is provided
                                                                                     where land-based access is
                                                                                     viable and
                                                                                     educational visits could be
                                                                                     considered (including at
                                                                                     Tewantin see NROR-2021-
                                                                                     04).
                                                                                     - Monitoring and
                                                                                     Maintenance.
                                                                                     A Safety in Design
                                                                                     assessment has been
                                                                                     undertaken.
Navigable access to, or egress from, lots that adjoin, or are in the immediate surroundings of, a lot connected to prescribed tidal works
10.1 Prescribed tidal works that are         The design and construction of the      Not applicable.                The Project is not for private
for a private purpose do not                 prescribed tidal works is               The works are not for a        purposes therefore PO10.1 is not
adversely affect navigable                   consistent with the following           private purpose.               applicable.
access to, or navigable egress               standards—
from, any lot that adjoins, or is            (a) subject to paragraph (b),
in the immediate surroundings                prescribed tidal works—
of, a lot connected to prescribed            (i) for a lot connected to the
tidal works.                                 works for which there is
                                             a water allocation area
                                             —are not constructed
                                             outside the water
                                             allocation area; and

Section 43

Performance outcome                           Acceptable outcome                    Applicant response            Assessment
                                              (ii) for a lot connected to
                                              works for which there is
                                              no water allocation area
                                              —are no closer than
                                              1.5m to that lot’s side
                                              boundary or extended
                                              side boundary;
                                              (b) if a relevant planning scheme
                                              standard is more stringent
                                              than the standard mentioned
                                              in paragraph (a)—the
                                              relevant planning scheme
                                              standard, to the extent it is
                                              more stringent than the
                                              standard mentioned in
                                              paragraph (a).
Infrastructure, including, access, parking, sewerage and water services
11.1 Prescribed tidal works have              The infrastructure for prescribed     Complies with Performance     The applicant has demonstrated
appropriate infrastructure,                   tidal works is consistent with each   Outcome 11.1                  compliance with PO11.1.
including, in particular, road                relevant planning scheme              The nature of the works       Infrastructure including access,
access, parking facilities,                   standard.                             (i.e. restoration of oyster   parking, sewerage and water
sewerage services and water                                                         ecosystems) is such that      services are not relevant to the
services, having regard to the                                                      infrastructure, parking,      operational phase of the Project
following—                                                                          sewerage and water            given the nature of the works.
(a) the nature and scale of the                                                     services are not required.    However where the project
works;                                                                                                            interfaces with existing
(b) the number of people that                                                                                     infrastructure during the
may be on or at the works                                                                                         construction phase (particularly at
at any given time;                                                                                                the load-out facility), appropriate
(c) the number of vehicles that                                                                                   management and separation of
may be on or moored at the                                                                                        project activities from existing
works at any given time;                                                                                          infrastructure has been considered.

Section 44

Performance outcome                        Acceptable outcome                   Applicant response           Assessment
(d) the protection of any
foreshores near the works
and the vegetation and
marine plants on the
foreshores
Design, construction and safety—all prescribed tidal works
12.1 Prescribed tidal works are            The design and construction of the   Alternative Solution for     The applicant has demonstrated
designed and constructed in a              prescribed tidal works is            Performance Outcome          compliance with PO12.1. The
way to ensure they are                     consistent with the following        12.1.                        proposed design and construction of
structurally sound, having                 standards—                           The rock substrate has       the Project is in accordance with
regard to the following—                   (a) subject to paragraph (c), each   been designed by ICM to      relevant engineering standards
(a) relevant engineering                   Australian Standard relevant         be structurally sound,       which considers their location and
standards;                                 to the design or construction        having regard to the         purpose, being primarily on the
(b) the location of the works;             of structures, to the extent         following:                   seabed to provide a restoration
(c) the purpose for which the              requirements stated in the           (a) Relevant Australian      substrate.
works are to be used;                      Standard apply to the design         Standards and
(d) the impact of flooding,                or construction of prescribed        internationally recognised
storm tide, overtopping by                 tidal works;                         best practice guidelines.
waves, projected sea level                 (b) subject to paragraph (c), the    The structure has been
rise, tidal influences and                 projected sea level rise is          certified by an RPEQ
hydrodynamic forces;                       factored into the design and         engineer.
(e) the design life of the works;          construction of the prescribed       (b) Site-specific design
(f) the dead load of the works             tidal works;                         details have been provided
and the intended live load                 (c) if a relevant planning scheme    for Phase 1. The detailed
for the works;                             standard is more stringent           design of Phase 2 is
(g) the impact of hydrostatic              than the standard mentioned          required to be undertaken
pressures on the works;                    in paragraph (a) or (b)—the          by a coastal engineer,
(h) the stability of individual            relevant planning scheme             including consideration of
components of the works,                   standard, to the extent it is        site-specific parameters
including, for example,                    more stringent than the              and selection of a stabile
boulders, concrete blocks                  standard mentioned in                rock grading. Refer ICM
or sandbags                                paragraph (a) or (b).

Section 45

Performance outcome   Acceptable outcome   Applicant response             Assessment
                                           drawing NROR-2012-02
                                           (particularly notes 1 & 2).
                                           (c) The works are to
                                           provide a suitable
                                           substrate for habitat
                                           enhancement and restore
                                           rock oyster ecosystems
                                           throughout the Noosa
                                           River.
                                           (d) The design considers
                                           forces resulting from tidal
                                           and flood flows as well as
                                           wave action and vessel
                                           wake. Due to the nature of
                                           the works, crest levels have
                                           been selected to optimise
                                           habitat suitability for the
                                           target species. High tides,
                                           storm tides and flooding
                                           would be expected to
                                           result in overtopping of the
                                           structure. The need for
                                           future adaptation in
                                           response to climate change
                                           will be dependent on
                                           monitoring of ecosystem
                                           health over time.
                                           (e) The design life of the
                                           works is 50 years, although
                                           maintenance, modification
                                           or adaptation may be
                                           required during this time in

Section 46

Performance outcome   Acceptable outcome   Applicant response            Assessment
                                           response to monitoring of
                                           habitat development.
                                           (f) Stability of rock
                                           structures has been
                                           determined in accordance
                                           with best practice
                                           guidelines. It is not
                                           intended for the works to
                                           be trafficable by
                                           pedestrians as this would
                                           negatively impact on the
                                           habtitat.
                                           (g) The design considers
                                           that the works will be
                                           underwater at times and
                                           subject to hydrostatic
                                           pressures, but given the
                                           nature of the works this is
                                           not critical to the design.
                                           (h) The stability of
                                           individual rocks has been
                                           determined based on
                                           internationally recognised
                                           world’s best practice
                                           guidelines. Rock structure
                                           are inherently flexible and
                                           able to accommodate
                                           some movement or
                                           displacement of individual
                                           boulders, which may occur
                                           during a design event. This

Section 47

Performance outcome                  Acceptable outcome                   Applicant response            Assessment
                                                                          is to be addressed through
                                                                          maintenance if required.
                                                                          The oyster shell is not
                                                                          inherently stable in the
                                                                          design site conditions, but
                                                                          shell stability has been
                                                                          optimised by the use of
                                                                          whole shell, the mixing of
                                                                          shell with the rocky
                                                                          substrate to secure it
                                                                          within the rocky matrix,
                                                                          the placement of loose
                                                                          oyster cultch as a single
                                                                          layer by hands into
                                                                          interstitial voids and the
                                                                          capping of the volume of
                                                                          loose shell placed to
                                                                          10kg/m3. Refer ICM
                                                                          drawing NROR-2021-02
                                                                          Notes 3 & 5 for placement
                                                                          requirements. Where
                                                                          monitoring identifies
                                                                          displaced shell that is more
                                                                          than 5m outside the
                                                                          Restoration Site, it is to be
                                                                          removed in the event that
                                                                          it is resulting in negative
                                                                          impacts. Refer ICM drawing
                                                                          NROR2021-00 Note 4.2 and
                                                                          Project Restoration Plan.
12.2 Prescribed tidal works do not   The design and construction of the   Complies with Performance The applicant has demonstrated
adversely affect the structural      prescribed tidal works is            Outcome 12.2.                 compliance with PO12.2. Given the

Section 48

Performance outcome                 Acceptable outcome                   Applicant response            Assessment
integrity of any existing           consistent with the following        The works allow for a         proposed minimum distance from
revetment or seawall or another     standards—                           minimum distance of at        existing structures and absence of
existing structure.                 (a) subject to paragraph (b),        least 30m from existing       project components relating to (a) (i)
                                    prescribed tidal works,              tidal works. As such, it is   and (ii), the Project will not impact
                                    including any abutment,              not anticipated that the      on other existing structures.
                                    piling or other structure            works will impact on any
                                    connected with the works—            existing structure.
                                    (i) do not place an
                                    additional load on any
                                    existing revetment or
                                    seawall or another
                                    existing structure; or
                                    (ii) can be structurally
                                    supported by an existing
                                    revetment or seawall or
                                    another existing
                                    structure;
                                    (b) if a relevant planning scheme
                                    standard is more stringent
                                    than the standard mentioned
                                    in paragraph (a)—the
                                    relevant planning scheme
                                    standard, to the extent it is
                                    more stringent than the
                                    standard mentioned in
                                    paragraph (a).
12.3 Prescribed tidal works are     The design and construction of the   Complies with Performance     The applicant has demonstrated
designed and constructed in a       prescribed tidal works is            Outcome 12.3.                 compliance with PO12.3 subject to
way to ensure they do not           consistent with the following        The purpose of the works is   monitoring.
adversely affect the stability of   standards—                           not to provide erosion        Given the nature of the works
the bed and banks of tidal water.   (a) subject to paragraph (b),        protection, but to restore    (placement of additional oyster/rock
                                    prescribed tidal works do not        rock oyster ecosystems        substrates on the seabed) there is

Section 49

Performance outcome   Acceptable outcome                  Applicant response             Assessment
                      cause, by changing the flow         throughout the Noosa           the potential for short-term
                      of water, the removal of, or        River.                         disturbance to the stability of the
                      disturbance to, the sediment        However, Concept Layouts       bed and banks of tidal water. The
                      on the bed and banks of tidal       2 & 3 (segmented               Project demonstrates appropriate
                      water;                              longshore modules most         mitigation and management
                      (b) if a relevant planning scheme   suitable for locations which   measures have been considered
                      standard is more stringent          are vulnerable to erosion      through the Noosa Oyster Ecosystem
                      than the standard mentioned         and adopted for Phase 1)       Restoration Project – Project
                      in paragraph (a)—the                are anticipated to act as a    Restoration Plan. In addition, as
                      relevant planning scheme            segmented reef patches         required under condition 21 of SARA
                      standard, to the extent it is       and provide some               Decision Notice, the Inspection and
                      more stringent than the             sheltering to the shoreline    Monitoring Program will monitor any
                      standard mentioned in               from wave action and           potential impacts and provide
                      paragraph (a).                      vessel wake and result in      management measures to remediate
                                                          reduced erosion. The           any adverse impacts should they
                                                          layout is aligned with the     occur.
                                                          river flows and provide        Furthermore, the works must be
                                                          gaps between reef patches      undertaken in accordance with an
                                                          to limit potential for         approved Construction
                                                          impacts on natural             Environmental Management Plan
                                                          processes.                     (CEMP) as per Council approval
                                                          The proposed works are         conditions.
                                                          not expected to adversely
                                                          affect the stability of the
                                                          bed or banks of tidal
                                                          waters. Some settlement
                                                          or localised scour on the
                                                          seaward side may occur
                                                          and the works are
                                                          expected to be reprofiled
                                                          or topped up in response.

Section 50

Performance outcome                 Acceptable outcome                   Applicant response              Assessment
12.4 Prescribed tidal works are     The design and construction of the   Complies with Performance       The applicant has demonstrated
designed and constructed using      prescribed tidal works is            Outcome 12.4.                   compliance with PO12.4. Given the
materials suitable for marine       consistent with the following        The rock utilised is to be      nature of the Project and the
environments, having regard to      standards—                           suitable for use in the         materials proposed, the works are
their ability to resist the         (a) subject to paragraph (b), each   marine environment. It is       suitable for the marine environment
following—                          Australian Standard relevant         not vulnerable to attack by     and comply with relevant Standards.
(a) attack by marine                to the materials that should be      marine organisms,
organisms;                          used, or the measures that           corrosion, deterioration,
(b) corrosion;                      should be taken to treat             abrasion, immersion in
(c) deterioration or breakage       materials used, for structures,      seawater or wave action
resulting from exposure to          to the extent the requirements       within the life of the works.
environmental conditions            stated in the Standard apply         For specifications, refer
including, for example, the         to structures located in a           ICM drawing NROR-2021-
following—                          marine environment;                  02 Note 2.1.
(i) abrasion;                       (b) if a relevant planning scheme    The cured oyster shell was
(ii) immersion in                   standard is more stringent           originally sourced from
seawater;                           than the standard mentioned          within the marine
(iii) wave action                   in paragraph (a)—the                 environment and is
                                    relevant planning scheme             suitable for use in the
                                    standard, to the extent it is        Noosa River subject to
                                    more stringent than the              curing in accordance with
                                    standard mentioned in                relevant legislation. For
                                    paragraph (a).                       specifications, refer ICM
                                                                         drawing NROR-2021-02
                                                                         and Project Restoration
                                                                         Plan.
12.5 Prescribed tidal works are     The design and construction of the   Complies with Performance       The applicant has demonstrated
designed and constructed in a       prescribed tidal works is            Outcome 12.5.                   compliance with PO12.5. The works
way to ensure they do not           consistent with the following        The works are seaward of        are satisfactorily located in order to
adversely affect the operation or   standards—                           MHWS and will not               avoid impact to existing stormwater
maintenance of any existing         (a) subject to paragraph (c),        adversely affect the            outlets.
stormwater outlet.                  vessels moored at prescribed         operation or maintenance

Section 51

Performance outcome                  Acceptable outcome                   Applicant response           Assessment
                                     tidal works do not impede the        of any existing stormwater
                                     discharge of stormwater;             outlet.
                                     (b) subject to paragraph (c),
                                     prescribed tidal works do not
                                     restrict access to any
                                     stormwater outlet;
                                     (c) if a relevant planning scheme
                                     standard is more stringent
                                     than the standard mentioned
                                     in paragraph (a) or (b)—the
                                     relevant planning scheme
                                     standard, to the extent it is
                                     more stringent than the
                                     standard mentioned in
                                     paragraph (a) or (b).
12.6 Prescribed tidal works are      The design and construction of the   Complies with Performance    The Project satisfactorily complies
designed and constructed in a        prescribed tidal works is            Outcome 12.6 (subject to     with PO12.6 subject to monitoring.
way to ensure they do not            consistent with the following        monitoring)                  Given the nature of the works
adversely affect the water           standards—                           As oysters are filter        (placement of additional oyster/rock
quality of tidal water, including,   (a) subject to paragraph (b), each   feeders, the works would     substrates on the seabed) there is
in particular, as a result of—       Australian Standard relevant         be expected to result in     the potential for short-term impacts
(a) release, into the tidal water,   to the design or construction        improved water quality       to water quality.
of materials used in the             of structures under, within or       outcomes for the Noosa       The Project demonstrates
construction of the works;           over tidal water, to the extent      River.                       appropriate mitigation and
or                                   the requirements stated in the       During construction, rock    management measures have been
(b) disturbance to the sediment      Standard are directed at             placement activities may     considered through the Noosa
on the bed and banks of the          maintaining the water quality        result in some suspension    Oyster Ecosystem Restoration
tidal water; or                      of tidal water;                      of sediment. Construction    Project – Project Restoration Plan. In
(c) exposure to acid sulphate        (b) if a relevant planning scheme    materials are to be clean    addition, as required under
soils                                standard is more stringent           and free of topsoil or       condition 21 of SARA Decision
                                     than the standard mentioned          organic material.            Notice, the Inspection and
                                     in paragraph (a)—the                 Construction is to be        Monitoring Program will monitor any

Section 52

Performance outcome   Acceptable outcome              Applicant response            Assessment
                      relevant planning scheme        managed to minimise           potential impacts and provide
                      standard, to the extent it is   potential for impacts and     management measures to remediate
                      more stringent than the         monitoring of sensitive       any adverse impacts should they
                      standard mentioned in           receptors is to be            occur.
                      paragraph (a).                  undertaken. Detailed          Furthermore, the works must be
                                                      requirements are outlined     undertaken in accordance with an
                                                      in ICM drawing NROR-          approved Construction
                                                      2021-02 and section 6.4 of    Environmental Management Plan
                                                      the Project Restoration       (CEMP) as per Council approval
                                                      Plan.                         conditions.
                                                           a) Construction waste
                                                              or excess materials
                                                              are not to be
                                                              released into tidal
                                                              waters.
                                                           b) Works do not
                                                              include
                                                              disturbance of
                                                              sediment on the
                                                              seabed or banks.
                                                              Incidental
                                                              disturbance as a
                                                              result of rock
                                                              placement is to be
                                                              minimised and
                                                              monitored as
                                                              described above.
                                                           c) Works do not
                                                              include
                                                              disturbance or
                                                              exposure of
                                                              sediment (Acid

Section 53

Performance outcome               Acceptable outcome                   Applicant response            Assessment
                                                                                Sulphate Soils or
                                                                                otherwise).
12.7 Prescribed tidal works are   The design and construction of the   Complies with Performance     The applicant has demonstrated
designed and constructed in a     prescribed tidal works is            Outcome 12.7.                 compliance with PO12.7.
way to ensure they are safe for   consistent with the following        The works have been           The Project is designed and
persons using the works.          standards—                           designed to be stable and     constructed in a way to ensure they
                                  (a) subject to paragraph (d), each   well interlocked with gaps    are safe for persons using them,
                                  Australian Standard relevant         between reef patches that     given they are primarily located on
                                  to the design or construction        are 1-4m wide at the          the seabed for oyster habitat
                                  of structures, the materials         seabed. The works are         restoration purposes. The key
                                  that should be used, or the          considered to be generally    location where public safety is a
                                  measures that should be taken        safe for an aware person      concern is the load-out facility and
                                  to treat materials used, for         monitoring the works          appropriate management and
                                  structures, to the extent the        and/or carefully traversing   separation of project activities from
                                  requirements stated in the           between individual            ongoing public use has been
                                  Standard are directed at             modules. The modules          considered.
                                  ensuring any surface of              themselves are not
                                  prescribed tidal works on            intended to be traversed
                                  which a person may stand or          and are designed to have
                                  walk is—                             uneven surfaces with voids
                                  (i) not slippery; and                and loose oyster shell to
                                  (ii) does not have any               provide a suitably complex
                                  feature that may cause               habitat that has the
                                  the person to trip or fall;          potential to provide a trip
                                  (b) subject to paragraph (d), any    hazard. Over time, these
                                  part of prescribed tidal works       surfaces are intended to be
                                  that is unsafe for persons           inhabited by oysters and
                                  using the works is surrounded        other species which could
                                  by adequate barriers to deter        result in the rocks
                                  persons from entering the            becoming both slippery
                                  part;                                and sharp. These risks are
                                  (c) subject to paragraph (d), each   inherent with the natural

Section 54

Performance outcome                   Acceptable outcome                   Applicant response              Assessment
                                      Australian Standard relevant         type of habitat being
                                      to the design or construction        restored and while they
                                      of structures, to the extent the     have been minimised
                                      requirements stated in the           where possible they cannot
                                      Standard are directed at             be eliminated. Monitoring
                                      ensuring prescribed tidal            and maintenance is
                                      works provide safety ladders         required (particularly in the
                                      or other design features for         years after deployment).
                                      the safety of a person who           Refer to the Safety in
                                      falls off the works into water;      Design assessment for
                                      (d) if a relevant planning scheme    additional detail.
                                      standard is more stringent
                                      than the standard mentioned
                                      in paragraph (a), (b) or
                                      (c)—the relevant planning
                                      scheme standard, to the
                                      extent it is more stringent
                                      than the standard mentioned
                                      in paragraph (a), (b) or (c).
12.8 Appropriate measures are taken   The design and construction of the   Complies with Performance       The applicant has demonstrated
for prescribed tidal works for a      prescribed tidal works is            Outcome 12.8.                   compliance with PO12.8. The Project
non-private purpose to ensure an      consistent with the following        The works are to be             demonstrates appropriate measures
unsupportable live load is not        standards—                           marked by a buoy with           (signage and marker buoys) to avoid
applied to the works by persons       (a) subject to paragraph (b),        signage indicating that the     an unsupportable live load being
or vehicles.                          prescribed tidal works have          works are a restoration         applied to the works.
                                      erected or placed in position        area. Details are available
                                      on or near the works, a sign         in section 7 of the Project
                                      that—                                Restoration Plan.
                                      (i) is visible at all times;
                                      and
                                      (ii) states the maximum live
                                      load that may be applied

Section 55

Performance outcome                     Acceptable outcome                   Applicant response         Assessment
                                        to the works, in terms of
                                        the maximum number of
                                        persons that may be on
                                        the works at any given
                                        time or the maximum
                                        number of vehicles of a
                                        particular type that may
                                        be on or moored at the
                                        works at any given time;
                                        (b) if a relevant planning scheme
                                        standard is more stringent
                                        than the standard mentioned
                                        in paragraph (a)—the
                                        relevant planning scheme
                                        standard, to the extent it is
                                        more stringent than the
                                        standard mentioned in
                                        paragraph (a).
12.9 Prescribed tidal works, other      The design and construction of the   Not applicable.            The Project is not located within a
than a prescribed deck for a            prescribed tidal works is            Not in a canal.            canal therefore PO12.9 is not
private purpose, are designed           consistent with each relevant                                   applicable.
and constructed in a way to             planning scheme standard.
ensure the use of tidal water in a
canal for a non-maritime
purpose is minimised.
12.10 Prescribed tidal works that are   (s 5(2) outcome)                     Not applicable.            The Project is not a prescribed deck
a prescribed deck and for a             The design and construction of the   Not a deck for a private   for a private purpose therefore
private purpose, are designed           prescribed deck is consistent with   purpose.                   PO12.10 is not applicable.
and constructed in a way to             the following standards—
ensure the use of tidal water in a      (a) subject to paragraph (c), a
canal for a non-maritime                prescribed deck does not
purpose is minimised.                   extend more than 3m from

Section 56

Performance outcome                     Acceptable outcome                    Applicant response   Assessment
                                        the waterfront boundary of
                                        the lot connected to the deck;
                                        (b) subject to paragraph (c), a
                                        prescribed deck is at least 3m
                                        inside of the side boundary or
                                        extended side boundary of
                                        the lot connected to the deck;
                                        (c) if a relevant planning scheme
                                        standard is more stringent
                                        than the standard mentioned
                                        in paragraph (a) or (b)—the
                                        relevant planning scheme
                                        standard, to the extent it is
                                        more stringent than the
                                        standard mentioned in
                                        paragraph (a) or (b).
Design, construction and safety—boat ramps and slipways for private purpose
13.1 Prescribed tidal works that are a  (s 5(2) outcome)                      Not applicable.      The Project is not a boat ramp or
boat ramp or slipway for a              The design and construction of the    Not a boat ramp or   slipway therefore PO13.1 is not
private purpose are designed and        boat ramp or slipway is consistent    slipway.             applicable.
constructed in a way to ensure          with the following standards—
they are structurally sound while       (a) subject to paragraph (c), the
also ensuring the safe movement         walls at the edge of the boat
of vehicles or persons between          ramp or slipway penetrate
the boat ramp or slipway and the        into the earth at least 600mm
surface of the land on which the        below the surface of the land
boat ramp or slipway is located.        on which the boat ramp or
                                        slipway is located;
                                        (b) subject to paragraph (c), the
                                        surface of the boat ramp or
                                        slipway is no more than
                                        200mm above the surface of

Section 57

Performance outcome                      Acceptable outcome                   Applicant response       Assessment
                                         the land on which it is
                                         located;
                                         (c) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a) or (b)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a) or (b).
13.2 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.          The Project is not a boat ramp or
boat ramp or slipway for a               The design and construction of the   Not a boat ramp or       slipway therefore PO13.2 is not
private purpose are designed and         boat ramp or slipway is consistent   slipway. Not a private   applicable.
constructed in a way to ensure           with the following standards—        purpose.
the safe movement of vehicles or         (a) subject to paragraph (d), the
persons over the boat ramp or            upper surface of a boat ramp
slipway.                                 or slipway has a width of—
                                         (i) for a boat ramp or
                                         slipway with vehicle
                                         access—no less than
                                         3.6m; or
                                         (ii) for a boat ramp or
                                         slipway without vehicle
                                         access—no less than
                                         3.0m;
                                         (b) subject to paragraph (d), the
                                         whole upper surface of a boat
                                         ramp or slipway is treated to
                                         prevent it from becoming
                                         slippery by using any of the
                                         following methods—

Section 58

Performance outcome   Acceptable outcome                  Applicant response   Assessment
                      (i) forming grooves over
                      the surface, as close as
                      possible to 40mm wide,
                      20mm deep and 150mm
                      apart, and at an angle as
                      close as possible to 70°
                      to the centre-line of the
                      boat ramp or slipway;
                      (ii) covering the surface
                      with a substance
                      ordinarily used on
                      slippery surfaces to
                      prevent skidding;
                      (iii) making, through a
                      physical act, the surface
                      coarse before it sets,
                      including, for example,
                      by raking the surface;
                      (c) subject to paragraph (d), the
                      upper surface of a boat ramp
                      or slipway for which a winch
                      is not used to hoist or haul
                      vessels onto the boat ramp or
                      slipway is at a gradient of not
                      steeper than—
                      (i) if the surface is treated
                      by using a method
                      mentioned in paragraph
                      (b)(i) or (ii)—1:7; or
                      (ii) otherwise—1:10;
                      (d) if a relevant planning scheme
                      standard is more stringent

Section 59

Performance outcome                       Acceptable outcome                   Applicant response   Assessment
                                          than the standard mentioned
                                          in paragraph (a), (b) or
                                          (c)—the relevant planning
                                          scheme standard, to the
                                          extent it is more stringent
                                          than the standard mentioned
                                          in paragraph (a), (b) or (c).
Design, construction and safety—bridges
14.1 Prescribed tidal works that are a    The design and construction of the   Not applicable       The Project is not a bridge therefore
bridge do not adversely affect            bridge is consistent with the        Not a bridge         PO14.1 is not applicable.
existing public use of tidal              following standards—
water, including, for example,            (a) subject to paragraph (b), the
use of the tidal water for                clearance levels under a
canoeing, swimming or other               bridge are high enough to
recreational activities.                  allow continued public use of
                                          tidal water over which it is
                                          constructed;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
14.2 Prescribed tidal works that are a    The design and construction of the   Not applicable       The Project is not a bridge therefore
bridge do not adversely affect            bridge is consistent with the        Not a bridge.        PO14.1 is not applicable.
the flow of tidal water under the         following standards—
bridge.                                   (a) subject to paragraph (b)—
                                          (i) if a bridge can be
                                          adequately supported

Section 60

Performance outcome                       Acceptable outcome                   Applicant response   Assessment
                                          without erecting or
                                          placing a foundation
                                          support in tidal
                                          water—no foundation
                                          support to support the
                                          bridge is erected or
                                          placed in the tidal water;
                                          or
                                          (ii) otherwise—only the
                                          minimum number of
                                          foundation supports
                                          required to support the
                                          bridge is used;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
Design, construction and safety—prescribed decks
15.1 Prescribed tidal works that are a    (s 5(2) outcome)                     Not applicable       The Project is not a prescribed deck
prescribed deck and for a private         The design and construction of the   Not a deck           therefore PO15.1 is not applicable.
purpose are designed and                  prescribed deck is consistent with
constructed in a way to ensure            the following standards—
the deck is able to support its           (a) subject to paragraph (b), each
intended loads, having regard to          of the following Australian
its relevant loading matters.             Standards to the extent
                                          requirements stated in the
                                          Standard apply to relevant

Section 61

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         loading matters for the design
                                         or construction of the
                                         prescribed deck—
                                         (i) AS/NZS 1170.0;
                                         (ii) AS/NZS 1170.1;
                                         (iii) AS/NZS 1170.2;
                                         (iv) AS 4997;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
15.2 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.      The Project is not a prescribed deck
prescribed deck and for a                The design or construction of the    Not a deck.          therefore PO15.2 is not applicable.
non-private purpose are                  prescribed deck is consistent with
designed and constructed in a            the following standards-
way to ensure the deck is able to        (a) subject to paragraph (b), each
support its intended loads,              of the following Australian
having regard to its relevant            Standards to the extent
loading matters.                         requirements stated in the
                                         Standard apply to relevant
                                         loading matters for the design
                                         or construction of a
                                         prescribed deck—
                                         (i) AS/NZS 1170.0;
                                         (ii) AS/NZS 1170.1;
                                         (iii) AS/NZS 1170.2;
                                         (iv) AS 1170.4;

Section 62

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         (v) AS 4997;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
15.3 Prescribed tidal works that are a   The design and construction of the   Not applicable.      The Project is not a prescribed deck
prescribed deck do not prevent           prescribed deck is consistent with   Not a deck.          therefore PO15.3 is not applicable.
or hinder remedial work being            the following standards—
undertaken on any bank of tidal          (a) subject to paragraph (b), a
water or for any existing                prescribed deck either—
revetment or seawall or another          (i) can be easily dismantled
existing structure.                      and reassembled; or
                                         (ii) does not restrict the
                                         movement of machinery
                                         ordinarily used for
                                         remedial work to any
                                         bank of tidal water or
                                         any existing revetment
                                         or seawall or other
                                         existing structure;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the

Section 63

Performance outcome                       Acceptable outcome                     Applicant response     Assessment
                                          standard mentioned in
                                          paragraph (a).
Design, construction and safety—jetties and piers
16.1 Prescribed tidal works that are a    (s 5(2) outcome)                       Not applicable.        The Project is not a jetty or pier
jetty or pier are designed and            The design and construction of the     Not a jetty or pier.   therefore PO16.1 is not applicable.
constructed in a way to ensure            jetty or pier is consistent with the
the jetty or pier is able to support      following standards-
its intended loads, having regard         (a) subject to paragraph (b), each
to its relevant loading matters.          of the following Australian
                                          Standards to the extent
                                          requirements stated in the
                                          Standard apply to relevant
                                          loading matters for the design
                                          or construction of the jetty or
                                          pier—
                                          (i) AS/NZS 1170.0;
                                          (ii) AS/NZS 1170.1;
                                          (iii) AS/NZS 1170.2;
                                          (iv) AS 1170.4;
                                          (v) AS 4997;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
16.2 Prescribed tidal works that are a    The design and construction of the                            The Project is not a jetty or pier
jetty or a pier are designed and          jetty or pier is consistent with the                          therefore PO16.2 is not applicable.
constructed in a way to ensure            following standards—

Section 64

Performance outcome                      Acceptable outcome                     Applicant response     Assessment
the jetty or pier remains above          (a) subject to paragraph (b),
the water at highest                     either—
astronomical tide.                       (i) the level of the deck of
                                         the jetty or pier is at
                                         least 300mm above the
                                         water at highest
                                         astronomical tide; or
                                         (ii) piles or other markers
                                         indicate the presence of
                                         the jetty or pier when the
                                         jetty or pier is less than
                                         300mm above the water
                                         at highest astronomical
                                         tide;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
16.3 Prescribed tidal works that are a   (s 5(2) outcome)                       Not applicable.        The Project is not a jetty or pier
jetty or pier and for a private          The design and construction of the     Not a jetty or pier.   therefore PO16.3 is not applicable.
purpose and are on State tidal           jetty or pier is consistent with the
land are designed and                    following standards—
constructed in a way to ensure           (a) subject to paragraph (b)—
the jetty or pier is of a size           (i) all parts of the deck of
suitable for the use of a vessel         the jetty or pier have a
while still minimising the               width of at least 900mm
amount of tidal water occupied           and not more than 3m;

Section 65

Performance outcome                       Acceptable outcome                   Applicant response          Assessment
by the jetty or pier.                     and
                                          (ii) all parts of the jetty or
                                          pier are within a water
                                          allocation area for the
                                          lot connected to the jetty
                                          or pier;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
Design, construction and safety—pipelines and other underground services
17.1 The design and construction of       s 5(2) outcome)                      Not applicable.             The Project is not a pipeline or
prescribed tidal works that are a         The design and construction of the   Not underground services.   underground service therefore
pipeline or another underground           pipeline or underground service is                               PO17.1 is not applicable.
service ensures vessels                   consistent with the following
anchoring near the works can              standards—
not interfere with, or damage,            (a) subject to paragraph (b)—
the works.                                (i) for a pipeline that is gas
                                          or liquid petroleum
                                          pipeline—AS/NZS 2885
                                          to the extent
                                          requirements stated in
                                          the Standard apply to the
                                          design or construction of
                                          the pipeline; or
                                          (ii) for another pipeline or
                                          other underground

Section 66

Performance outcome                       Acceptable outcome                  Applicant response   Assessment
                                          service—the pipeline or
                                          service is installed at
                                          least 1.2m below the
                                          surface of land, after it is
                                          installed;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
Design, construction and safety—pontoons
18.1 Prescribed tidal works that are a   s 5(2) outcome)                      Not applicable.      The Project is not a pontoon
pontoon and not used only for            The design and construction of the   Not a pontoon.       therefore PO18.1 is not applicable.
rowing, are designed and                 pontoon is consistent with the
constructed in a way to ensure           following standards—
the pontoon is able to support its       (a) subject to paragraph (b), each
intended loads, having regard to         of the following Australian
its relevant loading matters.            Standards to the extent
                                         requirements stated in the
                                         Standard apply to relevant
                                         loading matters for the design
                                         or construction of the
                                         pontoon—
                                         (i) AS/NZS 1170.0;
                                         (ii) AS/NZS 1170.1;
                                         (iii) AS/NZS 1170.2;
                                         (iv) AS 1170.4;
                                         (v) AS 3962;

Section 67

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         (vi) AS 4997;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
18.2 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.      The Project is not a pontoon
pontoon and used only for                The design and construction of the   Not a pontoon.       therefore PO18.2 is not applicable.
rowing are designed and                  pontoon is consistent with the
constructed in a way to ensure—          following standards—
(a) the pontoon is able to               (a) subject to paragraph (b)—
support its intended loads,              (i) for a pontoon
having regard to its relevant            constructed within a
loading matters; and                     marina—AS 3962 to the
(b) the pontoon is safe for              extent requirements
persons using the pontoon                stated in the Standard
to launch and retrieve                   apply to relevant loading
rowing vessels.                          matters for the design or
                                         construction of the
                                         pontoon; or
                                         (ii) for a pontoon not
                                         constructed within a
                                         marina—
                                         (A) the access walkway
                                         of a pontoon used
                                         only for rowing is
                                         able to support at
                                         least a live load of

Section 68

Performance outcome   Acceptable outcome                  Applicant response   Assessment
                      3.0kPa; and
                      (B) the flotation unit of
                      a pontoon used
                      only for rowing is
                      able to support at
                      least a live load of
                      1.5kPa; and
                      (C) at least 75mm of
                      the height of the
                      pontoon’s flotation
                      unit will remain
                      above the surface
                      of the water over
                      which it is
                      constructed if a
                      distributed live load
                      is applied to half of
                      the surface of the
                      pontoon’s flotation
                      unit and all of the
                      surface of the
                      pontoon’s access
                      walkway;
                      (b) if a relevant planning scheme
                      standard is more stringent
                      than the standard mentioned
                      in paragraph (a)—the
                      relevant planning scheme
                      standard, to the extent it is
                      more stringent than the
                      standard mentioned in
                      paragraph (a).

Section 69

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
18.3 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.      The Project is not a pontoon
pontoon are designed and                 The design and construction of the   Not a pontoon.       therefore PO18.3 is not applicable.
constructed in a way to ensure           pontoon is consistent with the
any load applied to the pontoon          following standards—
by a person or thing on the              (a) subject to paragraph (b)—
pontoon does not cause the               (i) for a pontoon
pontoon to tip over or tilt to a         constructed within a
degree causing the person or             marina—AS 3962 to the
thing to fall off the pontoon.           extent requirements
                                         stated in the Standard
                                         apply to relevant loading
                                         matters for the design or
                                         construction of the
                                         pontoon; or
                                         (ii) for a pontoon not
                                         constructed within a
                                         marina—
                                         (A) the pontoon’s
                                         access walkway
                                         extends at least
                                         500mm onto the
                                         pontoon’s flotation
                                         unit; and
                                         (B) for a pontoon used
                                         only for
                                         rowing—at least
                                         75mm of the height
                                         of the pontoon’s
                                         flotation unit
                                         remains above the
                                         water over which it
                                         is constructed if a

Section 70

Performance outcome   Acceptable outcome        Applicant response   Assessment
                      distributed live load
                      is applied to half of
                      the surface of the
                      pontoon’s flotation
                      unit and all of the
                      surface of the
                      pontoon’s access
                      walkways; and
                      (C) for a pontoon other
                      than a pontoon
                      mentioned in
                      sub-subparagraph
                      (B)—the top
                      surface of the
                      pontoon’s flotation
                      unit remains above
                      the water over
                      which it is
                      constructed if a
                      distributed live load
                      of 1.5kPa is applied
                      to half of the
                      surface of the
                      pontoon’s flotation
                      unit and all of the
                      surface of the
                      pontoon’s access
                      walkways; and
                      (D) the whole base of
                      the pontoon’s
                      flotation unit
                      remains in contact

Section 71

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         with the water over
                                         which it is
                                         constructed at all
                                         times and tilts no
                                         more than 15º at
                                         any time;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
18.4 Prescribed tidal works that are a   The design and construction of the   Not applicable.      The Project is not a pontoon
pontoon are designed and                 pontoon is consistent with the       Not a pontoon.       therefore PO18.4 is not applicable.
constructed in a way to ensure           following standards—
the pontoon’s flotation unit             (a) subject to paragraph (c), the
will—                                    pontoon’s flotation unit is—
(a) rise and fall to allow for a         (i) attached, through the
change in tidal water levels,            pontoon’s system for
including a change caused                mooring the unit, to
by a flood or storm tide;                concrete anchors in the
and                                      bank landward of the
(b) not be separated from the            pontoon; or
lot to which the pontoon is              (ii) moored by piles;
connected because of—                    (b) subject to paragraph (c), if a
(i) a change in tidal water              tidal water level change
levels mentioned in                      resulting from a flood or
paragraph (a); or                        storm tide with an AEP of 1%
(ii) the flow of tidal water             would cause a pontoon’s

Section 72

Performance outcome                      Acceptable outcome                    Applicant response   Assessment
around the pontoon,                      flotation unit to detach from
including tidal water                    the system for mooring the
affected by a flood or                   unit—
storm tide.                              (i) the standard applying
                                         under paragraph (a); and
                                         (ii) the pontoon’s flotation
                                         unit is restrained with a
                                         tethering system so that
                                         it can withstand the
                                         effects of the event;
                                         (c) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a) or (b)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a) or (b).
18.5 Prescribed tidal works that are a   The design and construction of the    Not applicable.      The Project is not a pontoon
pontoon identifies the lot to            pontoon is consistent with the        Not a pontoon.       therefore PO18.5 is not applicable.
which the pontoon is connected.          following standards—
                                         (a) a label that identifies the lot
                                         to which the pontoon is
                                         connected is written or
                                         stamped on, or fixed to, the
                                         outside of the pontoon’s
                                         flotation unit;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the

Section 73

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
18.6 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.      The Project is not a pontoon
pontoon permanently used for             The design and construction of the   Not a pontoon.       therefore PO18.6 is not applicable.
the fuelling of, or the storage of       pontoon is consistent with the
fuel for, vessels are designed and       following standards—
constructed in a way to ensure—          (a) subject to paragraph (c), each
(a) the pontoon is able to               of the following Australian
support its intended loads,              Standards to the extent
having regard to its relevant            requirements stated in the
loading matters; and                     Standard apply to relevant
(b) the pontoon is safe for              loading matters for the design
persons using the pontoon.               or construction of the
                                         pontoon—
                                         (i) AS/NZS 1170.0;
                                         (ii) AS/NZS 1170.1;
                                         (iii) AS/NZS 1170.2;
                                         (iv) AS 1170.4;
                                         (v) AS 4997;
                                         (b) subject to paragraph (c),
                                         AS 3962 to the extent
                                         requirements stated in the
                                         Standard apply to a pontoon
                                         permanently used for the
                                         fuelling of, or the storage of
                                         fuel;
                                         (c) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned

Section 74

Performance outcome                     Acceptable outcome                   Applicant response               Assessment
                                        in paragraph (a) or (b)—the
                                        relevant planning scheme
                                        standard, to the extent it is
                                        more stringent than the
                                        standard mentioned in
                                        paragraph (a) or (b).
Design, construction and safety—revetments and seawalls
19.1 Prescribed tidal works that are a  (s 5(2) outcome)                     Not applicable.                  The Project is not a revetment or
revetment or seawall, are               The design and construction of the   Not a revetment or               seawall therefore PO19.1 is not
designed and constructed in a           revetment or seawall is consistent   seawall.                         applicable. However as detailed, the
way to ensure the revetment or          with the following standards—        Despite this, it is noted that   Project has considered the rock size
seawall is able to support its          (a) subject to paragraph (c), each   the rock size for the reef       for the reef substrate to be stable for
intended loads, having regard to        of the following Australian          substrate has been               intended loads including wave and
its relevant loading matters and        Standards to the extent              selected to be stable for        current conditions.
its intended design life.               requirements stated in the           the intended loads
                                        Standard apply to relevant           including wave and current
                                        loading matters for the design       conditions anticipated at
                                        or construction of the               the site for a 50 year ARI
                                        revetment or seawall—                event.
                                        (i) AS/NZS 1170.0;
                                        (ii) AS/NZS 1170.1;
                                        (iii) AS/NZS 1170.2;
                                        (iv) AS 1170.4;
                                        (v) AS 4997;
                                        (b) subject to paragraph (c),
                                        AS 4678 to the extent
                                        requirements stated in the
                                        Standard apply to
                                        earth-retaining structures;
                                        (c) if a relevant planning scheme
                                        standard is more stringent
                                        than the standard mentioned

Section 75

Performance outcome                      Acceptable outcome                   Applicant response               Assessment
                                         in paragraph (a) or (b)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a) or (b).
19.2 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.                  The Project is not a revetment or
revetment or seawall, are                The design and construction of the   Not a revetment or               seawall therefore PO19.2 is not
designed and constructed in a            revetment or seawall is consistent   seawall.                         applicable.
way to ensure the revetment or           with the following standards—        Despite this, it is noted that
seawall can withstand—                   (a) subject to paragraph (d), a      a) as a flexible rock
(a) any tendency of                      revetment or seawall is able         structure, failure modes do
overturning or sliding; and              to withstand the effect of           not include overturning or
(b) any other effects of waves           waves, or a combination of           turning
or changes in water levels               waves and water levels,              b) the structure has been
on the revetment or                      resulting from a storm event         designed in a way that it
seawall.                                 with an AEP of 2%, factoring         can withstand the effects
                                         in projected sea level rise;         of waves and water levels.
                                         (b) subject to paragraph (d), each
                                         of the following Australian
                                         Standards to the extent
                                         requirements stated in the
                                         Standard apply to relevant
                                         loading matters for the design
                                         or construction of the
                                         revetment or seawall—
                                         (i) AS/NZS 1170.0;
                                         (ii) AS/NZS 1170.1;
                                         (iii) AS/NZS 1170.2;
                                         (iv) AS 1170.4;
                                         (v) AS 4997
                                         (c) subject to paragraph (d),

Section 76

Performance outcome                      Acceptable outcome                   Applicant response               Assessment
                                         AS 4678 to the extent
                                         requirements stated in the
                                         Standard apply to
                                         earth-retaining structures;
                                         (d) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a), (b) or
                                         (c)—the relevant planning
                                         scheme standard, to the
                                         extent it is more stringent
                                         than the standard mentioned
                                         in paragraph (a), (b) or (c).
19.3 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.                  The Project is not a revetment or
revetment or seawall are                 The design and construction of the   Not a revetment or               seawall therefore PO19.3 is not
designed and constructed to              revetment or seawall is consistent   seawall.                         applicable.
protect the revetment or seawall         with the following standards—        Despite this, it is noted that
from erosion at the base of the          (a) subject to paragraph (d), a      the rock structure is
revetment or seawall.                    revetment or seawall provides        expected to experience
                                         for a sub-layer or enough            some slumping over time
                                         filter material to prevent           with subsequent top-up in
                                         erosion of the land under the        response to monitoring.
                                         revetment or seawall;                This is to avoid the use of
                                         (b) subject to paragraph (d), the    geotextiles or scour aprons
                                         bottom edge of the base of a         which would restrict access
                                         revetment or seawall will            between individual reef
                                         withstand undermining by             patches for the purposes of
                                         scour;                               monitoring. Refer ICM
                                         (c) subject to paragraph (d),        Drawing NROR-2021-00
                                         AS 2758 to the extent                Note 4.
                                         requirements stated in the
                                         Standard apply to the sizing

Section 77

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         and grading of filter layers
                                         and armour materials;
                                         (d) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a), (b) or
                                         (c)—the relevant planning
                                         scheme standard, to the
                                         extent it is more stringent
                                         than the standard mentioned
                                         in paragraph (a), (b) or (c).
19.4 Prescribed tidal works that are a   The design and construction of the   Not applicable.      The Project is not a revetment or
revetment or seawall are not             revetment or seawall is consistent   Not a revetment or   seawall therefore PO19.4 is not
adversely affected by                    with the following standards—        seawall.             applicable.
hydrostatic pressure.                    (a) subject to paragraph (b),
                                         AS 4678 to the extent
                                         requirements stated in the
                                         Standard apply to hydrostatic
                                         pressure for earth-retaining
                                         structures;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
Design, construction and safety—wharves
20.1 Prescribed tidal works that are a  (s 5(2) outcome)                      Not applicable.      The Project is not a wharf therefore
wharf are designed and                  The design and construction of the    Not a wharf.         PO20.1 is not applicable.

Section 78

Performance outcome                 Acceptable outcome                  Applicant response   Assessment
constructed in a way to ensure it   wharf is consistent with the
is able to support its intended     following standards—
loads, having regard to its         (a) subject to paragraph (b)—
relevant loading matters.           (i) for a wharf constructed
                                    within a
                                    marina—AS 3962 to the
                                    extent requirements
                                    stated in the Standard
                                    apply to relevant loading
                                    matters for the design or
                                    construction of the
                                    wharf; or
                                    (ii) for a wharf not
                                    constructed within a
                                    marina—each of the
                                    following Australian
                                    Standards to the extent
                                    requirements stated in
                                    the Standard apply to
                                    relevant loading matters
                                    for the design or
                                    construction of the
                                    wharf—
                                    (A) AS/NZS 1170.0;
                                    (B) AS/NZS 1170.1;
                                    (C) AS/NZS 1170.2;
                                    (D) AS 1170.4;
                                    (E) AS 4997;
                                    (b) if a relevant planning scheme
                                    standard is more stringent
                                    than the standard mentioned
                                    in paragraph (a)—the

Section 79

Performance outcome   Acceptable outcome              Applicant response   Assessment
                      relevant planning scheme
                      standard, to the extent it is
                      more stringent than the
                      standard mentioned in
                      paragraph (a).

Section 80

marine approval specialists

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.