2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                metres from a revetment
                                                wall;
                                            (c) the ramp is constructed at a
                                                uniform grade no steeper
                                                than 20% (1 in 5); and
                                            (d) the outer end of the ramp is
                                                no more than 100
                                                millimetres above the level
                                                of the beach (Refer Figure
                                                9.4.9.3E).

                                        AO14.2
                                        No part of the ramp is to extend
                                        closer than 1 metre to the
                                        prolongation of the boundaries.

                                        AO14.3
                                        The boat ramp surface profile is
                                        concave to allow concentration of
                                        water to the centre of the ramp.
PO15                                    No acceptable outcome provided.      The applicant has not specifically   The Project does not include
No new boat ramps are constructed                                            addressed the Waterways works        boat ramps therefore PO15 is
within the Noosa River system.                                               code.                                not applicable.
Character and amenity - operational works within Noosa Waters Estate waterways
PO16                                     AO16.1                              The applicant has not specifically   The Project is not within the
Works are designed and sited to          For lots with watercourse frontage  addressed the Waterways works        Noosa Waters Estate waterways
ensure—                                  greater than 15 metres in width,    code.                                therefore PO16 is not
    (a) they are contained within the    jetties are setback a minimum of 3                                       applicable.
        prolongation of boundaries of    metres from the prolongation of the
        the lot;                         boundaries (Refer Figure 9.4.9.3A).
    (b) that when a vessel is berthed it
        does not encroach over the       AO16.2
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.