Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PO21                                      AO21.1                                    The applicant has not specifically   The Project is not within the
Boat lifting devices are only             Boat lifting devices are only located     addressed the Waterways works        Noosa Waters Estate waterways
constructed in the absence of a boat      in conjunction with an approved           code.                                therefore PO21 is not
ramp and are designed and located         jetty where—                                                                   applicable.
to—                                            (a) the boat lifting device does
   (a) ensure that unacceptable risks              not extend into the
         to personal and public safety             waterway beyond the end of
         are unlikely to be caused;                the approved jetty;
   (b) avoid cluttering of the                 (b) the boat lifting device is no
         waterway;                                 greater than 4 metres in
   (c) ensure that visual amenity of               width or for a jetty hoist, 2
         the foreshore and waterway is             metres in width;
         maintained including—                 (c) the boat lifting device is
   - avoiding bulky or large                       located adjacent the
         structures; and                           walkway to the jetty and is
   - minimising structures above                   generally perpendicular to
         the water level;                          the revetment wall;
   (d) ensure the structural integrity         (d) the highest part of the boat
         of the works is maintained and            lifting device is no higher
         not compromised; and                      than the top of the
   (e) avoid a secondary boat lifting              revetment wall under
         device (floating dock) that               normal canal water level
         exceeds 8m².                              conditions;
                                               (e) the boat lifting device is not
                                                   located on the jetty head;
                                                   and
                                               (f) the outermost projection of
                                                   any boatlifting device is
                                                   setback a minimum of 1
                                                   metre from the prolongation
                                                   of the boundaries.

                                          AO21.2
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.