Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
5.0 Recommendations The Project has been assessed as compliant with all relevant Codes of the Noosa Plan 2020 and the Coastal Protection and Management Regulation 2017. The application material includes a range of environmental management and monitoring commitments, primarily documented in the Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan. These measures should be consolidated in a Construction Environmental Management Plan (CEMP). We note that this has not been conditioned by referral agencies. We recommend that Noosa Council includes an Assessment Manager condition to capture this requirement. It is therefore recommended that the Project be approved subject to the Referral Agency Conditions provided by SARA on 7 April 2022 and the Conditions provided in Appendix 1.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.