Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

5.0 Recommendations
The Project has been assessed as compliant with all relevant Codes of the Noosa Plan 2020 and the
Coastal Protection and Management Regulation 2017.

The application material includes a range of environmental management and monitoring
commitments, primarily documented in the Noosa Oyster Ecosystem Restoration Project - Project
Restoration Plan. These measures should be consolidated in a Construction Environmental
Management Plan (CEMP). We note that this has not been conditioned by referral agencies. We
recommend that Noosa Council includes an Assessment Manager condition to capture this
requirement.

It is therefore recommended that the Project be approved subject to the Referral Agency Conditions
provided by SARA on 7 April 2022 and the Conditions provided in Appendix 1.
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.