Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
and grading of filter layers
and armour materials;
(d) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a), (b) or
(c)—the relevant planning
scheme standard, to the
extent it is more stringent
than the standard mentioned
in paragraph (a), (b) or (c).
19.4 Prescribed tidal works that are a The design and construction of the Not applicable. The Project is not a revetment or
revetment or seawall are not revetment or seawall is consistent Not a revetment or seawall therefore PO19.4 is not
adversely affected by with the following standards— seawall. applicable.
hydrostatic pressure. (a) subject to paragraph (b),
AS 4678 to the extent
requirements stated in the
Standard apply to hydrostatic
pressure for earth-retaining
structures;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
Design, construction and safety—wharves
20.1 Prescribed tidal works that are a (s 5(2) outcome) Not applicable. The Project is not a wharf therefore
wharf are designed and The design and construction of the Not a wharf. PO20.1 is not applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.