Skip to the record
Every meeting, every word.

Council archive · source document

07/1255 - Lot Recofiguration - 2 Lots [As Published] · 152007.1255

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

a

 

Max Watterson & Associates /

Consulting Surveyors & Development Consultants

 

 

 

ABN 59 847 644 252 (formerly Clement, Reid & Watterson)
REFERS

 

 

10 Maple Street,
(RO. Box 639) COOROY 4663

Ph: (07) 5442 6121 REFERS:
Fax: (07) 5442 5125

PRINCIPAL

MAXWELL L . WATTERSON Cadastral! Surveyor (Qld)
B, Surv (UNSW), M.1.S.Aust.

 

 

 

Email: [email protected]

28" June, 2007
Ref: 06/2271

 

The Chief Executive Officer
Noosa Council
P.O. Box 141

@ TEWANTIN Q 4565

Dear Sir/Madam,

Re: Development Application for Reconfiguration of a Lot
Lot 1 on SP161880 - 16 Armitage Court, Noosaville

Applicants: S.J. & T.A.E. Nelson.

Please find herewith an application for a Development Permit to reconfigure the
boundaries of the above properties including:

1. IDAS Development Application Forms: Parts A & F and IDAS Assessment
Checklist.

2. A cheque for $2,450.00, made payable to Noosa Council; being the
application fees.

3. Six copies of a Planning Report including the Plan of Development (Ref:

@ 06/2271C).
Yours faithfully

Gi

ax Watterson

y
Full text of the other 32 pages

Page 2

Part A, Version 2.4, 29 May 2006

 

 

The completion of all applicable questions on Part A is mandatory for ail applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of jand 1. Street address: fnoludinghouse number, street name, suburb/locality name & postcode) {if applicable)
All land the subject of the apptication, must be f ‘
identified. However, a description of the land fs not [16 Armitage Close, Noosaville Qld 4566r |
Ennely lever Act (ERA) 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - Q2 applies if | ]
development is proposed within a water body or —— 7
watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be
identified by a lol on plan description. These details [ Lot 1 on SP161880. |
ined from titt ts or through Ter
mane Lom tte documents rtwoush te) 4 “The above description is for (tick applicable box)
However, if the land on which the development is (J (i) the land on which the development is proposed; or
the devebpmestis proposed vs wat booror (21 (ii) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide ~ proposed; or
i) the I pti ae
Oe ieeaivean an ne (J (ili) the water body or watercourse.
ii) GPS coordinates whera there is no
{ii Sonera wner me o eaton Bay) 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m: or ha): Suv.
Advice for completing Q7 - Q7 does not apply if the “FO¥Bsq.m. V2
development is within a water body or watercourse, | | g.m. 18 Sqm
Advice for completing 08 - 08 applies if i it is si q
developments wihina local government area. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo ete, (if applicable)
Note: Areas below high water mark are not within a | Noosa Shire Council |
focal government's area unless provided for under the
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - Q9 applies if i + ites) {i H
developments on strategic por land ora strategic is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable) +
port land tidal area. For more detaits refer to Guide 11
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
Hociednanstahsenoneaeeas | Dwelling house ]
11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ay

ponds with a {otal area of 7 ha for which wastes are released into waters etc).

{ 2 lot residential subdivision. |
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part /, etc)
Part A must always be accompanied by other i
Ce ou | Parts F and IDAS Assessment Checklist |
when a part of Form 1 may apply refer to Guide 4,
Applicant details 8, Applicant's name: 15, Contact person:
Clearly identify who is making the apptication. The ve
option naed got be the over ofike land 7 | Bw. & T.AE. Nelson [ Max Watterson
When signing and Jodging this application 14. Contact number: 16. Facsimile number/e-mail address:

The applicant is responsible for ensuring the
information provided is correct. The assessment
Manager, any referral agency & the Chief Executive
(where applicable) will rety on this information when
assessing and deciding the application.

If the applicant is a company - a contact parson
must be shown.

 

17.

18.

 

5442 5125
[email protected]

5442 6121

Postal address:
| PO Box 639, COOROY Q 4563

Signature: 19. Date: ; |

S. Nikeon oT e@ £eT.

 

 

 

 

 

 

 

 

 

Page 3

ea

2

INTEGRATED PLANNING ACT 1997

Land owner’s consent {if appiicable)

Section 3.2,1(3} of the IPA prescribes that an
application must contain, or be supported by, the
writtgn consent of the land owners, if the application
involves:

® amiateriat change of use;

Gi) reconfiguration of a lot;

Gi) work on land below high-water mark & not within a
canal as defined under the Coastat Protection and
Management Act 1995;0r

{iv) work on rail corridor land defined under the
Transport Infrastructure Act 1994.

Section 3.8.1(2)(a) of the IPA provides that

landowner's consent is not required for a mobile or

temporary ERA.

For more information refer to Guide 1.

 

20.

Part A, Version 2.4, 23 May 2006
Land owner's consent to the making of this application:
Name

 

Signature

 

(i) Stephen John Nelson

(i) | Tracey Anne Elizabeth Nelson

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

resource entittement be given for applications that ~~

involve a prescribed State resource, NO - go to Q24 oO YES - go to Q22

Section 3.2.1(10\a}(i) of the {PA prescribes that . ae . .

application LAO KAKR of te be pope aie, | 22. This application is accompanied by evidence: (lick eppficable box)

wou erence ole resource enitement C1 (i) of the allocation of, or entitlement to, the resource — attach evidence and go to Q23(vi)
Refer to schedule 10 of the Integrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence i i: i ji i _
Teired ty tha State euprt ef he fogging of Be development is consistent with an allocation of, or entitlement to, the resource - go
development application. t0.Q23 . . a . .

O iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23

Advice for completing Q23 23. Evidence of the resource entitlement:

The information in (i) - (v} is mandatory if evidence is ‘ . . . a A

required under 022 (i) or (i) above, (i) Resource entitlement / authority details (vii) Official oan the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the _ applicable)

application involves any water or riverine quarry (ii) Name of delegated officer

Section 3.2.1(5A) allows the resource manager to limit

the time the evidence may be used. Q23 (vi) must be "ii iti

completed if the evidence Is time limited. (il) Position of delegated officer

{iv) Signature of delegated officer

(v) Date

(vi) ee date of evidence Coe

Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?

This checklist does not apply if the application requires 5 bnpt

tne completion of Pats A and Bof the Form only. It J Yes [INO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made

Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potential impact.

 

 

 

 

Plan / Drawing / Report Number Title Date
Plan of Proposed
{i) 07/2271C& Reconfiguration of Lot 1 on 24/07/06
SP161880.
(ii)
(iii)
(iv)

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement. fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (applicable to assessment manager's}

DATE

FEE ($) RECEIVED

REFERENCE

RECEIVING OFFICER'S |
NUMBERS

NAME/S

lor [eeS_|

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Notification of Engagement of Private Certifier (Optional format)
To. Council. ! have been engaged as the private certifier for the building work referred to in this application.

 

Date ofengagement / / Accreditation Number. _.. Name: Signature:

 

Page 5

    

Reconfiguring alot | —

Part F, Version 2.0, 4 October 2004

S

   

oan

 

 

 

Completion of all applicable questions on Part F is mandatory for all applications involving the reconfiguring of a lot (including freehold subdivision, community

title subdivision, subdivision by lease, etc.).

 

 

Nature of the application

A development permit authorises development
fo occur, white a preliminary approval is a step

in the approval process and does not

1. This application is for: (tick one (1) or both if applicable)

XX] Development permit - provide details below eg. stage 1: freehold subdivision of 25 lots, realignment of a
boundary, creation of an access easement)

 

 

 

 

 

 

authorise development to occur. [ Subdivision to create 2 lots
AND/OR
oO Preliminary approval -provide details below eg. stages 2, 3 and 4: freehold subdivision of 75 lots,
realignment of a boundary, creation of an access easement)
The subject tand

The information requested in Q2 & 3 Is
necessary for statistical and planning
purposes.

The proposal

The information requested in Q10-13 is
necessary for statistical and planning
purposes.

=<

2. Number of existing lots: [4 |

 

3. J Total area of land in application: (if staged, total area of the land in this stage)
7 team IZTS sgn,
4

How the subject land is identified in the planning scheme: (name the zone, precinct etc.)
| Detached Housing Zone |

5. Current use of the land: (if vacant, also identify the previous use)
| Dwelling house |

6. Are there buildings or structures existing on the land?

CI No
EX] YES - complete Q7
7, Indicate which one of the following circumstances applies:
(J All existing buildings and structures on the land will be demolished as part of the
development / redevelopment of the site; or

EX] Some existing buildings and structures on the land are proposed to be retained as part of

the development / redevelopment of the site - indicate on the plans prepared in response to Question
6 above, those buildings or structures proposed to be retained

2

Existing services on the land:{eg. water & sewerage) - attach plan identifying location if appropriate)
| Water, sewerage, power & telephone.

9. Are there any existing easements over the land?
ime)

[KX YES - attach plan identifying easement location & purpose

10. Total area of land in the development permit minus any balance area
Yeas. 1273 SGA. |
fe

11. Number of proposed lots: [ 2 |

 

 

12. Number of additional residential lots proposed in development permit: (if applicable)

 

Li

Page 6

a «

INTEGRATED PLANNING ACT 1997 Part F, Version 2.0, 4 October 2004
13. Estate name & stage number: {applicable if the application is for a stage or stages of an overall subdivision
proposal)

14. Area of land to be contributed for community purposes: (if applicable)
[ nil

15. Length of new road to be constructed: (if applicable)
[ nil ]

 

 

 

PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

 

 

OFFICE USE ONLY (applicable to assessment manager)
REFERENCE
@ DATE RECEIVED NUMBERIS

 

 

 

 

 

Page 7

 
 

INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 20, 2 April 2007

 
  

 

Ss ST

 

 
 

eee

Assessment
Checklist

(Formerly the “Referrals Checklist”)

 

      

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1.

2.

PN OaAS

10.

oe

This checklist was formerly referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities {e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

This checklist is provided to assist applicants to determine when an application requires assessment by a Queenstand State entity and may also assist the applicant to
determine the assessment manager’ for the application.

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
{tis the responsibility of the applicant to accurately complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify

any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination2.

To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qKd.gov.au. Guide 25 explains the role of the DAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from

www. ipa.qid.gov.au.

Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4.

 

(i) an environmentally relevant activity (ERA) for which a code for environmental compliance

Unless you answered ‘none of the above" to Q1, has not been made - complete Part G of Form 1
the application requires assessment by the a ~~. : . .
administering authority2, CI (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering Made - complete Part G of Form 1
@ authority, is the assessment manager for the 1 (iii) none of the above

application, the administering authority is a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager)

 

DATE RECEIVED REFERENCE NUMBER/S l

 

1 The assessment manager is responsible for assessing and deciding an [DAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’

3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant locat government (for a devolved ERA) or the Queenstand Department of Primary industries and
Fisheries {for a delegated ERA}.

Page 1

Page 8

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

State-controlled road matters 2. The application involves: (tick applicable box/es)
For more information refer to Guide 3. C1 (i) development on land contiguous* to a State controlled road and for -
Unless you answered “none of the above” to Q2, . . .
the application triggers referral to the Department! OO (a) material change of use assessable against the planning scheme;
pian Roads (DMR) as a referral agency. (1 (b) reconfiguring a fot unless -
soe i Fer coortones DMR wi « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2 of the 1P Regulation will assist you to ‘ . , . .
determine where DMR ae -atvice or Oo operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)—
* associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controfled road.
C1 (ii) development on land not contiguous to a State-controlled road and -
C1 (a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
1 (ili) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. C1 (i)_ material change of use —
Unless you answered “none of the above" to Q3, - -
the appveation requires assessment by the (a) assessable against the planning scheme;
a Matra Resources and Water (b) on alot containing -
ifan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa « if there is no property map of assessable vegetation for the lot - remnant vegetation;
GancurTence agency forthe application in relation (c) where the existing use of the land is a rural or environmental use; and
tf you ticked Q3() oF (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of O (ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. oe
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Di (ii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form?
(iv) none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.

if you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

if you ticked (ji) Queensland Transport is a
concurrence agency for the application.

 

C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1

D (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1

1X (iii) none of the above

 

4 Land contiguous to a State-contolled road is defined in schedule 14 of ihe 1P Regulation to mean land - if part of the land is within 100m of the State-contro!led road; or that is part of a future State-

controlled road.

Page 2

Page 9

“

INTEGRATED PLANNING ACT 1997

Acid sulfate soils 5.

Fer more information refer to Guide 10.

Unless you answered “none of the above” to Q5,
the application requires assessment by
Department of Natural Resources and Water
(NRW).

{fan agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this,
matter,

IDAS Assessment Checklist, Version 20, 2 April 2007
The appfication involves development on land situated in an identified local government area
and where the surface of the land is: (tick applicable box)
(i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or

LO (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material

X (iii) none of the above

 

Major hazard facilities or possible 6.

major hazard facilities

For more information refer to Guide 17.

Ifyou answered "YES" to Q6, the application
fequires assessment by the Department of
Emergency Services (DES).

If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

—XJNO

(CI YES - complete Part L of Form 1

 

Water related development under the | 7.

Water Act 2000

For more information about items (a) - (f), refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my appiication
involve assessment of a referable dam?

Unless you answered “none of the above" to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW),

fan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

The application involves:
(1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:

(tick applicable box/es)
(a) ina watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, K3, Ks, Ke, or Ko of Form 1 whichever is applicable;
(1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ks of Form 1;
(1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
USe - complete Part K; of Form 1;
LC (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ks of Form 1;
C1 (e) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ks of Form 1;
(1 (f) for interfering with overiand flow water in a drainage and embankment area -
complete Part Kioof Form 1
(1 (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF
1 (ii) none of the above.

 

 

Removal of quarry material from a 8.

watercourse
For mare information refer to Guide 16.

if you answered “YES” to Q8, the application
Tequires assessment by the Department of
Natural Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
felation to this matter.

Noto: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

INO

(1) YES - comptete Parts Kr and G of Form 1

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Coolocla, Doungtas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, tsis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).

wu

Referabie dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the PA.

The declared ground water areas are listed in Guide 13 Development in a declared catehment area.

Page 3

Page 10

INTEGRATED PLANNING ACT 1997

Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Unless you answered “none of the above” to. Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).

(fan agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.

Local government is the assessment manager
for all prescribed tidal work.

Operational work below high water
mark

For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered “none of the above" to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency.

Local government is the assessment manager
for all prescribed tidal work.

 

9.

IDAS Assessment Checklist, Version 20, 2 April 2007

The application involves operational work that is: ( tick the applicable boxes)

Ow

OF
D iii

fl tiv)

tidal work*® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF

tidal work that is prescribed tidal work"! other than in a canal'2 -comptete Part P of Form 1; oF

carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any boxes (a) to (i) below are ticked.

(2) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) Where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal'2 intended to be connected to tidal waters;

constructing an artificial waterway;

reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;

draining or allowing drainage or flow of water or other matter across State
coastat land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wail to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

none of the above.

Db)
Ow
O@
Ole)
Of
O@

CO (h)
DV

10. The application involves operational work that is: ( tick the applicable box/es)

Di
Dit)

tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

tidal work that is prescribed tidal work" - complete Part P of Form 1; or

(iii) carried out within a coastal management district's under the Coastal Act and for -

Riv)

Of

disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;

teclaiming land under tidal water - complete Part M of Form 1; or

constructing a canal'2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

none of the above.

 

Coastal management

For more Information refer to Guide 18.

Untess you answered “none of the above” to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

Hf an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
felation to this matter.

 

 

41.

The application involves: (tick the applicable box/es)

Ot
Oi)

C1 iii)
Ow
Ww)

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district's

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?

reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? - complete Part M of Form 1

none of the above

 

10. Tidai work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works compietely of partly within a tocal government tidal area.
12 Canal means canal as defined under the Coastai Protection and Management Act 1995

13 Tidal work is defined In sch 10 of the IPA.

14 Prescribed tidal work Is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely of partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coasta/ Protection and Management Act 1995, other than an area dectared as a
coastal management district under section 47(2) of that Act.

16 GFAis defined in sch 14 of the [PA to mean the gross floor area. For a definition of how to calculated GFA. go to the planning scheme against which the application is being assessed.

17 Under 8117 of the Coastaf Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 11

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

If you answered "YES" to 012, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

* within 200m of a shipping channel or an entry
and exit shipping corridor for the port

* within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage ar spoil
grounds;

© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.

in ail other situation the Port Authority is an

advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?

NO
(DYES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For mora information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24, The local
govemment is the assessment manager for afl
prescribed tidal work,

ff you answered “YES” to Q13, the application
triggers referrat to Queensland Fire and Rescue
Service as an advice agency.

13.

Does the application involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?

NO

(11 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidal works in strategic port land tidal
areas
For more information refer to Guide 18.

Unless you answered "NO" to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.

Heritage
For further information refer to Guide 19.

Hf you answered "YES" to Q15, the application
triggers referral to the Queensland Heritage

Council as concurrence agency for the
application.

 

Unless you answered "none of the above” to
Q15(b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

=

15.

4,

Does the application involve tidal works within a strategic port land tidal area2°?
— NO

(11 YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

EJ NO

(71 YES - complete Part C of Form 4

15(b)The application involves: (tick applicable boxes)

LI () ~~ a material change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

{1 (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;

(ii) none of the above.

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

(fan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

C1 (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994,
LX (i) none of the above

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Polfution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port tand.

Page 5

Page 12

a

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

Applications involving development on land
designated for community infrastructure may
trigger this referral.

For more information refer to schedule 2 of the
iP Regutation.

If you answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.

lf an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
Matter.

 

Contaminated tand 17. The application involves: (tick the applicable box/es}

Anphcations involving maton change ats use (1) reconfiguring a lot for which all of part of the premises are -

refer. suring a lot may Weg (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -

For more information refer to Guide 5. « item §, including the exemption otherwise provided for by paragraph (d);

Untess you answered “none of the above” to « item 6, including the exemption otherwise provided for by paragraph (e); or

Q17, the application requires assessment by the * item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). if an activity; or

agency other than EPA is the assessment . , . . .

Manager for the application, EPA will be a {b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in ordnance - complete Part N of Form 1

telation to this matter. se .

O (ii) a material change of use —

(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or

(b) assessable against the planning scheme and if all or part of the premises is in an area

for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
KI (iil) none of the above
Electricity Infrastructure 18. The application involves: (tick the applicable box/es)
re mare information refer to schedule 2of the IP (C1 (i) reconfiguring a fot where any part of the lot is -
yess you answered ‘none of the above" to subject to an easement in favour of a distribution entity or transmission entity under the
ais, the apptcaton triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
jency to which the easements granted in that Act; or
@ favour of as advice agency. « situated within 100m of a substation site;

CI (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if —

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

Ci (iil) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

C1 (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

» the work is located wholly or partly within 10m of a substation site;

XX] (v)_ none of the above.

Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure

designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development —

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
NO
OD Yes

 

Page 6

Page 13

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For more information refer to schedule 2 of the
IP Reguiation,

Refer to Chapter 2, part 5A and schedute 10 of
the Integrated Ptanning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered ‘none of the above” to
020, the application requires assessment by the
Office of Urban Management (OUM).

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
(C1 i) amaterial change of use of premises -
(a) ina Major Development Area in the Urban Footprint for -
OO @)  anurban activity -
(1 inan area included in a structure plan where the IPA, section 3.1.6
applies;
C1 inan area not included in a structure plan where -

« the IPA, section 3.1.6 applies to the application for the material change
of use; or

« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
+ impact assessment is required under the relevant planning scheme
U (ii) intensive animal husbandry, or
LC) (iii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
OO (i) anurban activity and not specified in section 2.4(2); or
OO (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for —
1 (i) anurban activity and not specified in section 2.10(2);

OQ (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
OO (ii) intensive animal husbandry

LO (ii) reconfiguring a tot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
{b) not specified in section 3.1(2).
EX] (iii) none of the above

 

Fisheries matters

For more information refer to schedule 2of the IP
Requiation.

Untess you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary Industies and Fisheries
(OPIaF).

Han agency other than OPI8F is the assessment,
manager for the application, DPI&F is a
concurrence agency for the application in
relation to items (i) ~ (tv) and an advice agency
in relation to item (v).

 

21. The application involves: (tick the applicable boxes)
C(i) an assessable material change of use for aquaculture - complete Part 0; of Form 1;

C1 (ii)_ assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
Diiii

assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

(J (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

[J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a

declared fish habitat area;

Xl (vi) none of the above.

Page 7

Page 14

INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the {P Requiation.
Untess you answered “none of the above", the
application triggers referral to QT as a
concurrence agency.

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

CI (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that

schedule.
C1 (ii) reconfiguring a fot—

C1 (a) ontand that is completely or partly within a public transport corridor, and the
total number of lots increases;

(J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

[J (©) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m2 or greater;

(1 (a) _ for aresidentiat purpose within the 25 ANEF contour for an airport;

C1 (e) _ for a residential purpose resulting in 100 or more allotments.

OO (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

Ca) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(1 (b) will result in work that encroaches into an airport's operational airspace.

BX (iv) none of the above.

 

 

Railway safety and efficiency 23, The application involves: (tick the applicable box/es)—
For more informaton ote fo Guia 28, senefule C (i) a material change of use assessable against the planning scheme for a purpose
— . = Healaton ° mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the
application triggers referral to QT as a schedule.
concurrence agency. (1 (ii) reconfiguring a lot—
(1 (a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m2 or
greater,
(i (c) — on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(J (4) on land that abuts rail corridor land, commercial corridor land or future railway
tand and an easement abutting the corridor or future railway land is created;
([1(e) on {and that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1 () _ fora residential purpose resulting in 100 or more allotments.
U (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—
C1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
(O(c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
LX] (iv) none of the above.
Moonie to Brisbane pipeline 24, The application involves the easement for the construction or operation of the Moonie to

For more information refer to schedule 2of the IP.
Regulation,

Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Pefroleum:
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

C (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

1 (ii) reconfiguring a tot

O (ii) operational work assessable against the planning scheme, thatis filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is focated wholly or partly in the easement.

LX] (iv) none of the above.

 

Page 8

Page 15

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Requtation.

Unless you answered *none of the above”, the
application requires referrat to the Environmental
Protection Agency as a concurrence agency.

Wild river area
For more Information, refer to Guide 27

Ifyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area,
Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager.

IDAS Assessment Checklist, Version 20, 2 April 2007

25. The application involves: (tick the applicable box/es}—

C1 (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

(1 (a) clearing of native vegetation over an area greater than 2500m2;

(1) (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

(©) anextension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2,

C1 @) extracting gravel, rock or sand from an area greater than 5000m?;

(le) excavating or filling an area greater than 5000m2;

(J (f} additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

0 (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -

C1 (a) an increased number of lots;
(1) (b) clearing of native vegetation over an area greater than 2500m2,

(1 (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in {ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring @ lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

(J (a) clearing of native vegetation over an area greater than 2500m?;
[J (b) extracting gravel, rock or sand from an area greater than 5000m?;
(1 (c)_ excavating or filing an area greater than 5000m?,

EX] (v) none of the above.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?
KJ No
O yes

 

Preliminary Approval

Ifyou answered YES to Q27, the application
triggers referral to the Department of Local

Government, Planning, Sport and Recreation as
an advice agency.

27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the integrated Planning Act 1997?

XI] No
DYes

 

Wetlands

Domestic activity means the construction or use
of a single residence on a lot and any reasonably]
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretakers residence, granny flat, buitding or
structure used for a home business.

Note: Wetland is defined in the Integrated
Planning Regulation 1998.

Unless you answered “none of the above” to
Q28, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

28. The application involves: (tick the applicable boxes) -

C1(i) — amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
CD (i) reconfiguring a lot ~

In or within 100m of a wetland that will result in
(J (a) more than 10 lots being created; or
LJ (b) lots less than 5 hectares;

XX (iii) none of the above

 

Page 9

Page 16

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
Purposes, but not including environmental,
conservation, rural, natural or wiktemess area
Purposes”.

Unless you answered “none of the above” to
Q29, the application invotves referral to the
Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
(J (i) a material change of use for urban purposes that is in or within 100m of any of the
following —
(1 (a) a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
(J (b) a State forest or timber reserve under the Forestry Act 1959;
(1 (c) a marine park under the Marine Parks Act 2004;
(J (d) arecreation area under the Recreation Area Management Act 1988;
[J e) a world heritage area listed under the World Heritage Convention;
[LD (Brisbane forest park under the Brisbane Forest Park Act 1977.
O (i) reconfiguring a lot if -
C1 (a) any part of the lotis situated in, or within 100m of, any of the following —
LI (i) a protected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
Li (ii) a State forest or timber reserve under the Forestry Act 1959;
Oil) a marine park under the Marine Parks Act 2004;
D1 (iv) a recreation area under the Recreation Area Management Act 1988;
Cl) aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(J (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is tess than 5ha;
(iii) none of the above.

 

Page 10

Page 17

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

SECTION 2 - ASSESSMENT IN A WILD RIVER AREA

(completion mandatory if the proposed development is located in a wild river area)

 

Wild River Area

It the responsibility of the applicant to
determine if the development is proposed in
a wild river area,

Information about wild river areas including the
geographicat location and position of
Management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nrw.qld.qov.au or
contacting the department by email on:

wild [email protected]

Note on Referrals

Referrals for development in a wild river area
(other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referral arrangements.

Notes on development assessable
against the Wild Rivers Code

For information regarding development in a wild
river area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.

The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.

Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for develapment activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a retevant
wild river declaration.

1. Which wild river area is the development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the applicable box/es)
(_] i) a high preservation area (HPA);

oO ii) a preservation area (PA) ;

(J iti) a wild river floodplain management area (FMA);

(J iv) a wild river nominated waterway;

(J v) a designated urban area (DUA).

 

 

Environmentally relevant activities
(ERAs) in a designated urban area

Ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.

\f you answered NO to Q2, please complete the
Temaining questions in Section 2.

2. Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?

i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
LJNo (1 YES (ensure you have completed Part G of Form 1)

 

 

Clearing native vegetation

If YES, there are a limited number of purposes.
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of retevant purposes for
which an application may be made in a HPA.

if YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box ii)
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements.
apply, do not complete the remaining questions
in Section 2.

3. Is the application operational work for clearing native vegetation in a HPA?
O NO oO YES (ensure you have completed Part J of Form 1)

4. IfYES, is the clearing?

Oo i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

J ii) in a HPA outside a registered area of agriculture?

 

 

Page 11

Page 18

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
Management districts and fish habitat
areas

if you answered YES to O5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

Hf you answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA,

Note: If specified works are proposed in a local
government area, itis prescribed tidal work - the
tetevant local government will be the
assessment manager with the EPA as a
concurrence agency

Ifyou answered YES to Q5, and ticked box i) or
fil) in Q6, your application requires referral to
OPIF.

If you answered NO to Q5 and ticked box i) in
Q6, the apptication will not be accepted.

lf you answered NO to Q5, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development pemnit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
hot be accepted.

if you answered NO at 05 and ticked box iif) in
Q6, the application may be made if the works are}
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27

Residential, commercial or industrial
development

Hf you answered YES to Q7, your application is
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
nver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

lf you answered NO to 07 and ticked either box
i) or ii) in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.

IDAS Assessment Checklist, Version 20, 2 April 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

(no Clyes

The application is for one or more of the following:

(7) i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); or

(J ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

(1 ii) Buitding or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

Is the application for residential, commercial or industrial development in a designated urban

area?
Lno Cl yes

If NO, does the application for residential, commercial or industrial development involve:

oO i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

(J ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animal husbandry activities

Hf you answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animat husbandry
activities will not be accepted if proposed ina
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.

Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

(no

(1 YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

Hf you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code,

The assessing agency is NRW.

Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
20.

The production of fodder in a PA, and pasture
improvement using fow impact soil disturbance
techniques fs not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?

CINno

If YES is the application for:
(J i) a material change of use; or
(J ii) operational works.

[1 YES (ensure you have completed Part Q of Form 1 1)

 

Page 12

Page 19

INTEGRATED PLANNING ACT 1997,
Works that take overland flow water

The relevant wid river declaration will state
works that take overland flow water are either
Self assessable or assessable, or are exempt
from wid river requirements.

If you ticked Q13 7), your application must be
assessed by NRW against the Wid Rivers Code
and must comply with the code.

Ifyou ticked Q13 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wid
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q13 ffi) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

13.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

(no J YES (ensure you have completed Part Ks of Form 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works

CT ii) self-assessable works

(J iii) exempt works

 

Works that interfere with overland
flow water

The relevant wild river dectaration will state
works that interfere with overfand flow water that
are either self assessable, assessable or exempt
from wild river requirements.

Ifyou ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

if you ticked 15 ii} an application is not required
to be made however the works must comply with
the relevant set-assessabie section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
's required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

Ifyou ticked Q15 iii) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

Does the application involve works that interfere with overland flow water in a FMA?
O NO C] YES (ensure you have completed Part Kio of Form 1)

\f YES, is the application for works stated in the relevant wild rivers declaration to be?
(J i) assessable works

J ii) self-assessable works

LD iii) exempt works

 

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Aquaculture (non ERA)

Applications for aquacutture in a HPA will not be
accepted.

Hf you answered YES to Q17, your application
must be assessed by DPIF against the Wid
Rivers Code and must comply with the code.

16.

Does the application involve building or raising waterway barrier works in a PA?
CO NO O YES (ensure you have completed Part O3 of Form 1)

Does the application involve aquaculture ina PA?
[no YES (ensure you have completed Part O; of Form 1)

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for afl works that interfere with water
In a watercourse (including dams or weirs,
steam reatignment or stream diversion) will not
be accepted.

Ina PA, applications for insteam dams and
weirs may be accepted in nominated waterways.
Ifyou ticked box if} in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
fiver requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
worw.new.qid.gov.au or contacting the
department by email on:

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

CINo

IFYES,
O i) The application is for an instream dam or weir; or

(J ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

O YES (ensure you have completed the relevant Part K of Form 1)

Page 13

Page 20

INTEGRATED PLANNING ACT 1997
Environmentally relevant activitles

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
tequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs)

H you answered NO to Q20 you do not need to
complete Qs 21-24,

Ifyou answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority?+
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application wilt not be
accepted, or is exempt from wild river
Tequirements (see Q2). You will be able to
determine if an application will not be accepted
for the devetopment by answering Q21 - Q24.

if you answered NO to Q21, you do not need to
complete Q22. If you answered YES to Q21 you
are required to complete Q22,

if you answered NO to Q22, the application wit
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

ff you answered NO to 023 and the development!
is proposed in the HPA the application will not be
accepted. tf you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.

If you answered YES to Q24 the application will
not be accepted. If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

Exempt ERAs in a designated urban
area

Ifthe development is proposed in a designated
urban area there may be no wild river
fequirements, See Section 2.02.

Note: All apptications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).

20.

21.

22.

23,

24,

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?

O NO 1] YES (ensure you have completed Part G of Form)

\s the application for an ERA 20 instream?

(Jno Cl Yes

ts a quarry allocation notice held for the proposed ERA 20 instream?

Jno C1 Yes

Does the application involve any of the following in a HPA?

i) a level 2 ERA 11, (and is for specified works or a residential complex)

ii) an ERA 19 (dredging)

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

CI no CJ yYes

Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and

— not low impact; and
— not for a residential complex in the area, or for specified works.

LI] No LC] yes

 

 

Documentation

Ifyou answered NO to 025, your application
may be subject to an information request and
processing of the application may be delayed.

 

25.

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

LJ No (J Yes

1 The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW.

Page 14

Page 21

s

uy

.
:

INTEGRATED PLANNING ACT 1997

(DAS Assessment Checklist, Version 20, 2 April 2007

 

SECTION 3 -

BUILDING REFERRALS (completion not mandatory)

 

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1.
For more information go to schedule 2 table 1 and
schedule 2A of the IP Requlation.

Assessment period 15 days. No response is a
deemed refusal.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Building Code of Australia.

 

Fire safety for budget accommodation | 2.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.

 

Spray painting 3.
For more information go to schedule 2 of the JP
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

Retail meat premises 4.
For more information go to schedule 2 of the IP.
Regulation

An application may trigger referral to Safe Food Qid as a concurrence agency if the application involves a
fetail meat premises.

 

Private health facilities 5.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

Workplace area less than 2.3m? 6.
For more information go to schedule 2 of the 1P
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m2.

 

Land contiguous to a State-controlied
road

For mora information go to schedule 2 of the IP
Regulation

M™

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.

 

Pastoral workers accommodation 8.
For maxe information go to schedute 2 of the IP.
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.

 

Child care centre 9.
For more information go to schedule 2 of the |P.
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

Coastal development 10.

For more information go to schedule 2 of the IP
Regutation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line22,

 

Heritage 11.

For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.

 

Fisheries matters 42.

For more information go to schedule 2 of the !P-
Regulation

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on tand that adjoins a declared fish
habitat area.

 

Integration of land use and public 13.

transport
For more infosmation go to schedule 2 of the IP.
Requiation

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace?3.

 

 

Railway safety and efficiency 14.

For more information go to schedule 2 of the IP
Regulation

 

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The focal government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
tefusal, However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

response is taken to be a deemed approval.

 

Amenity and aesthetic impact of 15.

particular building work for single
detached class 4 building or class 10
building or structure

For more information go to schedule 2 table 1 of the
'P Regulation,

Assessment period 15 days. No response is a
deemed approval.

 

 

An application will trigger a referral to the local government if it is :
« fora single detached class 1 building or class 10 structure; and
e the local govemment has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.

 

2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
® Operational airspace is as defined in State Planning Policy 1402 “Development in the Vicinity of Certain Airports and Aviation Facilities".

Page 15

 

 

Page 22

 

 

 

 

 

 

 

os
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 20, 2 Aprit 2007
Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes teferral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regulation.

Assessment period 15 days. No response is a

deemed refusal.

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
IP Reguiaton. 18. An application may trigger referral to the local goverment as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal. 49. An application may trigger referral to the local goverment as the concurrence agency if the building work

does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 114 or 12.

Fire safety in particular budget 20. An application may irigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of the been completed.

IP Regulation,

Assessment period 15 days. No response is a

deemed refusal.

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work

For more information go to schedule 2 table 1 of the * complies with the performance criteria of the Queensland Development code part 15; and

IP Regulation and the QOC part 15. « the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusal.

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedute 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
IP Regutation and the QOC part 20. seferrat to the local government as the concurrence agency.

Assessment period 15 days. No response is a

deemed refusal.

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Requlation.

Assessment period 5 days. No response is a

deemed refusal,

Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

 

designated rainwater tank area

For more information go to schedule 2 table 1 of the
P Regutation and the QDC part 25.

Assessment period 15 days. No response is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

» Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

« Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

 

Page 16

X

Page 23

Max Watterson & Associates

Consulting Surveyors & Development Consultants

 

 

ABN 59 847 644 252 (formerly Clement, Reid & Watterson)
PRINCIP 10 Maple Street,
PAL (RO. Box 639) COOROY 4563
MAXWELL L.. WATTERSON Cadastral Surveyor (Qid) Ph: (07) 5442 6121

B. Surv (UNSW), MLLS.Aust. Fax: (07) 5442 5125

Email: [email protected]

 

REPORT TO ACCOMPANY DEVELOPMENT APPLICATION FOR
, RECONFIGURATION OF ALOT

 

 

 

ADDRESS: 16 ARMITAGE CLOSE, NOOSAVILLE
PROPERTY: LOT 1 ON SP161880
APPLICANT: S.J. & T.AE. NELSON

@ PLAN OF DEVELOPMENT: 07/2271C

DATE: 28" JUNE, 2007

 

Page 24

1. SITE

1.1. PROPERTY DETAILS: -
Description: Lot 1 on SP161880
Noosa Plan Zone: Detached Housing
Locality: Noosaville

Overlays: Natural Hazard — Flooding Hazard Area and High Hazard Acid Sulfate
Area.

South East Queensland Regional Plan: Urban Footprint

1.2 SITE DESCRIPTION

The subject properties are located at the eastern end of Armitage Close and on the
southern side of Gibson Road. The lands contain an area of 1278m’.

A two storey house stands adjacent to the western boundary of the property.

Water, sewerage, power and telephone services are connected to the properties.
Armitage Close is a bitumen road with concrete kerbs and Gibson Road is a bitumen
road.

The property is generally flat at a level of between 2.0 & 2.4m AHD with an elevated
mound along the northern boundary.

The property is generally covered by a mature garden with few significant trees
along the mound.
2. PROPOSAL

It is intended to subdivide the property to create 2 lots as shown on the Plan of
Development (Ref: 06/2271C).

The proposed new Lot 1 contains 600m? and comprises the western portion of the
property, including the existing house and driveway.

The proposed new Lot 2 contains 678m? and comprises the eastern portion of the
property, the Lot is vacant.

Both Lots have an extended frontage to Gibson Road; however it is proposed that
access to the Lots be via Armitage Close; with a new driveway constructed to Lot 2.

Sewer lines traverse the property; the proposal includes Easements over sewer lines
not currently contained within an Easement.

Page 25

3. SOUTH EAST QUEENSLAND REGIONAL PLAN

The application for the Reconfiguration of Lots designated as Urban Living Area is
permitted under the provisions of the Regional Plan.

4. NOOSA PLAN

4.1 Specific Outcomes and Solutions for the Reconfi

 
   

USL O LLC ae LLL
‘Lot Size and Dimensions

uring a Lot Code
ST ens

      

 

a) Lots have the appropriate area and
dimensions to provide for—
a) the intended use and, if not intended to be

used by the Council or State for community

infrastructure, conservation purposes or
public utilities including road widening are
not less than the minimum sizes specified

in Table 14-62 — Minimum Allotment Areas;

and

b) _ if for residential development—

i) a house site area of not less than
that specified in Table 14-63 and

ii) if not within a sewerage service
area, an effluent disposal area;

c) _ siting and construction of buildings to
minimise risk of soil erosion, landslide,
flooding and bushfire;

d) _ siting and construction of buildings to
minimise detrimental impacts of effluent
disposal and water quality impacts;

e) retention of natural environmental values,
including native vegetation;

f) retention of cultural features and protect
views to cultural features;

g) minimisation of earthworks or retaining
walls associated with building construction
on steep slopes;

h) private and public open space and on-site
landscaped areas; and

i) convenient vehicle access and on-site
parking, loading and manoeuvring areas.

OR

02 If for community title subdivision—lots have

the appropriate area and dimensions to provide

for the intended use and—

b) __ if for Detached housing, are not less than
the minimum sizes specified in Table 14-
33; or

c) _ if for other residential uses are not less
than 200m?

Table 14-62 of the Noosa Plan provides a
minimum lot area of 600? for land in the
Detached Housing Zone.

The proposed Lots include area to build
houses without risk of erosion, landslide
and bushfire.

The proposed lots do not require the
destruction of any significant trees for the
construction of a dwelling.

 

Noosa North Shore Locality

 

03 No additional lots are created within the
Noosa North Shore Locality.

Not applicable.

 

 

.Lake Macdonald Water Supply Catchment Area

 

 

O04 No additional lots are created within the

 

| Not applicable.

 

Page 26

Send

 

Specific Outcomes
Lake Macdonald Water Supply Catchment
identified on Overlay Maps OM3.5 and OM9.5.

 

Lot layout .

 

O§5 Subdivision of land for residential
development provides for a neighbourhood with a
strong and positive identity through—

a) legible streets and open space networks;

b) integrating prominent site features,
including landmarks, native vegetation and
views into the design;

c) the location of community, retail and
commercial facilities at focal points either
within convenient walking distance for
residents where the development is urban
settlement or within reasonable vehicular
proximity;

d) the location of lots intended for urban
settlement within proximity of retail and
commercial facilities;

e) shared use of public facilities by adjoining
communities;

f) enhancement of personal safety and
minimisation of potential for crime,
vandalism and fear by maximising
opportunities for casual surveillance of
public spaces; and

g) _ establishment of a sense of place.

The proposed new lots have a frontage to
Gibson Road; however access is via
Armitage Close, which is a cul-de-sac.

Armitage Close is an access road giving
access to houses along Gibson Road.

The proposed lots are located in close
proximity to the community, retail and
commercial facilities of Noosaville.

 

O6 House site areas are—

a) located at least 50m from any land including
within a national park, conservation park, state
forest reserve, nature refuge, coordinated
conservation area or wilderness area; and

6) not located on steep slopes.

The proposed house site area of new Lot 2
is in excess of 50m from any Reserve and
is located on flat land

 

O7 Lots for residential development are
designed to ensure variety in residential
streetscapes.

Not applicable.

 

 

08 The street network—

a) has design features, which convey the
primary function of each type of street and
encourage driver behaviour, speeds and
traffic volumes that are safe and
appropriate to that function;

b) provides a high Jevel of internal
accessibility both within the site and to
external sites and appropriate externa!
connections for vehicles, pedestrian and
cycle movements;

c) deters through-traffic from residential areas
and creates safe conditions for local road
users, pedestrians and cyclists;

d) incorporates street junctions and access to
lots that are located and spaced to facilitate
safe and convenient vehicle movements;

e) provides for street widths and lengths that
optimise the cost effectiveness of the
network and the provision of public utilities;

f) provides for road reserve widths not less
than the minimum identified Section 2.3 of
PSP5 Engineering Design Standards —

 

No new roads are required.

 

 

Page 27

Roads, Drainage and Earthworks;

g) minimises the extent of earthworks
required by being sympathetic to the
terrain;

h) has no significant adverse effects on
habitat corridors or areas of significant
native vegetation;

i) does not create noise attenuation
difficulties;

j) incorporates pedestrian and cyclist
crossings at intersections or where
required to access high activity nodes and
public transport;

k) has regard to the potential for conflict
between vehicles, pedestrians and cyclists;
and

)) incorporates on-road cycling facilities.

 

O9 The development contains a pathway

system that encourages walking and cycling and

provides a safe environment for users, and is--

a) a stable, smooth surface, including across
driveways, sections and joins;

b) easily maintained:

c) of a width and longitudinal gradient to cater
for projected usage

d) inclusive of clear sight-lines for safe use;

e) be free of any obstructions such as
fences, signage and bollards.

Apathway network is located adjacent to
the subject land.

 

010 The subdivision layout is designed to
facilitate linkages with adjoining sites in the
immediate area.

Not applicable.

 

O11 Where the lots are to be used for Industrial
business or Commercial business uses, the
layout provides for appropriate buffer areas, to
mitigate possible impacts on nearby residences
or other noise sensitive uses.

Not applicable.

 

012 For lots in the Rural Settlement Zone—a
sealed access to the nearest urban settlement is
available.

Not applicable.

 

| Water supply for fire fighting

 

013 An adequate and accessible water supply is
provided for fire fighting purposes.

Each lot is connected to a reticulated
water supply

 

Energy efficiency

 

 

014 The street and lot orientation facilitates the
construction of energy efficient buildings that
respond to the local climate conditions.

AND

015 For residential development, the

subdivision design provides for the maximum

practicable number of lots with house site areas

that—

a) maximise solar access to the north in
winter;

b) minimise solar access to the east and west
in the summer;

c) _ maximise access to any prevailing summer

 

The new lot layout maximises the solar to
the north in winter and minimises the solar
access to the east and west in summer.

The new lot layout also increases
exposure to the prevailing breezes.

 

 

Page 28

 

TCU LOL Cau
breezes; and
d) minimise exposure to prevailing winter
winds.

RDO

 

Infrastructure

 

016 Each lot is capable of being serviced by

appropriate levels of—

a) water supply:

b) reticulated sewerage;

c) stormwater drainage;

d) power supply; and

e)  telecommunications;

AND

O17 The design and provision of public services

and utilities, including sewerage, water,

electricity, street lighting and telecommunication
services—

a) meets the needs of users;

b) ensures health, safety and convenience of
the community;

c) protects the natural environmental values
of the site and surrounds, including visual
amenity and native vegetation;

d) are cost effective over their life cycle;

e) minimises adverse impacts to the
environment (including the amenity of the
local area) in the short and long term; and

f) ensures that the existing systems are
upgraded or relocated to be capable of
supporting the proposed development;

AND
018 Essential public utilities are available and

maintain their function during flood events up to a
1% AEP (1:100 year ARI) flood event.

All lots have water, sewerage, power and
telephone services available.

The proposal will not require the extension
of any services.

 

Electricity supply infrastructure

O19 Uses and works maintain a safe distance
from electrical infrastructure including
substations, overhead power lines, power poles
and transformers.

Not applicable.

 

Earthworks and stormwater management

 

020 Stormwater run-off is managed so as not to
cause any adverse impacts on the built or natural
environment including changes in quality,
quantity or location of stormwater discharges.

Existing stormwater structures are located
adjacent to the site.

 

0217 Filling or excavation only occurs where it

does not adversely impact on—

a) watercourses, drainage lines and wetlands,
or

b) vegetation on land identified on Biodiversity
Overlay Maps OM1.1-OM9.1; or

c) water levels on properties elsewhere.

No filling or excavation is required.

 

Landscaping and visual amenity

 

 

022 Land development responds to the
distinctive landscape character of the site by
utilising the natural features of the site, which
include—

 

The natural landform and landscape are
not modified to accommodate the
development.

 

 

Page 29

a) watercourses and drainage lines;
b) significant trees;

c) understorey vegetation;

qd} rock outcrops; and

e) views.

 

023 Native vegetation, including individual

mature trees are retained, protected, maintained

and supplemented, with particular consideration

given to—

a) roadsides;

b) the amenity of adjoining land uses; and

c) the protection of environmentally sensitive
areas.

No native trees are to be removed as a
result of the development.

 

024 Buildings and other structures do not have
a significant adverse impact upon the visual
amenity of surrounding areas.

The mound along the northern boundary
creates a visual buffer from Gibson Road.

 

Open space -

 

025 Public open space is design and located

to—

a) provide for a range of recreational settings
and accommodate adequate and
appropriate facilities to meet the needs of
the community;

b) provide a range of safe and easily
accessible recreational opportunities for the
community, except where dedicated for
conservation purposes;

c) contribute to the legibility, accessibility and
character of the /ocality,

d) create attractive environment settings and
focal points;

e) facilitate appropriate measures for
stormwater and flood management;

f) enable the retention and protection of
significant vegetation, wetlands,
watercourses, drainage lines and other
native habitat areas, their associated
buffers and \inkages/corridors and natural
and cultural features; and

g) becost effective to maintain.

AND

026 The natural environmental! and cultural
values of land in the Open Space Conservation
Zone is not adversely affected by subdivision,
and land in freehold tenure in this zone is not
subdivided.

A significant area of public open space is
available in the local area.

 

027 Adequate land is provided for active
recreation and is of a physical standard and
condition suitable for the intended uses and is
not subject to physical or other constraints
including contamination, biophysical constraints
or legislative protection that would encumber it
use.

The proposed new lots contain sufficient
area for recreation,

 

 

Availability and protection of resources

028 Development does not limit the potential for
the utilisation of extractive resources by creating
conflicts of interest.

 

Not applicabie

 

 

Page 30

 

NT LCC)
Road and rail corridors _

RULE

 

029 Lots for residential development are not
subjected to high traffic noise levels from the
major road network or rail corridors.

The lots are buffer from traffic noise by
the mound along the northern boundary.

 

Access easements

 

030 Access easements are in appropriate

locations for safe access and egress, and supply

appropriate widths and levels of service for the
number of vehicles that will utilise them.

No access easements are proposed.

 

Traffic

 

031 Traffic generated by the development is
within the acceptable capacity of external roads
and does not have an adverse impact upon the
functioning of the road network.

No minimal amount of traffic will be
generated by the development.

 

Noosa Trail Network

 

032 A comprehensive network of trails is
established incorporating road reserves, State
forests, Council owned land and private lands
consistent with the lifestyle and outdoor
recreation needs of the Shire’s residents and
visitors.

Not applicable.

 

033 The proposal does not have an adverse
impact on the Noosa Trail Network.

Not applicable.

 

Cooroibah Locality

 

 

Protection of existing residential amenity,
road safety and access points

034 The existing residential amenity of the
estate is maintained without impacting on the
natural landform and landscape;

AND
035 The number of access points providing

access to lots from McKinnon Drive is
maintained or reduced.

Not applicable

 

 

4.3 Specific Outcomes and Solutions for the Natural Hazards Overlay Code

Flood Hazard Areas

EL aL

 

BY cet ee Sens
Effects of use and works

 

 

Safety and floodplain function

O1 The proposed use does not
compromise the safety of people or property
from floods up to and including a 1% AEP
(1:100 year AR/) flood event.

 

Gibson Road provides an access route above
the 1% AEP (1:100 year ARI) flood level and
an area of sufficient size and dimensions to
accommodate users is provided, above the
1% AEP (1:100 year AR!) flood level that
allows for safe congregation and evacuation.

 

 

 

Page 31

  

Specific Outcomes
O02 Development does not result in
adverse impacts on people's safety and
capacity to use land within floodplains.

 

 
  
 

   
 

aed oy LUC OCS
The development will not change to the depth,
duration or velocity of flood waters up to and
including a 1% AEP (1:100 year ARI) flood
event.

 

Hazardous materials

03 Public safety and the environment are
not adversely affected by the detrimental
impacts of floodwater on hazardous
materials manufactured or stored in bulk.

No hazardous materials are manufactured and
stored at the site.

 

Infrastructure

04 Sewerage treatment plants maintain
their function during flood events up to a 1%
AEP 1:100 year AR/) flood event.

The development does not require the
construction of any additional sewerage
infrastructure.

 

O05 Community Uses and Infrastructure
Uses are able to function effectively during
and immediately after flood events.

Not applicable.

 

O6 = Alllots have sufficient area that is
above the 1% AEP (1:100 year AR/) flood
level or where modelling is not available, the
highest recorded flood level, to safely and
adequately accommodate their intended
use.

AND
O7 Development integrates with the

natural landform rather than modifying the
landform to suit the development.

A minor part of proposed Lot 2 adjacent to the
south-east corner will require minimal filling to
bring the level to a flood free level of 1.95m.

 

 

08 Filling or excavation only occurs where
it does not adversely impact on—

 

The minimal filling will not impact upon
watercourses, vegetation or water levels

d) watercourses, drainage lines and elsewhere.
wetiands; and

e) vegetation on land identified on
Biodiversity Overlay Maps OM1.1-
OM9.1; and

f) Water levels on properties elsewhere.

 

Acid Sulfate Soil Areas

  

Radios estrus

Effects of works

  

   

Probable solutions

 

 

General
o9
are managed to avoid the release of acid or
associated metal contaminants.

Works do not disturb acid sulfate soils or

The disturbance of acid sulfate soils is not
required by the development, with the
exception of connection of a house to
existing reticulation.

 

 

 

 

Page 32

10

5. CONCLUSION

The proposal to reconfigure the subject land to create an additional lot is in
compliance with the codes as outlined in the Noosa Plan.

The proposal has limited impact upon the amenity of the local area and the
environmental values of local area.

Max L. Watterson

10

Page 33

 

2
SP 116694

GIBSON

Pe

ot —
vf
%

QT
ys Exo

a
VS
er

S38.

-_+ Sor
s
SWP ——— 5
LL 187 —

e

L: -0.388

BM NAL IN CONC
Ris 2.14

$s

MAX WATTERSON
& ASSOCIATES

Surveyors &
Planners

10 Maple Street

COOROY

Q 4563

. (07) 5442 6121
Fox, (07) 5442 5125
Email, [email protected]

et S. NELSON

Project:

PLAN OF PROPOSED
RECONFIGURATION OF
LOT 1 SP161880.

PARISH: TEWANTIN
COUNTY: MARCH

LOCAL GOVT. NOOSA S.C.

LOCALITY: NOOSAVILLE

Seale: 1: 250 Plan 1 of 1
Datum: AHD Date: 24/07/06
Origin; PM 134060) Ref:

RL 2264
Cont. int: 1.0m 1O6/2271C

NOTES

This plen has been prepared for application
purposes only and may be subject to change.

Dimensions and areas shown hereon cre
approximate onty ond subject to find survey.

 

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1255 - Lot Recofiguration - 2 Lots [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.