Council archive · source document
07/1255 - Lot Recofiguration - 2 Lots [As Published] · 152007.1255
Specific Outcomes O02 Development does not result in adverse impacts on people's safety and capacity to use land within floodplains. aed oy LUC OCS The development will not change to the depth, duration or velocity of flood waters up to and including a 1% AEP (1:100 year ARI) flood event. Hazardous materials 03 Public safety and the environment are not adversely affected by the detrimental impacts of floodwater on hazardous materials manufactured or stored in bulk. No hazardous materials are manufactured and stored at the site. Infrastructure 04 Sewerage treatment plants maintain their function during flood events up to a 1% AEP 1:100 year AR/) flood event. The development does not require the construction of any additional sewerage infrastructure. O05 Community Uses and Infrastructure Uses are able to function effectively during and immediately after flood events. Not applicable. O6 = Alllots have sufficient area that is above the 1% AEP (1:100 year AR/) flood level or where modelling is not available, the highest recorded flood level, to safely and adequately accommodate their intended use. AND O7 Development integrates with the natural landform rather than modifying the landform to suit the development. A minor part of proposed Lot 2 adjacent to the south-east corner will require minimal filling to bring the level to a flood free level of 1.95m. 08 Filling or excavation only occurs where it does not adversely impact on— The minimal filling will not impact upon watercourses, vegetation or water levels d) watercourses, drainage lines and elsewhere. wetiands; and e) vegetation on land identified on Biodiversity Overlay Maps OM1.1- OM9.1; and f) Water levels on properties elsewhere. Acid Sulfate Soil Areas Radios estrus Effects of works Probable solutions General o9 are managed to avoid the release of acid or associated metal contaminants. Works do not disturb acid sulfate soils or The disturbance of acid sulfate soils is not required by the development, with the exception of connection of a house to existing reticulation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1255 - Lot Recofiguration - 2 Lots [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.