Skip to the record
The only place to find full transcripts.

Original source · versioned page text

P0041165_RPT_IRR - Copy

of 15

Page text shows just the words. Original shows the document exactly as it was published.

         The removal of parts of the first floor structure to allow for a lift to be installed to service both
          floors is no longer proposed. The retention of these elements represents a net heritage
          benefit.

         The demolition of parts of the northern wall on the eastern wing of the building on the first floor
          to create new openings for access to the new elevated beer garden at this level is no longer
          proposed. The retention of these elements represents a net heritage benefit.

         The demolition of two existing windows to the northern elevation on the first floor, and the
          infilling of these window spaces with new material to matching the existing finish is no longer
          proposed. The retention of these elements represents a net heritage benefit.

         The construction of new male and female toilets in the central lobby area throughout most of
          the space, as well as an accessible toilet as a separate structure in this overall location, is no
          longer proposed to the same extent as the lodged scheme. The proposed extent of the toilets
          in this location is much reduced. This represents a net heritage benefit.

         The construction of a new function room with a mobile stage in the eastern wing of the first
          floor, and a new bar, is no longer proposed. This represents a net heritage benefit.

         The construction of a function roof deck off the northern elevation of the building and above
          the current dining room, with four sets of new double doors from this elevation to allow access
          from the building to the roof deck is no longer proposed. This represents a net heritage
          benefit.

The revised scheme proposes a slightly greater demolition scope of one of the internal walls within the
original building footprint beyond what was lodged, and therefore discussed in the heritage impact
statement. This is located on the ground floor near the original window that is now being retained. A
snip of this plan is shown below (TP03 Rev 7 Existing Conditions & Demolition Plan – Ground Level);




                                                                                                              13
URBIS
P0041165_RPT_IRR
Log in to download the original file

P0041165_RPT_IRR - Copy.pdf · 438 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.