Appendix B - Geotechnical Assessment Report
Mr Tony Rossiter 21436-001-Rev0
18 November 2021
3.2 Stability Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 2 and the
Qualitative Terminology for Use in Assessing Risk to Property is also attached.
Table 2: Stability Risk Levels
Risk Level Example Implications(1)
Unacceptable without treatment. Extensive detailed investigation and research, planning
Very High
VH and implementation of treatment options essential to reduce risk to Low; may be too
Risk
expensive and not practical. Work likely to cost more than value of property.
Unacceptable without treatment. Detailed investigation, planning and implementation of
H High Risk treatment options required to reduce risk to Low. Work would cost a substantial sum in
relation to the value of the property.
May be tolerated in certain circumstances (subject to regulators’ approval) but requires
Moderate
M investigation, planning and implementation of treatment options to reduce risk to Low.
Risk
Treatment options to reduce to Low risk should be implemented as soon as practicable.
Usually acceptable to regulators. Where treatment has been required to reduce the risk
L Low Risk
to this level, ongoing maintenance required.
Very Low
VL Acceptable. Manage by normal slope maintenance procedures.
Risk
Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
depend on the nature of the property at risk; these are only given as a general guide.
Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given below, it is assessed that there would be a Low (L) Risk of landslide affecting the
proposed dam. Regulators (NC/Private Certifiers) normally require that a Very Low or Low Risk of landslide
affecting the property must be demonstrated to enable development approval. Summarised in Table 3 is our
qualitative assessment of landslide risk for the site. A summary of qualitative terminology for use in
assessing risk to property is attached (taken from AGS 2007).
Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007)
Assessed
Hazard Likelihood Consequence
Risk
Comments
Provided that our earthworks recommendations,
erosion protection and drainage control measures are
implemented as outlined in this report then the
1. Dam embankment failure. Unlikely Minor Low likelihood of embankment failure is considered
Unlikely. The consequence of such instability would
be Minor with the resultant risk being Low; as per AGS
2007.
The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.
7/10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.