231023 11C Church St BLD OW-A
11C CHURCH STREET, POMONA Landscape Plan Package Drawing Schedule · Should amended site topsoils be insufficient in quantity, contractor to import A.S. 4419 topsoil Vegetation Retention Area Annual Maintenance Regime 4.0 Revegetation and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have soils · Assess remaining native vegetation plants / stands once weed management activities have analyses test as per above. Amend Imported soils per test results prior to spreading. Task Frequency Performance Indicator concluded. Confirm areas / spaces to be allowed to regenerate naturally. LD1 Drawing Schedule, Specifications · Civil works to cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan Brushcutting October - March: Fortnightly Regenerating plants and · Revegetate areas / spaces that are denuded and/or unlikely to regenerate naturally. LD2 Specifications, Sheet Layout prescribed proposed contours and track-in, 300mm deep for gardens and 150mm deep for turf April- September: Montlly revegetation areas free from · Confirm revegetation requirements once weed removal has been completed for quantum of new areas. Landscape contractor to provide unit cost to perform these works in-lieu of civil competition with grass plants required. Adjust planting quantities accordingly. LD3 Finishes and Planting Schedules contractor. · Revegetation species as per designated area Revegetation Planting Schedules respectively. LD4 Details · Clear and remove all non-organic, deleterious and large organic matter such as rocks greater Weeding - Establishment Period - Weekly Minimal regrowth of weeds. No LP1-3 Planting Plans than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. by hand Maintenance Period - Fortnightly competition from unchecked 5.0 Landscape Construction · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall weed and grass regrowth. Specifications percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades Spraying / October - March: Fortnightly No weeds or grass of greater Levels providing a natural appearance with no abrupt edges. Wick Wiping April - September: Monthly height than plant within · See plan for engineer's plan levels and proposed levels. These landscape plans must be read in conjunction with the appropriate statutory approvals and · Ensure 2% minimum slope away from all structures to pits or swales. 500mm of plants · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a Australian Standards. · Trim topsoils for gardens, revegetation and turfing. discrepancy occurs notify superintendent and/or LA. Re-mulching Allow to carry out at least once during Uniform 100mm deep to · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. Maintenance Period, then once per year suppress weed growth and 1.0 General Notes · Grade evenly between prescribed levels and finish surface levels ensuring positive drainage maintain soil moisture 2.0 Ecololgical Rehabilitation, Vegetation Management and Revegetation and no ponding areas. Abbreviations Watering Establishment Period: Every 2 or 3 days Plants exhibit healthy growth · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled · NC - Noosa Council · A.S. - Australian Standards · There is existing vegetation on-site. In order to maximise the retained ecological values for Maintenance Period: Weekly / as required and no signs of drought stress turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between · DBH - Diameter at breast height (1.4m) · E.P. - Establishment Period this vegetation, nominated existing vegetation requires protection and management. to maintain adequate soil moisture design and finish levels. · LA - Landscape Architect · N/A - Not applicable · O.C. - On centre · Natural vegetation regeneration needs to be encouraged. · Co-ordinate establishment of levels with superintendent. Fertilising As required where and when plants are Plants exhibit healthy growth · MP - Maintenance Period · MRTS - Main Roads Technical Standard · Site weed removal and management is important to allow regeneration and is a NC not responding to slow release fertiliser and no signs of nutrient · m - metre · m² - square metre · m³ - cubic metre condition of the development approval. Drainage applied at planting. Allow to fertilise once element deficiency stress · NATA - National Association of Testing Authorities · typ. - Typical · Vegetation to be protected is plan nominated, predominately native species, in a healthy and · All damaged stormwater pipes are replaced and relocated as necessary. during Maintenance Period. · uPVC- Unplasticised Polyvinyl Chloride · S - Spread safe condition, that are not located so as to interfere with required and approved site works. · Ensure site drainage can occur positively to whole of site, minimum 2% away from any · VPZ - Vegetation Protection Zone · WbD - Water by Design · New Planting / Revegetation works shall be conducted in Vegetation Management areas as Staking As required where plants require support. Plants growing in an buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before required. Refer to Planting Schedule and Plan for more information. Allow to stake 20% of trees during upright manner continuing works. · The Landscape Plans must be read in conjunction with 28 September 2023 Judgment, · The table below summarizes the Vegetation Management program elements; Establishment Period. Allow to stake · Drainage works to correlate with and not disturb adjacent land. Attachment A pages 1-160 and the Operational Works Landscaping Decision Notice once additional 20% of trees during · See legend for plan symbols and plans for locations. issued. This plan has been developed to comply with the Noosa Plan 2020, Landscape Code Vegetation Management Program Maintenance Period. · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped in accordance with the following; Storm Damage Following storm event, heavy rainfall or Any damage noted and rectified galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements · 9.4.5 Landscaping Code Issue Vegetation Management - Clearing and Protection on-site in addition to those on plans. Inspection high winds · PSP 2 Landscaping · All drainage pits and subsurface drains to be connected to existing stormwater drainage Objective · Identify areas of vegetation and individual trees to be protected and · Table SC6.3.5.1 Pruning To promote healthy plant growth. Plants have desired natural system. Refer engineer's drawings for drains and hydraulic services. retained within the development areas and those to be cleared. Establishment Period: Monthly form and exhibit healthy growth · Stormwater drainage to be 100mmØ minimum uPVC drainage pipe. · Confirm workers understand the requirements of protection and retention. · These plans are not for tender or construction. Maintenance Period: Every 3 months · Subsurface drainage to be 100mm minimum Ag-flow pipe centred in 300mm x 300mm gravel Install protective devices to safeguard against accidental damage. trench. Gravel to be 8-20mmØ No-fines aggregates surrounded by LA approved permeable · Confirm appropriate clearing methods for nominated areas and within Monitoring Establishment Period: Provide a report to Successful establishment and Preliminaries bidim or geotextile fabric. See Detail(s) for more information. vicinity of protected and retained areas. LA on establishment progress at each scheduled maintenance · Refer to plans by others for all services locations, footpath works, levels (other than those progress payment claim. activities completed · Furnish and install 1m³ of 75mm - 150mmØ washed, sound, rounded Mary River · Minimise the time between when clearing occurs and the cleared ground is indicated on these plans) and boundaries. All services and related infrastructure including Maintenance Period: Furnish completed gravel spalls over pinned permeable geo-fabric at all new landscape drainage stabilised to reduce the chances of erosion. street lighting shown on these plans are indicative only. activities list to LA every 3 months daylight points. · Mulch or wood-chip cleared vegetation that is free of designated weed · Call 'Before You Dig Australia 11 00' prior to any excavation. · Where and if additional drainage is required the following applies: species or dispose appropriately and legally. · Before work commences the subcontractor is to organise a pre-start meeting with the LA to 3.0 Weed Management - Allow for seepage interception sub-surface drainage where paths and landscape works establish scope of works management procedures and clarify any issues. · As a condition of development approval, all noxious and environmental weeds are to be impede drainage (to be coordinated on site). Management · This Vegetation Management strategy should be included with civil works · Install tree protection measures as per plans and detail. removed from site and/or managed appropriately prior to sealing of plans. - Allow for 300mm x 300mm gravel trench with socked Ag-line under path, discharge to Strategy documentation. · Prior to commencing construction works, verify dimensions, levels and location of site · Weed control locations shall be confined to retained vegetation areas as nominated on the natural drainage lines. · Potentially obtain a guarantee by the contractor against culpable damage services, refer engineer's drawings generally. approved plans. - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side to vegetation to be retained with performance bond under the contract. · Dimensions take precedence over scale. · Weed control is summarised in the table below; of low point. · Contractor to review all schedules herein to confirm their correlation to these plans. Where Weed Management Summary Table Tasks · Superintendent to confirm plan nominated vegetation to be retained and discrepancies occur within landscape documentation refer to LA prior to provision of tender Fencing protected in-the-field and determine if any additional areas of vegetation pricing and/or construction. Task Operation Frequency · Supply and construct fencing per plans, details, and Finishes Schedule. require protection. · Retained vegetation shall be identified, clearly marked and protective 1.0 - Herbaceous Remove entire plant by hand. Alternatively kill plant with Following weed Erosion and Sediment Control Edging devices installed. Protective devices shall maintained in functional and small weed herbicide application using wick wiper or hooded spray identification and · The landscape contractor to implement and maintain for the contract duration, best practice · Supply, install, and maintain edges as specified and shown on the plans and details and condition during works operations and removed in entirely and recycled control nozzle. For herbaceous weeds cut or scrape stem and as required to erosion and sediment control measures in accordance with the manual for erosion and Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie once works have been completed. paint with 1:1 mix of an approved herbicide and water. kill weeds sediment control (Maroon Manual), good environmental practice and the consulting civil off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. · Protection devices shall be monitored daily with a report generated weekly engineer's specification for erosion and sediment control. Penalties and fines for on their success, integrity and repaired as required. 2.0 - Large and Drill and fill or frilling. An approved herbicide is delivered Following weed non-compliance will apply. 5.0 Irrigation - If Intstalled · Vegetation protection fencing (refer Detail) shall be used to protect woody weed into sapwood via drilled holes or frill-cut pockets identification and · Install silt control fencing in accordance with site environmental management plan and local vegetation nominated for retention and protection. control immediately after wound is made. Use 'cut stump' as required to authority regulations. · Liaise with relevant NC authorities and obtain any approval as required. method if accessibility permits. Cut tree 30mm above kill weeds · Comply with government standards and co-ordinate with other trades. · Sediment and erosion control devices to be installed where necessary and as directed on site Performance · Protection device integrity. ground and paint stump with undiluted an approved by superintendent. · Check locations of penetration/conduits and install where required. Indicators · Retained vegetation and trees retained are good health with no earthwork herbicide. Remove waste materials from site. · All sediment and erosion control devices are to be installed in accordance with manufacturer's · Contractor to provide qualifications and insurances before construction. machinery scars. specifications. · Irrigation system is a 'Design + Build' system. 3.0 - Remove or Remove waste materials containing flowers or seeds or As required to · Any irrigation installed shall be for establishment only and shall be removed prior to the · The contractor is responsible for ensuring sediment and erosion control devices are inspected Frequency · Weekly inspection and log by responsible person as nominated civil site manage weed species from site that can shoot from pieces of remove or 'Off-maintenance' inspection. and maintained as follows; construction manager. vegetative waste plant and dispose of at approved facility. Cover waste manage waste a) During construction: Daily during dry weather, prior to predicted storm events, twice materials when removing from site. daily during prolonged rain Responsible · Contractor nominated agent to report to superintendent. b) During establishment period: Weekly during dry weather, prior to predicted storm Person Ecological Assessment Report - Documented Site Weed Species events, twice weekly during prolonged rain · Any declared plants under; · All stockpiles are to be protected with suitable erosion control devices and graded to ensure Reporting · As nominated in the contract and/or monthly and for contract separable · Land Protection Biodiversity Act 2014 and sub-ordinate Regulation 2016 control of runoff. portions reporting to site construction manager. · Planning Scheme Policy 2 Landscaping · Coordinate installation of sediment and erosion control devices with civil contractor to ensure · Biosecurity Plan 2020 pest plants listed in Schedule 1 part 3, Schedule 2 and compatibility and consistency in control measures. Corrective · Make good or replace any damage to trees or vegetation that are Non-scheduled invasive species are required to be removed plus the following weeds · All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. Action designated for protection and retention, and reinstate protective devices as identified on-site; required. Ageratum houstonianum - Blue Billy Goat Weed Site Works Baccharis halimifolia - Groundsel · Remove all unwanted material, deleterious and operational debris from site. Tree Protection Corymbia torelliana - Cadaghi · If provided levels are not functional refer to the site superintendent and/or LA. · Install tree protection measures as per A.S.4970 and Detail as required. Celtis sinensis - Chinese Celtis · Civil engineering designs have provided a positively drained site. If there are drainage issues Cinnamomum camphora - Champhor Laurel refer site superintendent. Vegetation Removal Ipomoea cairica - Mile-a-minute · Refer to 2.0 Landscape Construction - Drainage for more information. · Retain native / endemic old growth tree hollows and suitably relocate and distribute for Ipomoea indica - Morning Glory nesting fauna. Lantana camara - Lantana Topsoil - Harvesting, Stockpiling, Amelioration Re-use and Spreading · Mulch all other native / endemic wood and leaf material, utilise on-site for revegetation Ligustrum lucidum - Tree Privet · Civil engineering earthwork operations will have harvested and stockpiled site topsoils. works where applicable and minimise weed seeds. Dispose of weed seeds, rootballs and Macroptilium atroprupureum - Siratro Landscape contractor to coordinate with civil contractor to ensure topsoil is re-installed per the debris off-site legally. Tidy up disturbed soil as specified herein. Ochna serrulata - Mick Mouse Plant following specifications in respective landscaping areas. · Mulch stockpiles <1000m³ / 2.5m H with 10m between stockpiles. Pinus elliottii - Plantation Pine · Stockpiled topsoil shall not be in any preserved vegetation areas or within three metres of · Where and if practical, translocate existing endemic ground flora affected by project Schefflera actinophylla - Umbrella Tree preserved vegetation driplines. earthworksto denuded and horticulturally/climatically suited locations within revegetation / Schinus terebinthifolia - Broad Leaf Pepper Tree · Topsoil stockpiling shall occur in an area adjacent to the stripped area(s) or area by engineer drainage area. Species include; Acacia species, Grevillea robusta - Silky Oak and Senna pendula var. glabrata - Easter Cassia or owner which will not hinder visibility for inspection of the work. Alphitonia excelsa - Red Ash Solanum mauritianum - Wild Tobacco · Stockpile topsoil to ensure no ponding of water and positive drainage. · Stablilise removal works against erosion. Spagneticola trilobata - Singapore Daisy · Install erosion control measures per engineer and above for stockpiled topsoil. Syagrus romanzoffiana - Cocos Palm · Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with Fauna Management Syngonium podophyllum - Arrowhead Vine results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape · Install five permanent artificial nesting boxes in land dedication area (see Plans for proposed Typha latifolia - Cumbungi (confirm on-site variety if found, some Typha located below contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted locations and Finishes Schedule for more information). site) by a NATA accredited lab. Zantedeschia aethiopica - Arum Lily NOTES: This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736). Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN Any reproduction or unauthorized use without written consent from Job No: 2391 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning Bird Landscape Design is strictly prohibited. 11C Church Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia Do not scale from PDF plans. M: +614 7705 5222 LD1 Drawing Schedule, Specifications E: [email protected] 23.10.23 A For Application BB BB Sheet Title Sheet 1 of 7 Client: Zaccale Pty Ltd W: birdgolfdesign.com DATE ISSUE DESCRIPTION DRAWN CKD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of pages 2 to 6 (of 7)
Page 2
7.0 Planting 8.0 Maintenance Tasks
Sheet Layout - Landscape Plans, Not to Scale
New Gardens · Maintain whole of landscape works for establishment period of 13 weeks or as in agreement
· See 1.0 Topsoil for cultivation and topsoil requirements. with Owner.
· Spread ameliorated site topsoil or A.S. 4419 imported organic topsoil to a depth of 300mm Irrigation and Watering
H
over prepared garden areas and trim. · Every day for the first two weeks (unless it rains adequately) O 92.4
92.2
· Crown garden beds 100mm H at centres to drain positively. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry 94.6
92.0
· Mulch gardens and tubestock planted areas with LA approved A.S. 4454 imported organic (unless it rains adequately). .8
91 91.6
mulch as specified 100mm deep settled. Leave 20mm between top of mowing edge and · Once a week there after.
planting area mulching. If mulched areas are >1:4 sloped, install open weave pinned jute net Mowing
over mulch once settled. · First Mow - Once after 10 days if there is rapid growth or 14 days after installation.
91.6
92.0
91.8
91.4
92.2
91.2
92.4
91.4
91.6
91.8
91.8
91.6
91.4
92.8
92.6
92.6
93.8
94.4
94.2
94.0
93.6
94
.4
· All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds
(specifically Nutsedge), pests including fire ants and soil borne viruses and diseases.
· Mowing Thereafter - Once a week during summer, once every two weeks in spring and
autumn, and once a month in winter or as required if there is a lot of growth or as desired.
LP1 LP2
94
94.2
.2
.6
Weed Removal: As required to reduce competition and seeding.
91
.4
.6
91.2
91
.0
91
Tree Planting Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen, 93
90
.8
.8
· Refer to street tree and tree planting details (as applicable) for information. with plants of the same species and of similar size and quality unless otherwise specified.
94
94.0
.0
· All trees to be certified to A.S. 2303:2018 'Tree stock for landscape use' and comply with this Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and
Church Street
89.4
90.4
specification. guying when instructed by the superintendent. G
89.6
90.6
93
· Landscape contractor to peg street tree positions for approval by superintendent before Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are
.8
93.6
93.4
93.2 91.0
90.8
93.0
89.8
92.8
excavation. established or Off-maintenance respectively.
· All trees to have a full and even crown. Monitoring: Provide a monthly report on completed tasks.
90.8
.2
91
· Install trees at locations indicated on the plans, per notes and details herein. 91.6
· Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified Warranties
· Warranties or guarantees specified shall name the Owner as warrantee. Register with
Telstra
100mm deep settled. Do not mulch within 50mm of trunk / plant stem.
.35
91
Power
Telstra
HHY
· Edge trees per details. manufacturers as necessary. Retain copies delivered with and components and equipment to
HY Marker
Water
Water
· Install street tree drainage per detail if required by civil engineer or tree pits do not drain after the Owner.
Telstra WM
WM
WM
Power
Tel Water
Power
they are tested for drainage by filling with water prior to planting and backfilling. Landscape · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within 225PVC
Power
Telstra
contractor to furnish tree pit drainage rate per tree. fourteen (14) days after practical completion.
· Install street tree root barrier as specified. Landscape contractor to furnish rate per tree. · Commence Warranty periods at practical completion or at acceptance of installation, if Tel Power
· Tree staking - per details. acceptance is not concurrent with practical completion.
Wa .02
ter
90
· All trees to be located minimum; · If installation is not by manufacturer and product warranty is conditional on the manufacturer's
- 1000mm from back of kerb (or in-between kerb and footpath where applicable (allowing
for service setbacks) or as dimensioned on plans,
approval of the installer, submit the manufacturer's written approval of the installing firm. LP3
.30
94
NBN
MH HHY HY Marker
.55
95
- 1500mm from concrete paths and property connections Certifications
.19
96
- 2m from underground services (confirm locations on-site prior to pit excavation), Furnish LA with the following certifications prior to Practical Completion:
Mat
Mat
.55
horizontally and vertically from sewer lines, · A.S. 2303:2015 Tree Stock for Landscape Use
96
- 3m from adjoining, new, or perpendicular lot boundaries, driveway crossovers, · A.S. 4419 Topsoil
stormwater catch pits, power poles, and fire hydrants · A.S. 4454 Mulch
- 6m from overhead street lighting · Turf
General Planting Sources
· Refer to detail(s) herein respectively. · Survey: Max Waterson + Associates
· Supply and place plants according to plant schedule, plant setout notes and plan locations. · Civil Engineering: BAX Engineering
· Where discrepancies occur advise superintendent prior to planting. · Architecture: All Design and Drafting
· Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated
on plans.
· Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups
to achieve optimum cover related to mature plant size and form.
· Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs,
garden edges and paths to allow for mature plant form. Confirm with LA which require more
distance.
· All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate
of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock.
Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons.
· Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls.
· Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours,
notify superintendent and correct drainage.
· Soak plants thoroughly before removing from container.
· Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted
and coiled roots to expose young roots. All stock to be free of structural defects above and
below soil line (i.e. no girdled roots).
· Do not mix soil from hole with mulch and do not compact plant pit.
· Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported
A.S. 4419 topsoil.
· Water plant in well and maintain soil moisture levels through E.P.
· Mulch bio-area basin batter areas with 25mmØ+ hoop pine, deleterious material free, 100mm
deep - settled. Install open weave pinned jute net over mulch. Do not mulch within 50mm of
trunk / plant stem and finish 20mm below hard surfaces.
· Mulch bio-area media with sugar cane mulch, uniform finish, free of deleterious materials and
weed seed (i.e. nut sedge), 100mm deep. Install pinned, open weave jute netting over mulch.
Tube Stock Planting
· Remove all weeds from planting areas. Level and trim per engineer's plans.
· Planting areas to be decompacted and cultivated 150mm deep.
· Install topsoil per specifications.
· Install plants per plant schedule densities, specifications, and details.
Tube Stock Planting for Bio-retention Areas and/or Bio-pods
· Remove all weeds from planting areas. Level and trim per engineer's plans.
· Planting areas to be decompacted and cultivated 150mm deep.
· Install topsoil per specifications. Filter media by civil contractor.
New Turfed Areas
· See 1.0 Topsoil for cultivation and topsoil requirements.
· Trim topsoil, fill depressions and provide even falls as indicated on drawings.
· Finished turf grades/contours shall be smooth and undulating, free from deleterious materials,
debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and
no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to
laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow
unimpeded over laid turf to low area respectively.
· Supply and lay 'A' grade turf per plans and schedules.
· Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is
well established.
· Water turf in well and apply water to maintain soil moisture until established.
Not to Scale
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2391 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 11C Church Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
LD2 Specifications, Sheet Layout E: [email protected]
23.10.23 A For Application BB BB
Sheet Title Sheet 2 of 7 Client: Zaccale Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD North
Page 3
Finishes Schedule Planting Schedule
Code Item Product / Description Specifications, Size, Finish, Colour Dealer, Manufacturer Code GENUS species - Common Name Size Quantity SC6.3.4.1-3 species, Native, Notes
Hardscape Trees
Nesting Box Artificial Nesting Box Install five artificial nesting boxes. Consult supplier for sizing / type recommendations. Boxes for arboreal Hollow Log Homes ACA fim ACACIA fimbriata - Brisbane Wattle 45 L 5 Yes
mammals and hollow dependent avian species. (07) 5472 3142
hollowloghomes.com.au BAC cit BACKHOUSIA citriodora - Lemon Scented Myrtle 45 L 1 Yes
[email protected]
CIT eur CITRUS lemon 'Eureka' 15 L 1 Food source
TE Garden Edge Timber Garden Edging Refer to Specifications and Detail Nominated by contractor and
approved by superintendent CYA coo CYATHEA cooperi - Australian Tree Fern 45 L 1 Yes
Softscape ELA eum ELAEOCARPUS eumundii - Eumundi Quandong 45 L 4 Yes
Topsoil Ameliorated site topsoil as per soil testing results or Excavate gardenbed areas 300mm deep and turf areas 150mm deep into existing ground. Cultivate subgrade 150mm. Nominated by contractor and ELA obo ELAEOCARPUS obovatus - Hard Quandong 45 L 3 Yes
import A.S. 4419 topsoil for garden bed and new turf Backfill turf areas 150mm deep and garden areas 300mm - mounding in center with ameliorated site topsoil or approved by superintendent.
areas. Provide soil testing results for topsoil and A.S. 4419 topsoil. Refer to details. ELA ret ELAEOCARPUS reticulatus - Blueberry Ash 45 L 10 Yes
certification to Landscape Architect.
LEP pet LEPTOSPERMUM petersonii - Lemon Scented Tea Tree 45 L 2 Yes
Gravel Mulch Gravel mulch Install Ø40-70mm Mary River gravel mulch, 150mm deep presenting 100% cover over pinned geo-fabric and kept Nominated by contractor and
50mm away from plant stems. approved by superintendent STE sin STENOCARPUS sinuatus - Wheel of Fire Tree 45 L 2 Yes
Organic Mulch Mulched Gardens ~ Townhomes Install 100mm deep settled, 25mm+Ø Hoop Pine organic mulch to all gardens keeping mulch 50mm clear of plant Nominated by contractor and SYZ ole SYZYGIUM oleosum - Blue Lillypilly 45 L 1 Yes
stems. On batters steeper than 1:4, install pinned open weave jute netting over mulch. approved by superintendent
Shrubs
Bio-media Mulch Mulched Filter Media Install 100mm deep settled, weed and seed free Sugar Cane Mulch under pinned open weave jute netting keeping Nominated by contractor and
mulch 50mm clear of plant stems. approved by superintendent
ALC ili ALCHORNEA ilicifolia - Native Holly 140mm 25 Yes
Site won Mulched Tubestock Plantings ~ Revegetation Install 100mm deep settled, 25mm+Ø composted site composed native organic mulch to translocated plants and new Nominated by contractor and
approved by superintendent ALP cae ALPINIA caerula - Native Ginger 140mm 4 Yes
Organic Mulch tubestock plantings under weed mat and keep mulch 50mm clear of plant stems.
Organic Mulch Mulched Tubestock Plantings ~ Revegetation Install 100mm deep settled, 25mm+Ø composted Forest Blend organic mulch to new tubestock plantings under weed Nominated by contractor and BAC myr BACKHOUSIA myrtifolia - Grey Myrtle 200mm 30 Yes
mat and keep mulch 50mm clear of plant stems. approved by superintendent
BAN obl BANKSIA oblongifolia - Dwarf Banksia 140mm 22 Yes
Turf Turf Refer to Plant Schedule and Detail Nominated by contractor and
approved by superintendent BAN rob BANKSIA robur - Swamp Banksia 140mm 10 Yes
BLE car BLECHNUM cartilagineum - Gristle Fern 200mm 10 Yes
BLE sil BLECHNUM gibbum 'Silver Lady Fern' 200mm 5 Yes
CAL gbf CALLISTEMON 'Great Balls of Fire' 200mm 12 Yes
CAL lit CALLISTEMON 'Little John' 140mm 11 Yes
COR rub CORDYLINE 'Rubra' 200mm 27 Yes
MEL aff MELASTOMA affine - Blue Tongue 140mm 48 Yes
LEP liv LEPTOSPERMUM liversidgei - Olive Tea Tree 140mm 12 Yes
SYZ cas SYZYGIUM 'Cascade' 200mm 10 Native, tall screening hedge
Revegetation Planting Schedule SYZ hin SYZYGIUM australe 'Hinterland Gold' 200mm 29 Native, tall screening hedge
Selections from site Remnant Ecosystems 12..3.1, 12.3.2, 12.3.11, 12.9-10.17 and in accordance with project Bushfire Management Report for Fire
Retardant Plant Species. All plants from tubes. Revegetation Drainage Channel Bottom = 1500m², Revegetation Drainage Channel Batters = 840m². SYZ san SYZYGIUM 'Straight and Narrow' 200mm 29 Native, tall screening hedge
Confirm quantity required once weed management activities have been completed and install plants per rates and suggested quantities below;
SYZ tre SYZYGIUM 'Tiny Trev' 140mm 11 Native
Code GENUS species - Common Name Suggested Quantity Notes
XAN joh XANTHORRHOEA johnsonii - Grass Tree 140mm 17 Yes
Trees
XAN lit XANTHOSTEMON verticellatus 'Little Penda' 200mm 13 Native
ACACIA melanoxylon - Blackwood 4
ALPHITONIA excelsa - Red Ash 2 Groundcovers
CYATHEA cooperi - Australian Tree Fern 3 Under existing remaining canopies only
ELAEOCARPUS obovatus - Hard Quandong 2 CAS gla CASUARINA glauca 'Cousin It' 140mm 29 Yes
ELAEOCARPUS reticulatus - Blueberry Ash 2
FICUS coronata - Creek Sandpaper Fig 3 CIS ant CISSUS antarctica - Kangaroo Vine 140mm 77 Yes
MACADAMIA integrifolia - Queensland Nut 5 Food source
MACADAMIA ternifolia - Maroochy Nut 3 GRE coo GREVILLEA 'Cooroora Cascade' 140mm 69 Native, 1m O.C.
MACARANGA tanarius - Macaranga 3
MELICOPE elleryana - Pink Euodia 2 GRE roy GREVILLEA 'Royal Mantle' 140mm 12 Yes, 1m O.C.
PITTOSPORUM undulatum - Mock Orange 2
PODOCARPUS elatus - Brown Pine 2 LOM hys LOMANDRA hystrix - Mat Rush Tubes 303 Yes, 1m O.C.
SYZYGIUM oleosum - Blue Lillypilly 3
LOM mul LOMANDRA multiflora - Many Flowered Mat Rush Tubes 302 Yes, 1m O.C.
Shrubs
LOM ver LOMANDRA 'Verday' Tubes 340 Native
ADIANTUM hispidulum - Rough Maidenhair 20 Under existing remaining canopies only, 1/10m²
ALCHORNEA ilicifolia - Native Holly 15 1/10m² BIO-AREA BASIN BATTER PLANTS Basin A Basin B
ALPINIA caerula - Native Ginger 15 Under existing remaining canopies only, 1/10m² CISSUS antarctica - Kangaroo Vine Tubes 50 5 Yes
BACKHOUSIA myrtifolia - Grey Myrtle 10 1/10m² FICINIA nodosa - Knobby Club Rush Tubes 25 5 Yes
BANKSIA oblongifolia - Dwarf Banksia 20 1/10m² GREVILLEA 'Honey Gem' Tubes 10 - Yes
BLECHNUM cartilagineum - Gristle Fern 15 Under existing remaining canopies only, 1/3m² JUNCUS usitatus - Common Rush Tubes 25 5 Yes
CORDYLINE 'Rubra' 10 1/10m² LOMANDRA hystrix - Mat Rush Tubes 300 25 Yes
PTERIDIUM esculentum - Common Bracken Fern 20 Under existing remaining canopies only, 1/1m² LOMANDRA multiflora - Many Flowered Mat Rush Tubes 300 25 Yes
MELASTOMA affine - Blue Tongue Tubes 50 - Yes
Groundcovers
WbD BIO-AREA MEDIA GRASSES - 8/m² 35m² 15m²
CISSUS antarctica - Kargaroo Vine 50 1m O.C., 1/5m², Drainage Channel Area FICINIA nodosa - Knobby Club Rush Tubes 35 15 Yes
LOMANDRA hystrix - Mat Rush 100 1m O.C., 1/2m² JUNCUS usitatus - Common Rush Tubes 35 15 Yes
LOMANDRA multiflora - Many Flowered Mat Rush 100 1m O.C., 1/2m² LOMANDRA hystrix - Mat Rush Tubes 140 60 Yes
RUBUS parvifolius - Pink Flowered Native Raspberry 30 Drainage Channel Area, 1/10m² LOMANDRA multiflora - Many Flowered Mat Rush Tubes 70 30 Yes
RUBUS rosifolius - Native Raspberry 30 Drainage Channel Area, 1/10m²
TURF ZOYSIA 'Empire' Rolls
TURF ZOYSIA 'Empire' At end of Maintenance Access driveway, plant from rolls 'A' Grade, healthy, weed and pest free
'A' Grade, healthy, weed and pest free
Note: The site's Queensland Government Vegetation Management Pre-clear Regional Ecosystems (RE) are; 12..3.1, 12.3.2, 12.3.11, 12.9-10.17
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2391 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 11C Church Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
LD3 Finishes and Planting Schedules E: [email protected]
23.10.23 A For Application BB BB
Sheet Title Sheet 3 of 7 Client: Zaccale Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 4
Site Preparation and Planting Notes:
1. Weed spray 500mm circumference around stake (remove weeds).
2. Install 900mm hardwood garden stake spray painted red at plant location.
Determining the Radius of the TPZ (Tree Protection Zone)
3. Install 1m wide weed mat per manufacturer's specifications.
· DBH (Diameter at Breast Height) - nominal trunk diameter at 1.4m above ground level
4. Plant tubestock per detail below.
· TPZ should not be less than 2m nor greater than 15m (except where crown protection is required)
· TPZ = DBH X 12
· TPZ of palms, other monocots, cycads and tree ferns should not be less than 1m
· Variations and encroachments to the TPZ in accordance with A.S. 4970-2009 3x Bamboo stakes, triangularly spaced
Install 'Suregro' tree guards or
equivalent product as per
manufacturer's recommendations
(if required, confirm with site
Timber Specification: 3x Tube Ø superintendent and LA, contractor to
Unseasoned hardwood, Class 1 Select Grade F17, ACQ or Tanalith E minimum H4 treatment, provide alternate pricing rate per tube)
with one coat of timber coating.
Galvanised timber Tubestock plant, refer to plant
fixing screws, typ. schedule for species
Fluorescent orange 5.5k.g Form shallow saucer shaped
barrier fencing mesh secured depression around plant base
/ tied 100mm below top of star
Measurement pickets at 300mm centres 1m² pinned weed mat, typ., install per
taken for DBH manufacturer's specifications
Yellow plastic capped
Fencing 100mm deep organic as specified,
star pickets
painted yellow ELEVATION minimum 50mm clear of plant stem
Vegetation to 1200mm
1.4m
be protected
Ground line
Crown DBH Cultivated subgrade and plant pit to 150mm
600mm 1200mm, maximum
TPZ
PLAN
NOTES:
· Protective fencing to be installed around the TPZ to the commencement of any site works
· Protective fencing identifying the TPZ, to be visibly signed within the development site. Lettering to comply with 150mm x 50 mm timber edging 50mm x 25mm x 450mm Topsoil per specifications
A.S.1319. hardwood peg
· Fence posts and supports to have a diameter greater than 20mm, located clear of roots 20mm @1200mm centres 5 gram 'Agriform' tablet as specified.
· Where tree protection fencing cannot be installed, trunk, branch and ground protection as specified by the project Turf as specified Use phosphorus free tablets for
Mulch as specified
Arborist in accordance with A.S.4970-2009 2x hot dipped galvanised
Banksias, Callistemons and Grevilleas
· Within TPZ, mulch to a depth of 50-100mm only for disturbed land triple grip screw to fix mitred
· Maintenance of TPZ includes regular monitoring of soil moisture levels and weed removal by hand and controlled by timber edging together,
Subgrade
appropriate use of herbicide typical.
· TPZs to be monitored, inspected and certified by the project Arborist
SECTION
· Removal of tree protection measures at practical completion or as indicated by the project Arborist
1 Tree and Vegetation Protection Detail N.T.S. 3 Hardwood Treated Garden Edge N.T.S.
LD3 Typical Detail LD3 Typical Detail 6 Tubestock Planting with Tree Guards and Weed Mat N.T.S.
LD3 For Drainage Channel Revegetation where required - Typical Section
NOTES:
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball. 3x Tube Ø
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Tubestock plant as specified
Full and even crown, typical
2 - 50mm x 50mm x 2400mm F14 hardwood
centrally pointed non-treated stakes to be
STREET TREE PLANTING DETAIL PLAN driven vertically into ground outside of the Form shallow saucer shaped depression
50mm wide hessian tree ties rootball and shall have a finished height lower around plant base
wrapped loosely around trunk, than the tree's lower lateral limbs
then a figure 8 and secured to
stake with galvanised nails or Form shallow saucer shaped depression
50mm x 150mm H4 F14 hardwood timber staples. Position tree tie between 100mm deep organic mulch as specified,
Topsoil with mulch edge, refer detail, typical around base of plant and keep mulch 50mm minimum 50mm clear of plant stem
1/3 to 1/2 overall height of tree.
above - mulch to back from trunk base
Fix edging with 3x F14 hardwood
of kerb, typical 50mm x 25mm x 450mm stakes, with 2x Ameliorated site topsoil as specified, avoid
100mm deep organic mulch as specified.
galvanised nails to fix stakes to edging, typical compaction, typical
Rootball Mound mulch at edge of plant pit to collect
1800
Street tree, water to fall down edges of plant pit.
refer detail below
Turf as specified
150mm deep cultivated subgrade, typical
'Figure 8' hessian tree tie, typical
Hardwood stakes (2), see section set parallel Slow release fertiliser as specified. Use
KERB INVERT
to road, typical phosphorus free tablets for Banksia,
Tree pit to be excavated to nominal depth of
Callistemon and Grevillea species.
600mm. Backfill hole with 100% friable
Slow release fertilizer
ROAD
ameliorated site topsoil firming progressively.
as specified All excavated fill to be removed off site. Scarify
2x hot dipped galvanised triple grip screw to fix Subgrade
mitred timber edging together, typical all sides of plant pit, typical.
NOTES: 100mm deep uniform gravel layer. Provide
Extent of tree pit excavation to be 1800mm x 1800mm in area, minimum (subject to footpath location). Remove all excavated fill off-site. clean connection to road drainage as advised
Place tree, 1000mm from back of kerb, or between kerb and footpath as applicable. on site by civil engineer.
Garden areas to extend from back kerb to footpath, typ.
Edging to extend to footpaths where applicable with street tree centrally located within garden (allowing for services setbacks), refer to 4 Tree Planting - in Garden or Turf 1:30 7 Tubestock Planting N.T.S.
plans for path locations.
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball. LD3 Typical Section LD3 Typical Section
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Full and even crown, typical
2 - 50mm x 50mm x 2400mm F14 hardwood
centrally pointed non-treated stakes (shown
perpendicular to kerb for graphic clarity only)
50mm wide hessian tree ties to be driven vertically into ground outside of the
wrapped loosely around trunk, rootball and shall have a finished height lower
then a figure 8 and secured to than the tree's lower lateral limbs Plant pit 2x width of respective pot. 2x pot Ø Shrub / groundcover / tufty
Scarify all pit walls and bottom, typ. grass plant species per plan 600mm
stake with galvanised nails or Form shallow saucer shaped depression Pot Ø typical
staples. Position tree tie between
around base of plant and keep mulch 50mm
1/3 to 1/2 overall height of tree.
from trunk base Backfill plant pit with specified 100mm deep and settled organic
topsoil, avoid compaction, typ. mulch as specified, keep minimum
100mm deep organic mulch as specified.
50mm from plant stem. Form shallow
Mound mulch at edge of plant pit to collect
dish drain to base of plant, typ. Varies,
water to fall down edges of plant pit. Garden topsoil as specified,
avoid compaction, typ. refer
Turf as specified Plans
Timber Edge Detail 1 - LD3
100mm, typ.
Slow release fertiliser as specified.
600
Tree pit to be excavated to nominal depth of Use phosphorus free tablets for
600mm. Backfill hole with 100% friable 2x rootball depth, typ.
Banksia, Callistemon and Grevillea
ameliorated site topsoil firming progressively. species.
All excavated fill to be removed off site. Scarify
Slow release fertilizer all sides of plant pit, typical. 150mm, typ. 150mm deep cultivated
as specified subgrade, typ.
150mm cultivated subgrade 100mm deep uniform gravel layer. Provide Existing subgrade, typ.
and pit walls clean connection to road drainage as advised
on site by civil engineer. Road Back of kerb or hardstand Turf Roll, typical
2 Street Tree Planting - Timber Edges 1:30 5 Potted Shrub, Groundcover Planting 8 Turfing
LD3 Typical Section Detail LD3 Typical Section Detail N.T.S. LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2391 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 11C Church Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
All dimensions in millimetres unless noted otherwise.
LD4 Details E: [email protected]
23.10.23 A For Application BB BB
Sheet Title Sheet 4 of 7 Client: Zaccale Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 5
ADJOINS LP2
9 LOM hys, Planting Plan Legend Detail
9 LOM mul - 2 LEP liv 30 LOM hys,
11 SYZ san alternated 7 SYZ cas 7 SYZ san 7 BAC myr 30 LOM mul Electric Service
FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2
E Refer to plans by others to confirm locations and
FT2 FT2 FT2 locate on-site prior to commencing works
O
O
O Sewer Service
FT2
O TE TE TE TE TE TE
FT1
S
O TE TE
FT3
O
TE TE
Refer to plans by others to confirm locations and
1 CIT eur O
O locate on-site prior to commencing works
O
FT1 TE
TE
FT1
O
O
O 1 ELA ret
O Telecom Service
O 4 CAL lit
TE
FT1 TE
FT1
T
FT2
O
O
Refer to plans by others to confirm locations and
O 14 LOM ver locate on-site prior to commencing works
O
24 LOM hys, O 94.6
TE
O
23 LOM mul - O
O
O 2 MEL aff Water Service
alternated O 1 ELA obl Refer to plans by others to confirm locations and
1 BAC cit W
TE
FT2
O
O
3 CAL lit 22 LOM ver 2 ALP cae locate on-site prior to commencing works
5 BAC myr O
O 5 BAN obl
O 11 LOM ver 5 SYZ hin 2 BLE sil 3 MEL aff
TE
O
O
1 LEP liv O Stormwater
O 15 CIS ant
SW
O
O
Refer to plans, confirm existing locations and
FT2
O
O locate on-site prior to commencing works
O
O FT3
O
O
O
1 XAN joh Existing Vegetation to Remain 1
O
O
2 ELA eum Refer to Detail
O LD4
FT2
O
1 LEP liv O 2 BAN obl
O
TE
O
O
3 SYZ cas O
O
O 4 XAN joh
TE
O
O 6 BLE car
FT2
O
O 8 CIS ant 1 CYA coo 1 LEP pet 2 ELA ret
O
O 4 Tree Protection Fencing 1
FT
TE
O 1 BAN rob
O
O FT3 Refer to Specifications, Detail LD4
O
3 BAC myr O
TE
O 1 XAN joh
FT2
O
91.4
91.8
91.6
1 LEP pet 1, 6
93.
94.
O
94.4
94.
93.
O 4 XAN lit Vegetation Retention and Management Area
94
O
TE
O Refer to Specifications, Details LD4
.4
6
8
0
2
O
O
O
O
16 GRE coo
TE
O
O
18 COR rub Gravel Mulch
FT2
1 LEP liv O
O
O Refer to Specifications, Finishes Schedule, Details
O 20 LOM ver 7 MEL aff
O
O
O
O FT3 4 CAL gbf 4 CAL lit Timber Garden Edge 3
TE
O
O 8 CIS ant
2 SYZ tin Refer to Specifications, Detail
FT2
O
LD4
TE
O
O
O
1 BAN rob
O
O 75 LOM hys,
2, 3
TE
O Street Trees
O 13 ALC ili 75 LOM mul
94
O
O 94.2 Refer to Specifications, Plant Schedule, Detail(s) LD4
.2
FT2
O
TE
O
1 LEP liv O
O
O 1 ELA ret
O
O
O
Trees 4
O Refer to Specifications, Plant Schedule, Detail(s)
O
O
FT3 LD4
FT2
1 LEP liv O 8 CIS ant
FT1
FT1
O
O 2 CAL gbf
TE
O
4 SYZ san
O
O Shrub, Climber / Vine, / Pruned Shrub 5
FT1
FT1
O
O
O
Refer to Specifications, Plant Schedule and Detail LD3
TE
O
FT2
O
FT3
FT1
O
O
O
TE
O FT1 FT1 FT1 FT1 FT1 FT1 FT1 FT1 FT1 FT1 Groundcovers 5, 7
O
O
O 1 ELA obo 93 Refer to Specifications, Plant Schedule, Details LD4
O .8
TE
O
FT2
O
94
1 LEP liv O
O
O 94.0 Vegetation Management and Rehabilitation Area
.0
O
O
147 LOM ver O
5 BAC myr
Refer to Specifications, Plant Schedule, Detail
O
O FT3
O
116 LOM ver,
FT2
O
O
O
29 CAS gla - O
O
Artificial Nesting Box
(1/5 Lom ver) O Refer to Finishes Schedule
O
O
O
O Gravel for basin TE
O maintenance access 6
FT2
3 SYZ hin O Revegetation Drainage Channel Bottom -
O 3 GRE coo
O 5 BAC myr Grasses, Ferns,Groundcovers.
TE
O
Gravel for Unit 10
LD4
O Refer to Specifications, Plant Schedule, Detail
O maintenance access
O
TE
O
O Revegetation Drainage Channel Batter - 6
FT2
O
O 2 XAN lit Trees, Shrubs, Groundcovers
O
LD4
TE
1 LEP liv O Refer to Specifications, Plant Schedule, Detail
93
O
O
O
1 BAN rob
O
O
O
FT1 TE FT1 TE
.8 Bio-basin Batter Planting 7
FT2
O
O
O 93.6 Refer to Specifications, Plant Schedule, Detail LD4
O
O 93.4
O 93.2
O
O 93.0
O
O 92.8 Bio-basin Media Planting 7
O
LD3
FT2
O Refer to Specifications, Plant Schedule, Detail
O
O
O
O
O
O
O Basin A Turf 8
O Refer to Specifications, Plant Schedule, Detail LD4
O
FT2
O
O
O
O
O
O
O
O
O
O
FT2
O
O
O
BUILDER NOTE
O Builder to review services plans by others to ensure that
O none are aligned and / or installed within 1m of proposed
ADJOINS LP1
ADJOINS LP2
O trees during construction.
O
O
Scale in metres O
O
PLAN NOTES:
FT2
O
O
O See Sheet LD3 for Schedules
0 1 2 5 10 O
O
O
Contour Interval: 500mm ~ existing, 100mm ~ design
O
ADJOINS LP3 O
O ADJOINS LP3
NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:150 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:300 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2391 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. 11C Church Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services Do not scale from PDF plans. M: +614 7705 5222
(underground and overhead) from the responsible authority All dimensions in millimetres unless noted otherwise.
LP1 Planting Plan E: [email protected]
23.10.23 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 5 of 7 Client: Zaccale Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North
Page 6
ADJOINS LP1
Planting Plan Legend Detail
30 LOM hys, 2 LEP liv 1 LEP liv 6 BAN rob
30 LOM mul 7 SYZ san 7 SYZ cas 7 SYZ hin 1 SYZ ole 1 BAN obl Electric Service
FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2 FT2
E Refer to plans by others to confirm locations and
locate on-site prior to commencing works
H
TE
Sewer Service
92.4
FT3
FT3
TE TE TE
FT1
TE TE TE TE TE TE TE TE TE TE TE TE
FT3
S Refer to plans by others to confirm locations and
TE
92.2 locate on-site prior to commencing works
TE FT3
TEFT1
1 ELA obo
TE
Telecom Service
TE FT3
TEFT1
T Refer to plans by others to confirm locations and
No street trees due stormwater pipe under kerb and street locate on-site prior to commencing works
TE
trees need to be 2m from underground services per NSC.
1 ACA fim 92.0 Water Service
TE
4 BAN obl W Refer to plans by others to confirm locations and
8 CIS ant 16 CIS ant 1 ACA fim locate on-site prior to commencing works
TE
1 ALP cae 6 MEL aff 8 XAN joh
5 COR rub
3 BLE sil 30 GRE coo Stormwater
TE
SW
Refer to plans, confirm existing locations and
1.8 locate on-site prior to commencing works
9 91.6
TE
2 BAN obl 1 COR rub
1 ALP cae 2 COR rub Existing Vegetation to Remain 1
TE
Refer to Detail
LD4
6 CIS ant
3 XAN lit
TE
2 BLE car
Church Street
1 ACA fim 1 ELA ret 16 CIS ant
3 XAN joh 6 BAN obl
2 BAN obl 4 Tree Protection Fencing 1
1 STE sin 3 GRE coo FT Refer to Specifications, Detail LD4
2 ELA eum
2 COR rub
91.6
91.8
91.4
1 ACA fim
92.0
1 ELA ret
92.2
91.2
92.4
91.8
91.4
91.6
92.6
92.8
92.6 1 STE sin Vegetation Retention and Management Area 1, 6
12 GRE roy 17 GRE coo Refer to Specifications, Details LD4
1 XAN lit
Gravel Mulch
Refer to Specifications, Finishes Schedule, Details
FT1
4 XAN lit 6 CAL gbf
2 MEL ell
TE
4 SYZ tin 5 SYZ tin Timber Garden Edge 3
TE Refer to Specifications, Detail
FT1
FT3 FT3 LD4
TE
55 LOM hys,
Basin B
55 LOM mul 11 LOM ver
FT1
5 BAC myr 14 SYZ hin 1 ELA ret Street Trees 2, 3
TE
2 MEL aff Refer to Specifications, Plant Schedule, Detail(s)
12 ALC ili LD4
FT1
1 ACA fim
TE
.6
91
FT1
Trees 4
264
9911.
TE
Refer to Specifications, Plant Schedule, Detail(s)
. 0 LD4
91
FT1
Shrub, Climber / Vine, / Pruned Shrub 5
.8 Refer to Specifications, Plant Schedule and Detail
90 LD3
Groundcovers 5, 7
Refer to Specifications, Plant Schedule, Details LD4
Vegetation Management and Rehabilitation Area
Refer to Specifications, Plant Schedule, Detail
Artificial Nesting Box
Refer to Finishes Schedule
89.4
90.4
Revegetation Drainage Channel Bottom - 6
Grasses, Ferns,Groundcovers.
LD4
G Refer to Specifications, Plant Schedule, Detail
2 ELA ret
Revegetation Drainage Channel Batter - 6
Trees, Shrubs, Groundcovers
89.6
LD4
Refer to Specifications, Plant Schedule, Detail
90.6
Bio-basin Batter Planting 7
Refer to Specifications, Plant Schedule, Detail LD4
91.0
90.8
89.8
Bio-basin Media Planting 7
Refer to Specifications, Plant Schedule, Detail LD3
Turf 8
Refer to Specifications, Plant Schedule, Detail LD4
90.8
1 ELA ret
.2
BUILDER NOTE
91
100 LOM hys, 91.6 Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
ADJOINS LP1
100 LOM mul trees during construction.
Scale in metres 26 MEL aff PLAN NOTES:
See Sheet LD3 for Schedules
0 1 2 5 10 Contour Interval: 500mm ~ existing, 100mm ~ design
NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:150 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:300 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2391 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. 11C Church Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services Do not scale from PDF plans. M: +614 7705 5222
(underground and overhead) from the responsible authority All dimensions in millimetres unless noted otherwise.
LP2 Planting Plan E: [email protected]
23.10.23 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 6 of 7 Client: Zaccale Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North
The text continues on page 7.