sensitivity analysis was undertaken to determine the bioretention area necessary
to meet the Total Phosphorus water quality objective of less than 16 micrograms
per litre. It was determined that the water quality objective could not be
achieved by bioretention basins of any size. Therefore, it is assumed that
compliance with the State Planning Policy Total Phosphorus water quality
objective is in this instance acceptable.
Item 14: Demonstrate the design of proposed bioretention basins provides adequate
footprint to facilitate for 1:4 batters.
Response: All batters within the proposed bioretention basins will have 1:4 batters. Refer
to the Site Based Stormwater Management Plan (revision 3) prepared by Morgan
Consulting Engineers for details.
Item 15: Where proprietary devices are proposed as an option- demonstrate that the
methodology for pollutant reduction modelling for the proprietary device is fully
endorsed by Stormwater Australia for their pollutant reduction efficiencies,
consistent with the Water by Design MUSIC modelling guidelines, and that the
applicant is satisfied with the maintenance costs likely to be involved with
maintaining the water quality treatment train to perform as modelled.
Response: Refer to the attached documentation from Humes Water Solutions which
demonstrates that the methodology for the pollutant reduction pollutant
modelling is consistent with the Water By Design MUSIC modelling guidelines.
Additionally, the documentation demonstrates compliance with the Draft
Stormwater Australia – Stormwater Quality Improvement Device Evaluation
Protocol.
Item 16: Provide the MUSIC modelling files used to size and design the proposed water
quality treatment train.
Response: Attached are the two MUSIC Modelling Files for the two stormwater quality
treatment options referenced in the Site Based Stormwater Management Plan
(revision 3) prepared by Morgan Consulting Engineers.
Item 17: Provide a preliminary drainage plan to demonstrate that drainage from the
proposed water quality treatment train can be achieved.
Response: Refer to MCE drawings 15099/SK02/A1, 15099/SK03/A0 and 15099/SK04/A1
included in the attached Site Based Stormwater Management Plan (revision 3)
prepared by Morgan Consulting Engineers.
Item 18: Demonstrate the proposed water quality treatment train will not increase the
amount of excavations needed into Acid Sulphate Soils and will not be subject to
groundwater influence.
Response: It is noted that the entire basement of the proposed development will be
situated below 5m AHD. Accordingly, an Acid Sulfate Soils Assessment will be
provided. Should Acid Sulfate Soils be encountered on-site, they will be managed
in accordance with an Acid Sulfate Soils Management Plan to be implemented
during construction. It is noted that the site is within close proximity to Lake
Doonella which is tidal and therefore maintains a varying water surface level
around 0.00m AHD. Therefore, it is understood that the groundwater (if present)
level on-site would be at 0.00m AHD or very close to 0.00m AHD. The proposed
water quality treatment measures will have a minimum relative level of
approximately 3.0m AHD. Therefore, groundwater influence is not considered to
be possible.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response_010616.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.