Original source · versioned page text
Planning Report
Connectivity Table 8.2.2.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Connectivity Justification
PO5 AO5 The dwelling will be sited towards the front
Development is designed and operated to Development is designed and of the allotment preserving the biodiversity
maintain and enhance connectivity between operated to maintain ecological corridors at the rear. The dwelling location,
size and form is consistent with adjoining
and across ecologically important areas and linkages and maximise opportunity
lots and will not adversely affect existing
connecting habitat and support unimpeded for connectivity and the movement of ecological linkages.
and safe movement of terrestrial and fauna by:
aquatic fauna. (a) ensuring protection of wildlife
refuges;
(b) maintaining vegetation in
patches of the greatest
possiblesize and within the
smallest possible
edgetoarea ratio;
(c) enhancing connectivity
through planting and
rehabilitation works,
including across property
boundaries, to areas of
national park, state forest or
reserve;
(d) avoiding the creation of
physical barriers and safety
hazards (such as roads,
pedestrian access and
instream structures) along
and within the ecological
linkage;
(e) providing mitigation
measures such as wildlife
movement infrastructure,
fauna exclusion and
directional fencing,
underpasses/overpasses
and traffic calming devices,
signage and lighting; and
(f) where offsets are necessary,
delivering offsets that
support and enhance
ecological linkages.
30 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.