Original source · versioned page text
Planning Report
Water hydrology Table 8.2.2.3. Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Surface and ground water hydrology Justification
PO9 AO9.1 The proposed clearing will have negligible
Development ensures that the natural Development does not impact impacts on the natural surface water
surface water and groundwater hydrologic on the natural surface water hydrological regimes.
regimes of waterways, wetlands and orgroundwater hydrologic
The clearing will have minimal land
hydrologicallysensitive plant communities regimes and this is facilitated disturbance and will not re-direct existing
are not adversely impacted. by: overland flow paths.
(a) avoiding or minimising
Editor's Note—Groundwater dependent channelization,
ecosystems are identified on Queensland redirection or
Government Wetland Info mapping. interruption of flow;
(b) avoiding groundwater
extraction;
(c) maintaining
groundwater
recharge and
discharge
processes;
(d) maintaining natural
groundwater fluctuations;
(e) avoiding causing ingress
of saline water into
freshwateraquifers of
wetlands; and
(f) avoiding contaminants
entering groundwater
(e.g. fromrunoff, effluent
disposal).
32 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.