In reply please refer to:
  Our Ref: SC-8218
  Your Ref: MCU21/0033


  18th May 2021

  Noosa Council
  PO Box 141
  Tewantin QLD 4565

  Attention: Tara Norley

         RE: Response to Information Request MCU21/0033 Proposed Unit Development at 31
                                   Bottlebrush Ave, Noosa Heads

  Dear Tara,

  In response to Council’s Further Advise Notice dated 7th April 2021, we provide the following further
  information.

  Item 15 and 16
     By adopting the revised design, we certify that a B99 vehicle can enter and exit the site in a forward
     direction without scraping or bottoming out on the driveway and/or the road formation as modelled on
     Empire Engineering Civil Design (SC-8839).

  Item 17.1
     A 10kL stormwater detention tank has been provided as sized and described in the Site Based
     Stormwater Management Plan as attached, discharging peak flows at a mitigated flow rate to the kerb
     and channel.

  Item 17.2
     The existing upstream overland flow path has been diverted within the site, around the proposed unit
     development, directed down the south eastern property boundary. This was achieved by utilising the
     adequately sized Vantage Pipe ‘Vspoodrain’ product as seen on Empire Engineering Plans Drawing
     Number C003, before discharging to the kerb and channel via 2/100mm pipes.




  We trust the above response satisfies Council requirements in relation to this matter. Should you have any
  further queries, please contact the undersigned at our Sunshine Coast office.

  Yours faithfully




  Sean Dwyer
  Civil Engineer
  BE(Civil), M.I.E Aust, CPEng, RPEQ17012

  For and on behalf of
  EMPIRE ENGINEERING Pty Ltd

Log in to download the original (Engineering IR Response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 13 pages

Page 2

In reply please refer to:
Our: Troy Paulsen
At: Sunshine Coast
Our Ref: SC-8839

     18th May 2021

     Noosa Shire Council
     PO Box 141
     Tewantin QLD 4565


     RE:       SITE         BASED   STORM   WATER    MANAGEMENT          PLAN     FOR    PROPOSED
     APPARTMENTS AT 31 BOTTLEBRUSH AVE, NOOSAVILLE


     1. INTRODUCTION
     The proposed development consists of a multi-apartment development and associated car
     parking. The site is fronting Bottlebrush Ave to the South West and existing residential
     allotments to the remaining boundaries. The site is currently occupied by a single two story
     residential dwelling with its associated access driveway. The total site area is 506m 2 and has an
     approximate fraction impervious of 46% (Fi = 0.46).


     2. STORMWATER CONNECTION
     Under existing conditions, stormwater runoff discharges to the kerb and channel fronting the
     subject site, before falling to the North West before flowing into the existing 300mm diameter
     underground stormwater network. The proposed stormwater will continue to discharge into the
     Bottlebrush Ave kerb and channel in accordance with local council’s discharge flow rates of
     maximum 25L/s.


      3. STORMWATER QUANTITY
     The proposed development will increase the impervious nature of the site compared to pre-
     development to a fraction impervious of 80% (Fi = 0.80). Therefore, peak flow mitigation is
     proposed to limit minor and major flows (50%, 20%, 10%, 5%, 2% & 1% AEP), to that of the
     pre-development scenario to ensure the downstream pipe capacity is not worsened.

Page 3

Detention will be incorporated in the post-development scenario for the minor events that will
discharge into the existing kerb and channel. XP-STORM V2017.2 was used to determine the
detention volume required and the results are illustrated in Table 1.1. Table 1.1 illustrates that
10kL of detention with two 100mm diameter outlet mitigates the minor event discharge to less
than the required 25L/s flow rate and less than the pre-development scenario.


A concept stormwater management plan has been provided in Attachment 1, and hydrographs
have been attached in Attachment 2.


                   AEP (ARI)    Pre-Development         Post-Development Peak
                                Peak Flows              Flows (Mitigated)

                   50% (2yr)    0.024                   0.015
                   20% (5yr)    0.033                   0.018
                   10% (10yr)   0.043                   0.020
                   5% (20yr)    0.049                   0.021
                   2% (50yr)    0.046                   0.023
                   1% (100yr)   0.051                   0.025

                           Table 1.1 – Pre vs Post Development Discharge

Page 4

                                                                               Subject Site:
                                                                           31 Bottlebrush Ave,
                                                                                Noosaville




                                                                                    N

                                   Figure 1.1 Site Location
Should you have any further requirements in relation to the above matters, please contact the
undersigned.




Yours Faithfully,




Troy Paulsen
RPEQ No. 6990
For and on behalf of
Empire Engineering Pty Ltd

Page 5

ATTACHMENT 1: Concept Stormwater Management Plan


[OCR of page images]
ATTACHMENT 1: Concept Stormwater Management Plan

td te
bbb beg ed OPLETETTELELTTELL EDIE by

OCELELLEEELELELEELELELEA EEL EDEL ‘Fi
COLELELELEELELELELEELETEDELLTLELELEEE PAGE
OLEULLLELEELELELELEELELELELLELELEED
tt tt Fi AOLELELEELELELELEELELELELEE ED
CL IELELEELELELEELELEE LGD ELEE

tes

 

 

 

CbEttE ELS
tH: Clipe ch ti tests et ttt tt ér be
A ‘C4 COCEELELEEE LET:
AOL EDELLTLELEELEL ELLE EES
‘t OLE AIEEE EE: tht eg

 

‘onee, ee eee tts
tilt tt tt tt LETHE ELE
sthtirlbistttttbheg
OCPEEE,
bP IEEE DRL ETE
tts
SPbEt tty

 

 

2 > ‘te

 

Post Outlet >

 

Page 6

ATTACHMENT 2: Hydrographs




                            Pre-Development




                            Post-Development


[OCR of page images]
ATTACHMENT 2: Hydrographs

Node - Pre-Development

 

 

 

 

= = =
ECN_50Opct_15min_2[Max 0.024] ECN_20pct_15min_2[Max 0.033] ECN_10pct_30min_3[Max 0.043]
ss = =
ECN_5pct_30min_3[Max 0.049] ECN_2pct_30min_6[Max 0.046] ECN_1pct_30min_6[Max 0.051]
0.050
0.045
0.040
0.035
> 0.030
So
it 0.025
0.020
0.015
0.010
0.005
0.000
Fri 0:30 1:00
Jan 2016 Time
Pre-Development
Conduit 2/100mm Dia from 10kL Tank to Post Outlet
= = =
ECN_SOpct_15min_10[Max 0.015] ECN_20pct_15min_10[Max 0.018] ECN_10pct_30min_3[Max 0.020]
= — —
ECN_5pct_30min_3[Max 0.021] ECN_2pct_30min_6[Max 0.023] ECN_1pct_30min_6[Max 0.025]
0.025
0.020
0.015
&
we
0.010
0.005
0.000
Fri 0:30 1:00
Jan 2016 Time
Post-Development

Page 7

ATTACHMENT 3: Vantage Pipes - Technical Manual V Spoon Drain


[OCR of page images]
ATTACHMENT 3: Vantage Pipes - Technical Manual V Spoon Drain

Page 8

Technical
Manual
May 2016




VSpoonDrain™

               TM


[OCR of page images]
 

™

Vantage

Page 9

1.0 Introduction


Looking for a quick solution to forming open channel       Applications:
drains? Using VantagePipes™ VSpoonDrain™ Open              „ Back of barrier drainage for retaining walls
Channel Drainage as a permanent formwork allows for        „ Channel drains alongside hardstand areas, grated
rapid construction with minimal hand finishing of placed     covers can be used if desired
concrete. Available in sizes from 225 up to 750mm,         „ An easy method for forming an open drain into
there is a size to suit any application.                     concrete slabs.
Benefits:                                                  Available in standard 4m lengths, VSpoonDrain allows
„ Rapid setup of forms and location braces                 rapid installation and cost savings for open channel
„ Easy placement of backfill concrete with minimal         drains.
  labour required
„ Minimal finishing of backfill concrete
„ Smooth, aesthetically pleasing and hydraulically
  efficient finished surface.




Notes:
„ VSpoonDrain can be cut to any custom length and
  butt jointed
„ Join VSpoonDrain to the next adjacent length by
  simply placing end to end, so that the specially
  grooved ends are mated in a rebate joint. Fill any
  gaps between spoon drain lengths using a flexible
  mastic
„ VSpoonDrain is not suitable for areas subject to
  traffic loads.




2        Technical Manual - VSpoonDrain™


[OCR of page images]
Looking for a quick solution to forming open channel
drains? Using VantagePipes™ VSpoonDrain™ Open
Channel Drainage as a permanent formwork allows for
rapid construction with minimal hand finishing of placed
concrete. Available in sizes from 225 up to 750mm,
there is a size to suit any application

Benefits:
Rapid setup of forms and location braces
Easy placement of backfill concrete with minimal
labour required
Minimal finishing of backfill concrete
Smooth, aesthetically pleasing and hydraulically
efficient finished surface

Notes:
VSpoonDrain can be cut to any custom length and
butt jointed
Join VSpoonDrain to the next adjacent length by
simply placing end to end, so that the specially
grooved ends are mated in a rebate joint. Fill any
gaps between spoon drain lengths using a flexible
mastic
VSpoonDrain is not suitable for areas subject to
traffic loads.

Applications:
Back of barrier drainage for retaining walls
Channel drains alongside hardstand areas, grated
covers can be used if desired
An easy method for forming an open drain into
concrete slabs.

Available in standard 4m lengths, VSpoonDrain allows
rapid installation and cost savings for open channel
drains.

 

 

2 Technical Manual - VSpoonDrain™

Page 10

2.0 Design & Installation


2.1 Design
Simple, easy to use VantagePipes™ VSpoonDrain™ almost
                                                                   VSpoonDrainTM
designs itself. Typically backed by a 15-20MPa mass concrete
support, the VSpoonDrain acts as a permanent formwork
for the smooth drainage channel providing quick and easy           Masonry Anchor
installation.
In most cases reinforcing mesh is not required, however this
should be checked by an appropriately qualified person for
site specific requirements.


  Embankment           VSpoonDrainTM       Retaining Wall




                                                                                                             Formwork

                                                                                                             Concrete Plinth




                                                               Concrete Plinth Option
                                                               „ Concrete plinth poured and set to reqd level in advance
                                                                 (2 per length)
  Reinforcing
  Mesh (if required)
                                                               „ VSpoonDrain secured to plinths using required masonry
  15-20MPa
                                                                 anchors
  Mass Concrete                                                „ Masonry anchors left in position after concrete curing.


                                                                 Threaded rod

Typical back of barrier installation                             Timber
                                                                 hanger
2.2 Installation
„ Install side forms if required and VSpoonDrain hangers
„ Position and secure the VSpoonDrain (see possible setup
  diagrams below)
„ VSpoonDrain can be cut to any required length and
  angles and butt jointed
„ Join VSpoonDrain to the next adjacent length by simply
  placing end to end, so that the specially grooved ends are
  mated in a rebate joint
„ Fill any gaps between VSpoonDrain lengths using a
  flexible mastic
                                                                                                            Formwork
„ Cover the VSpoonDrain using a piece of form ply to
  prevent concrete spills into the VSpoonDrain channel                                                      VSpoonDrain TM

  during pouring
„ Place concrete and trowel finish edges flush with the top
  edge of the VSpoonDrainchannel                               Timber Hanger Option
„ After suitable curing time has elapsed, remove formwork      „ Timber hanger fabricated and attached to VSpoonDrain
  and braces and plug any remaining holes with a suitable         with threaded rod (2 per length)
  urethane or grout filler material.                           „ VSpoonDrain and hangers positioned and secured to
                                                                  framework
                                                               „ Threaded rod removed and hole filled after concrete
                                                                  curing.




                                                                                   Technical Manual - VSpoonDrain™             3


[OCR of page images]
2.1 Design

 

 
 
 
   

Simple, easy to use VantagePipes™ VSpoonDrain™ almost
designs itself. Typically backed by a 15-20MPa mass concrete
support, the VSpoonDrain acts as a permanent formwork
for the smooth drainage channel providing quick and easy
installation.

VSpoonDrain"™

Masonry Anchor

In most cases reinforcing mesh is not required, however this
should be checked by an appropriately qualified person for
site specific requirements.

 

 

VSpoonDrain™ Retaining Wall

   

Embankment

     
 

    

Formwork

Concrete Plinth

 

 

 

Concrete Plinth Option
Concrete plinth poured and set to reqd level in advance
(2 per length)
Re |e
ren rare VSpoonDrain secured to plinths using required masonry
anchors

Masonry anchors left in position after concrete curing.

   

15-20MPa
Mass Concrete

 

 

 

 

Threaded rod

 
 
 
   
    

Typical back of barrier installation Timber

hanger

2.2 Installation

Install side forms if required and VSpoonDrain hangers
Position and secure the VSpoonDrain (see possible setup
diagrams below)

VSpoonDrain can be cut to any required length and
angles and butt jointed

Join VSpoonDrain to the next adjacent length by simply
placing end to end, so that the specially grooved ends are
mated in a rebate joint

Fill any gaps between VSpoonDrain lengths using a
flexible mastic

Cover the VSpoonDrain using a piece of form ply to
prevent concrete spills into the VSpoonDrain channel
during pouring

Place concrete and trowel finish edges flush with the top

Formwork

VSpoonDrain™

 

 

 

edge of the VSpoonDrainchannel Timber Hanger Option

After suitable curing time has elapsed, remove formwork Timber hanger fabricated and attached to VSpoonDrain

and braces and plug any remaining holes with a suitable with threaded rod (2 per length)

urethane or grout filler material VSpoonDrain and hangers positioned and secured to
framework
Threaded rod removed and hole filled after concrete
curing

 

Technical Manual - VSpoonDrain™

Page 11

Fast. Smart. Proven. Strong.
1800 659 850 | VantagePipes.com.au

COPYRIGHT MAY 2016 © FRCPA PTY LTD t/as VantagePipes ABN 64 605 089 941

05/16

Page 12

ATTACHMENT 4: Vantage Pipes - V Spoon Drain Calculations


[OCR of page images]
ATTACHMENT 4: Vantage Pipes - V Spoon Drain Calculations

 

 

 

 

D
= 300
= 150
= 0.013
S= 0.015
Surface Width (a) = 300
P= 471.2389
Height over CL (b) = 0
angle = 0
included angle = 180
Area= 35342.92
R= 75
Vel= 1.677908
Flow (Q) = 59

Page 13

ATTACHMENT 5: Stormwater Management Plan


[OCR of page images]
ATTACHMENT 5: Stormwater Management Plan

Page 14

                                                                                                                                                                                                                                                                                                                                                                                             LEGEND




                                                                                                                                                                                                                                                   VISITOR




                                                                                                                                                                                                                                                                                                                                                                         UPSTREAM OVERLAND FLOW
                                                                                                                                                                                                                                                                                                                                                                            PATH CALCULATIONS
                                                                                                                                                                                     SITEWORKS LAYOUT PLAN




                                                                                                                                                                                                                                                                                                                                                                               Project North:




                                                                                                                                                                                                                                                                                                                                                                                                           N
                                                                                                                                                                                                                                                                                                                                                                               Scales:
                                                                                                                                                                                                                                                                                                                                                                                       0         1    2    3    4    5m      1:100 at A1
                                                                                                                                                                                                                                                                                                                                                                                   A
                                                                                                                                                                                                                                                                                                                                                                                                                             1:200 at A3

                                                                          SECTION                                                                                                                                                                                                                            SECTION
                                                                                                                                                                                                                                                                                                                                                                               Status:




                                                    NOTES                                                                                                                                                                                            Client:   COLE PROJECTS                   Designed:   SFD       Drawn:      AJP         Title:                                      Date:       MAY 2021       Scale:  AS NOTED
Issue                  Amendment   Date       Dft   1. This is the property of the engineer, and may not be                                                       Sunshine Coast Office                     Bundaberg Office
  A
  B
        FOR APPROVAL
        FOR APPROVAL
                                   14.05.21
                                   17.05.21
                                              AJP
                                              AJP
                                                       used, copied, or reproduced wholly, or in part without the
                                                       express permission of the engineer. Infringement in any
                                                                                                                                                                  L2, 13 Norval Court Maroochydore Q 4558
                                                                                                                                                                  PO Box 102 Mooloolaba Q 4557
                                                                                                                                                                                                            66A Barolin Street Bundaberg Q 4670
                                                                                                                                                                                                            PO Box 2052 Bundaberg Q 4670
                                                                                                                                                                                                                                                     Project: PROPOSED APARTMENT DEVELOPMENT   Approved:                                              STORMWATER MANAGEMENT PLAN                 Job Ref No:        Drawing No:  Issue:
  C     FOR APPROVAL               18.05.21   AJP      way may result in legal action.
                                                                                                                                                    Engineering   P: 07 5477 6437                           P: 07 4154 4894                                    31 BOTTLEBRUSH AVENUE,
                                                    2. Figured dimensions take precedence over scaled.
                                                    3. Verify all dimensions on site.                               ACN 112761510 ABN 21112761510
                                                                                                                                                                  E: [email protected]      E: [email protected]
                                                                                                                                                                                                                                                               NOOSA HEADS                                       TROY PAULSEN / RPEQ: 6990
                                                                                                                                                                                                                                                                                                                                                                                             SC-8839                  C003           C

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.