Original source · versioned page text
Engineering IR Response
In reply please refer to: Our Ref: SC-8218 Your Ref: MCU21/0033 18th May 2021 Noosa Council PO Box 141 Tewantin QLD 4565 Attention: Tara Norley RE: Response to Information Request MCU21/0033 Proposed Unit Development at 31 Bottlebrush Ave, Noosa Heads Dear Tara, In response to Council’s Further Advise Notice dated 7th April 2021, we provide the following further information. Item 15 and 16 By adopting the revised design, we certify that a B99 vehicle can enter and exit the site in a forward direction without scraping or bottoming out on the driveway and/or the road formation as modelled on Empire Engineering Civil Design (SC-8839). Item 17.1 A 10kL stormwater detention tank has been provided as sized and described in the Site Based Stormwater Management Plan as attached, discharging peak flows at a mitigated flow rate to the kerb and channel. Item 17.2 The existing upstream overland flow path has been diverted within the site, around the proposed unit development, directed down the south eastern property boundary. This was achieved by utilising the adequately sized Vantage Pipe ‘Vspoodrain’ product as seen on Empire Engineering Plans Drawing Number C003, before discharging to the kerb and channel via 2/100mm pipes. We trust the above response satisfies Council requirements in relation to this matter. Should you have any further queries, please contact the undersigned at our Sunshine Coast office. Yours faithfully Sean Dwyer Civil Engineer BE(Civil), M.I.E Aust, CPEng, RPEQ17012 For and on behalf of EMPIRE ENGINEERING Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Engineering IR Response.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.