Amended Stormwater Management Plan - Revision B 10.3.21

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
6.4 RESULTS
The outcome from the MUSIC modelling for the developed mitigated and developed
unmitigated scenarios are shown in figure 3 and table 5.




                                         Figure 3 - MUSIC Screenshot




                           Developed                Developed              Load Reduction   Required Load
    Pollutant Type
                          Unmitigated               Mitigated                    (%)        Reduction (%)
    TSS (kg/year)             344                     36.7                      89.3             80
     TP (kg/year)            0.88                     .233                      73.6             60
     TN(kg/year)             7.02                     3.39                      51.7             45
   Gross Pollutants
                               61                          0                    100              90
      (kg/year)


                                   Table 5 - Pollutant Load Reduction Results


The load reduction achieved meets the minimum load reductions from the Guidelines. Given
the proposed development will meet the water quality and quantity objectives it is considered
that the development complies with Noosa Council’s stormwater requirements.




NMA-SBSWMR-20004 Noosa Youngcare                                                                        12
Log in to download the original file

Amended Stormwater Management Plan - Revision B 10.3.21.pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.