Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Amended Stormwater Management Plan - Revision B 10.3.21

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SUMMARY


The following Site Based Stormwater Management Plan addresses the stormwater drainage
issues associated with the development of Lot 1 on RP 226728 known as 32 Viewland Drive,
Noosa Heads

The proposed development is summarized as an SDA Accommodation Development for
Youngcare.

The site falls approximately 7.5% to the south west corner. From an environmental perspective,
there are no clear environmental values associated with the site as there are no waterways and
vegetation is non-remnant. The site measures 3105m2. The existing stormwater drainage will
be improved on by the stormwater management proposed herein.

Erosion control measures will comply with best management practices.

There will be an increase in impervious surface area due to the development but the increase in
peak flow and runoff volume are mitigated by a stormwater management strategy that reduces
the impact compared with existing drainage conditions.

Achieving the water quality objectives is an important aspect of the proposal.

The design is based on design standards as described in “State Planning Policy 4/10 Healthy
Waters” and “Queensland Urban Drainage Manual” which in turn references “Water Sensitive
Urban Design for South East Queensland”.




NMA-SBSWMR-20004 Noosa Youngcare                                                              1
Log in to download the original file

Amended Stormwater Management Plan - Revision B 10.3.21.pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.