Amended Stormwater Management Plan - Revision B 10.3.21
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3. SEDIMENT & EROSION CONTROL 3.1 EROSION POTENTIAL Based on the completed Noosa Council Erosion Hazard Assessment Form, the proposal is classified as a “low risk” development for erosion potential see Appendix A for a copy of the completed form. Erosion and sediment control (ESC) measures will be required to be established and maintained in accordance with IECA’s standards of best practice. Preparation of a detailed ESC plan will be completed as part of the operational works submission. 4. SITE DRAINAGE INVESTIGATION 4.1 DESIGN RAINFALL INTENSITIES Rainfall intensities were obtained from the Bureau of Meterology’s Rainfall Intensity Duration Data (RIFD) for Noosa Heads, Queensland. 4.2 PERFORMANCE REQUIREMENTS The performance requirements for the stormwater system include: • Development to be generally in accordance with QUDM (2016); • Major Design Storm is 100 year ARI event (1%AEP); • Minor Design Storm is 10 year ARI event; and (10%AEP) These requirements will be complied with throughout the detailed design stage. NMA-SBSWMR-20004 Noosa Youngcare 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.