Development Application - Part 2 of 2 - Plans
ENVIRONMENTAL MANAGEMENT NOTES
PERFORMANCE OBJECT I VES: TO CONTROL EROS I ON AND PREVENT SED I MENT FROM LEAV I NG THE SITE
DURING CONSTRUCTION ACTIVITIES AND I OR BY VEHICLES ENTERING AND LEAVING THE SITE
COMPL I ANCE STANDARDS: APPROVED SITE BASED MANAGEMENT PLAN
ENV I RONMENTAL PROTECT I ON ACT 1994
ENVIRONMENTAL PROTECTION (WATER) POLICY 1997
ANZECC WATER QUALI TY GU I DEL I NES
COUNCIL’S SUBDIVISION AND DEVELOPMENT GUIDELINES
ACTI ONS I MEASURES: IMPLEMENT PROV I S IONS OF THE APPROVED SITE BASED MANAGEMENT PLAN
’M-iERE POSSIBLE CONSTRUCTION TO BE CAREFULLY PLANNED AND CARRIED OUT IN STAGES
AREAS ’M-iERE NO CONSTRUCT I ON I S TO BE UNDERTAKEN SHALL BE ADEQUATELY FENCED OFF TO
PREVENT TRAFF I CK I NG BY HEAVY MACH I NERY
EXPOSED AREAS MUST HAVE ADEQUATE S I L T CONTROL MEASURES (SEDI MENT FENCES, CUT OFF
DRAINS, EARTH BUNDS, CHECK DAMS, GRASSED SWALES, TURFED STRIPS ETC AS APPROPRIATE)
AND BE REHAB I LI TATED AS SOON AS POSS I BLE, S I L T CONTROL MEASURES ARE TO BE MA I NT A I NED
FOR EFFECTIVE SILT CAPTURE UNTIL REMEDIAL WORKS HAVE ESTABLISHED
ALL VEHICLES TO USE ONLY DESIGNATED ENTRY I EXIT POINTS TO SITE VIA SHAKEDOWN AREA
ALL EROS I ON a SED I MENT CONTROL MEASURES SHALL BE REGULARLY I NSPECTED AND MA I NTA I NED.
TH I S SHALL BE MANDATORY AFTER EACH STORM EVENT
AS A MINIMUM, ALL EXPOSED AREAS SHALL HAVE SILT FENCES ERECTED ON THE LOW SIDE OF THE
CONTOURS, I NCLUD I NG ALL STOCKP I LED SO I L
OUR I NG CONSTRUCTI ON, ALL POTENT I AL SCOUR I NG I MMED I ATEL Y DOWNSTREAM OF CONSTRUCTED
STORtMlATER OUTLETS SHALL BE CONTROLLED BY:
~--L___J~_j - M I N 11.11 SE AND CONTROL AMOUNT OF I NFLOW OR PREVENT I NFLOW FROM ENTER I NG THE UPSTREAM
SYSTEM
I
I - PROVIDE A TEMPORARY OUTLET PRIOR TO ITS ULTIMATE DESIGN LOCATION 110M -
151.11 AND
USE TH I S BUFFER AS A S I LT CONTROL MEASURE I NCORPORAT I NG SUCH DEV I CES AS II N LOG I CAL
TY:::::’::--:’-:’-i i
-RDERI ROCKS OR BOULDERS TO DISSIPATE FLOW VELOCITY,
DAMS, S I LT FENCES AND SAND BAGS
SEDIMENTATION BASINS I CHECK
..t! j
- NOT 0 I STURB I NG AREAS OF EX I STI NG GRASS AND GROUND COVER
-
CONSTRUCTI NG STORtMlATER OUTLET TO ACH I EVE SHEET FLOW
PERFORMANCE INDICATORS: THE PRINCIPAL CONTRACTOR SHALL INSPECT THE SITE DISCHARGE
LOCAT I ON FOR SIGNS OF SED I MENT
REPORT I NG:THE PR I NC I PAL CONTRACTOR SHALL NOT I FY THE SUPER I NTENDENT OF ANY BREACHES
TO THE ABOVEMENT 10NED MEASURES. THE PR I NC I PAL CONTRACTOR AND SUPER I NTENDENT SHALL
THEN RE-ASSESS THE ADEQUACY OF THE FAILED DEVICE AND MODIFY THE MEASURES, AS
APPROPRIATE
ALL SITE PERSONNEL ARE ALSO REQU I REO TO BE 0I L I GENT AND REPORT ANY CONTROL MEASURE
FA I LURES TO THE PR I NC I PAL CONTRACTOR
FREQUENCY: THE PR I NC I PAL CONTRACTOR SHALL I NSPECT ALL S I LT CONTROL MEASURES TO
SERVICED ENSURE COMPLI ANCE I N ACCORDANCE WITH COUNC I L STANDARDS OR AS 0 I RECTED BY THE
APARTMENTS SUPERINTENDENT. TO ENSURE COMPLIANCE SILT CONTROL MEASURES SHOULD BE INSPECTED AT A
MINIMUM:
WEEKLY DUR I NG DRY PER I ODS
DA I LY OR AFTER EVERY STORM EVENT OUR I NG WET PER 10DS
MONTHL Y OR AFTER EVERY STORM EVENT OUR I NG MA I NTENANCE PER I 00
S I LT SHALL BE REMOVED REGULARLY FROM ALL S I LT CONTROL DEV ICES
THE SUPERINTENDENT SHALL CONDUCT RANDOM INSPECTIONS WITH THE PRINCIPAL CONTRACTOR AND
I OR COUNC I L INSPECTOR
CORRECT I VE ACTI ONS : S I LT CONTROL DEV I CES SHALL BE CLEANED OF S I LT AND DEBR I S
FOLLOW I NG EVERY STORM EVENT
S I LT OR DEBR I S THAT HAS BREACHED CONTROL DEV I CES SHALL BE CLEANED UP
SERVICED SO I L I MUD DEPOS ITS ON ROADS SHALL BE WASHED DOWN AND CLEANED UP
APARTMENTS SO I L I MUD SHALL BE PREVENTED FROM ENTER I NG THE UNDERGROUND STORtMlATER ORA I NAGE
SYSTEM US I NG APPROPR I ATE CONTROL MEASURES
THE CONTRACTOR IS TO NOTIFY THE
SUPERVISING ENGINEER OF ANY DISCREPENCIES
BETWEEN THE DESIGN PLANS AND THE
CONDITIONS ON SITE PRIOR TO COMMENCEMENT
OF ANY PIPE LAYING.
c~E.E.’(...
E.E.,,\E. ~D
~O,..
N
Consulting Engineers 1:500 10 5 0 10 20 A1’ she2012~
development consultants, planners and surveyors
JF & PCONSUlTING ENGINEERS PTY.LTD. ASN 71 050 414 (Q8
1,1000
,...,__,..... !
A3 NOOSA DOMAIN RETIREMENT VILLAGE
drawing number
"
dall.m: At deriYed origin (BM)
SUNSHINE COAST GLADSTONE NOT SCALE FROM THIS DRAWING.USE ONLY DIMENSIONS PROVIOED .IF IN OOUEJT PlEASE ENOUIRE
237-239 BllIdman Avenue,
Maroochydore. Queensland. 4558
59 Goondoon S1Jeet,
Gladstone. Queenaland. 4e8O designed .1M..1 COPYRIGHT 0200 JF & P CONSULTING ENGINEERS PTY. LTO. .’ment revlsklndetab date I,~
COUNTRY CLUB VILLAGES PTY, LTO, M1717-E02 C
telephone (07)S443 2500
BRISBANE.JF&P House
Crv Eme.t and Mariya" Street&,
South Brisbane. Queensland. 4101
telephone (07)3844 71 1
telephone (07)4Q72 2100
W~.E d",,,,,
checked
JM
N
I THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
I ~~~~~~~;FI~:~~~~I=GI~~~TD.
A
B
ORIGINAL ISSUE
GlUY PIT PftOTEC11OH IIIlICATBl
28.2.l1li
2D.e.1III
JM
JM
EROSION & SEDIMENT CONTROL PLAN SHEET 2 -
file name
M1717-8l1-E02.DWG
s approved A.Fraser..... .......J(.....~......~... ...RPEQse91 C CONSTRUCTED STAGES SHOWN 18.04.12 SCP date 282.08
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Development Application - Part 2 of 2 - Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.