Council archive · source document
Minor Change Existing Approval OPW11 0023.01 · OPW11/0023.01
Officer: Conor Neville Direct Telephone: 07 53296287 Our Reference: OPW11/0023.01 Your Reference: PR102995-10 26 September 2019 Bunnings Group Limited C/- RPS Australia East Pty Ltd PO Box 1559 FORTITUDE VALLEY QLD 4006 [email protected] Dear Sir Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 24 July 2019, requesting a minor change to an existing development approval. Council on 20 September 2019, decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: OPW11/0023.01 Street address: 178 Eumundi Noosa Rd Noosaville Qld 4566 Real property description: Lot 101 SP 241371 Planning Scheme: The Noosa Plan (8 June 2018) Decision details The following type of approval was issued by Negotiated Decision Notice on 23 May 2011 Development Permit for Operational Works – (Engineering Works) – Drainage Works, Extraction, Excavation or Filing and Landscaping In relation to the request to make a minor change to the existing approval, Council on 20 September 2019, decided to approve the requested changes. The changes are detailed below. Approve the change Amend condition 39 Include additional condition 39.1 currency period of approval The currency period for this development approval is 4 years starting the day that the original development approval OPW11/0023 took effect. assessment manager conditions This development approval is subject to compliance with the following assessment manager conditions: DEVELOPMENT PERMIT FOR OPERATIONAL WORK (ENGINEERING WORKS) - DRAINAGE WORKS, EXTRACTION, EXCAVATION OR FILLING AND LANDSCAPING The development shall be carried out in accordance with the approved plans listed below or as modified herein. Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer - Construction at the “pre start” meeting. A Traffic Management Plan (TMP) for the development addressing all construction phases shall be prepared by suitably qualified persons and submitted to Council for approval prior to the pre start meeting. The TMP shall address, but not be limited to, all items listed below, and shall be flexible in that it addresses all stages of the development: A single nominated access location to and from the site The plan should detail the routing of trucks to and from the site Provision of onsite parking for personnel working on this development Provision of safe cycle and pedestrian movements in the vicinity of the development on Gateway Drive and Eumundi Noosa Road No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act Provide an indication where the surplus spoil is to be transported to, and/or source of imported fill material. The total required pavement thickness shall be based on the Department of Main Road’s Pavement Design Manual using soaked CBR tests of the subgrade. The design pavement thickness, together with CBR test results shall be submitted to Council’s Chief Executive Officer (CEO) for approval prior to placement of pavement material. Council’s Engineering Officer - Construction (ph 07 5475 9866), shall be given seven (7) days’ notice of intention to commence works to arrange a “pre start” meeting prior to the commencement of works. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any sub contractors also have the appropriate insurance and public liability documentation. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s signed approved drawings and conditions by the applicant. Please provide one copy (A3 size) of the approved plans and a copy of the job specifications for Council’s Construction Technical Officer. The Consulting Engineers for the project shall be currently Registered Professional Engineers of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all inspections with Council’s Engineering Officer - Construction or nominated staff. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project. (This person will be the contact for the project). Grated drains must be provided on the access driveways to Gateway Drive. The grated drains must be constructed adjacent to the Gateway Drive frontage and wholly within the property boundaries and runoff directed to the site stormwater drainage system. Stormwater runoff from the development must be managed generally in accordance with the following plans and except as modified by the conditions contained herein: Drawing 4400-02-CE CO2-03 Rev 07 Proposed Internal Drainage & Pavement Layout Plan & Pit Schedule by TGM group dated 17 May 2011 Drawing 4400-02-CE C03 03 Rev 05 Civil Details Sheet by TGM group dated 17 May 2011 Prior to the pre-start meeting all drawings requiring amendment by conditions herein must be certified by an RPEQ and approved by Council officers. The base and batters of the bioretention basin must be compacted such that future movement or settlement is minimised. Certification of the earthworks from the RPEQ must be submitted to Council at the completion of the works. The interface between the bioretention basin and surrounding in situ soils must be lined with an impervious layer to prevent migration of any contaminants from surrounding soils into the basin. The western retaining wall of the bioretention basin must be located a minimum of 1.5m from the western property boundary. Consequently, the filter media area of the bioretention basin must be shifted east by 1.5m and maintain the required minimum filter surface area of 212m2 Construction detail for all retaining walls of the bioretention basin must be demonstrated on the amended plans. Retaining walls must be constructed from inert materials and in accordance with relevant engineering standards. Delete the 100mm layer shown between the transition layer and drainage layer on the Bioretention Section A-A on Drawing 4400-02-CE C03 03 Rev 05 Civil Details Sheet by TGM group dated 17 May 2011. Deleted Deleted Open weave jute matting must be installed and securely fastened over the mulched batters on all overland flow path areas of the batters into the bioretention basin. Planting densities in these areas must include groundcovers, shrubs and trees as follows: 0.2m separation distance for groundcover species 0.5m separation distance for shrub species; and 1m separation distances for tree species Planting densities within the bioretention basin must be a minimum of 8 plants per m2 within the filter media area. The bioretention under-drains and cleanout points shall be provided as UPVC pipe generally as shown on IPWEAQ Standard Drawing No.WSUD-003 Where the bioretention filter media interfaces with stormwater pits and retaining walls non-woven geotextile shall be fixed to the pit / retaining wall and extend 300mm out into the filter media generally in accordance with IPWEAQ Standard Drawing No.WSUD-001 to prevent tunnelling of water along the interface. Bioretention Basin The bioretention device must be constructed and established in accordance with the document Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). During construction and establishment of the bioretention devices, the supervising RPEQ must ensure that the Bioretention Construction and Establishment Sign-Off Forms contained in Section 3.15 of the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009) are completed and the supporting information and data required by the forms attached. These forms must be submitted to Council prior to issuing of a final compliance certificate in conjunction with certification from the RPEQ that the device has been constructed in accordance with the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009), all conditions of approval, and the approved engineering drawings. A construction hold point shall be established once the biofiltration device underdrainage pipe work is installed. At this time an inspection shall be arranged with Council’s delegate. At the time of inspection, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled on-site. Laboratory results must be provided for the filter media which demonstrate that the media complies with the specifications contained in the latest version of the “Guidelines for Soil Filter Media in Bioretention Systems” (produced by the Facility for Advancing Water Biofiltration) and that the minimum hydraulic conductivity specified on the approved engineering plans will be achieved. The drainage layer, transition layer, and filtration media materials shall not be installed until the catchment draining to the bioretention device has 70% groundcover as determined by Council’s delegate. Prior to issuing of a final compliance certificate, the results of in-situ hydraulic conductivity testing conducted in accordance with FAWB PRACTICE NOTE 1: In Situ Measurement of Hydraulic Conductivity Belinda Hatt, Sebastien Le Coustumer April 2008 are to be provided for the bioretention filter media. The filter media is to achieve the design hydraulic conductivity prior to issuing of a final compliance certificate, unless it can be demonstrated that the resulting hydraulic conductivity will not result in a significant reduction in the basins performance. Education The development shall be provided with approved Permanent signage, in relation to water quality, which shall be erected educating the public of the function of the bioretention basins. Suggested wording for the water quality signage for the bioretention basin is as follows: “BIORETENTION BASIN - This bioretention basin reduces the pollution of our waterways by reducing the amount of heavy metals, litter, suspended solids, and nutrients discharged to Lake Doonella”. At the pre-start meeting submit and have endorsed by Council’s delegate detailed drawings showing the design of the signage. The dimensions, standard and presentation of construction, and locations of such signage shall be detailed on the drawings. Prior to issue of the Certificate of Final Compliance Prior to issue of final compliance an RPEQ certification must be provided to certify that the rainwater tanks installed to service the development minimum capacity of 98 kL and 5kL to capture runoff from the warehouse and nursery area respectively. Prior to issue of the certificate of compliance an “as con” survey in ACAD format must be provided to confirm that a minimum detention capacity of 1100m3 is provided within the detention basin. Sediment and Erosion Control Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. These measures must include as a minimum, but are not limited to, the following: Ensure non essential exposure of soil is prevented by: restricting the extent of clearing to that necessary for access to, and safe construction of, the approved works; protecting vegetation in all other areas of the site; and by minimising the duration of soil exposure by: staging the works to minimise the area of soil exposed at any one time, effectively stabilising cleared areas prior to rainfall if works are delayed or works are not intended to occur immediately. See E&SC Advice Note 1, effectively stabilising areas at finished level without delay and prior to rainfall; and effectively stabilising steep areas, such as stockpiles, batters and embankments, which are not being actively worked and prior to rainfall Where it is not feasible to effectively stabilise cleared areas of exposed soil, such as areas being actively worked, implement a full suite of erosion and sediment controls to maximise sediment capture in those areas and to minimise erosion such that erosion by all forms other than splash (raindrop impact) erosion and sheet erosion does not occur; and In areas of exposed soil where it is not feasible to either effectively stabilise the surface or implement a full suite of erosion and sediment controls, for example in the areas being actively worked and where the implementation of some erosion and sediment controls would impede construction activities, ensure contingency measures are available on site and are implemented, prior to rain, to maximise sediment capture and to minimise erosion such that erosion by all forms other than splash (raindrop impact) erosion and sheet erosion does not occur Effectively stabilise all stockpiles, batters and embankments without delay. Where it is not feasible to effectively stabilise a stockpile, batter or embankment, such as areas being actively worked, ensure that sediment controls are installed and surface stormwater flows are managed such that erosion of stockpiles, batters or embankments is not caused by concentrated stormwater flows For all works or other disturbances undertaken within waterways (including riparian areas) ensure: prior written approval from the relevant consent authority exists, and Work within waterways must only be: undertaken during dry weather; be promptly rehabilitated conforming to the natural channel form, substrates and riparian vegetation as far as possible; and be undertaken in accordance with Best Practice Erosion and Sediment Control, Appendix I – Instream works, Sections 14 and 16, International Erosion Control Association (2008) Temporary vehicular crossings of waterways must be designed and constructed to convey flows and remain stable for all rainfall events up to the 1 in 10-year average recurrence interval (ARI) event of critical duration Ensure clean stormwater is diverted or managed around or through the site without increasing the concentration of total suspended solids or other contaminants in the flow and without causing erosion (on site or off site). If it is not feasible to divert all areas discharging clean stormwater around or through the site, manage the clean stormwater runoff as for contaminated stormwater runoff, and ensure that sediment basins are sized to accommodate the additional volume of runoff (See E&SC Advice Note 2). Ensure sheet flows of stormwater are managed such that sheet and rill erosion is prevented or minimised. Ensure that all concentrated stormwater flows including drainage lines, diversion drains, channels and batter chutes are managed onto, through, and at release points from the site in all rain events up to and including the average recurrence interval (ARI) event of 1 in 2 year ARI without causing water contamination, sheet, rill or gully erosion, sedimentation, or damage to structures or property Ensure measures have been implemented such that the runoff from all disturbed areas flows to a sediment basin or basins. Where it is not feasible to divert runoff from disturbed areas of the site to a sediment basin, implement compensatory erosion and drainage controls prior to rainfall to ensure that erosion of those areas does not occur, including erosion caused by either splash (raindrop impact), sheet, rill or gully erosion processes (See E&SC Advice Note 3). Ensure each sediment basin has the capacity to treat flows to current best practice standards (see E&SC Advice Note 4) and as a minimum to contain all the stormwater runoff from the 80th percentile 5 day rainfall depth and store 2 months sediment from the receiving catchment, as determined using the Revised Universal Soil Loss Equation. Ensure sediment basins are maintained with sufficient storage capacity to capture and treat the runoff for the design rainfall depth or event. Where sediment basins are proposed to be oversized for storage of captured water for re-use, install survey markers in each such basin to indicate the level that water within the basin must be lowered to, in order to meet the storage capacity specified in the above requirement. Ensure sediment basins are dewatered as soon as practicable after each rainfall event. Ensure that during dewatering, the concentration of total suspended solids (TSS) discharged does not exceed 50mg/L and that pH is within the range of 6.5-8.5. The concentration of TSS released by dewatering may only exceed 50mg/L where it can be demonstrated and supported through documentation that: further significant rainfall is forecast to occur before the TSS concentration is likely to be reduced to 50mg/L ; and releasing a higher concentration of total suspended solid will result in a better environmental outcome by providing storage for the capture and treatment of runoff from the imminent rainfall and runoff; and flocculent has been applied and the concentration of TSS in the captured water has already significantly decreased. Ensure sediment basins and associated structures such as inlets, outlets and spillways are structurally sound for 10 year ARI rainfall event, under normal circumstances and for 100 year ARI rainfall event, if failure of the basin poses a threat to downstream dwellings or public safety. Ensure accumulated sediment from basins and other controls is removed and disposed of appropriately without causing water contamination. Ensure sediment does not leave the site on the tyres of vehicles. Council standards shall apply to these works unless otherwise modified herein. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care during the construction of the engineering works to ensure that Council property, road pavements or facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any damage or interference whatsoever. If any Council property or facilities should be damaged by the Applicant or any of its Consultants or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall forthwith notify the Chief Executive Officer, Sunshine Coast Regional Council, and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the Chief Executive Officer, Sunshine Coast Regional Council. All rectification works are to be completed prior to the commencement of the use or, alternatively, the Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement of the use. In the case of any emergency Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being paid prior to the commencement of the use. The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance to residents and/or tenants in the vicinity of the development. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act. Safe pedestrian access on Gateway Drive and Eumundi Noosa Road in the vicinity of the development shall be maintained at all times. Should footpath / road closures be necessary to carry out construction works, Council’s Engineering Officer - Construction (ph 07 5475 9866) must be notified prior to the proposed closure. Certification of the completed works must be provided to Council by the supervising engineer. Landscaping The site is to be landscaped in accordance with Council’s Landscaping Code and Planning Scheme Policy PSP3 on Landscaping Plants and Guidelines and generally in accordance with the Landscaping Plan, drawn by Patrick Nolan Architects, and dated 21/03/11 which are titled Proposed Bunnings warehouse Eumundi Noosa Road Noosaville QLD; and as amended by these conditions including the following plan set: Plan Rev. Plan Name Date 40-963-CD600 B Landscape Plan & Schedules 01 August 2019 40-963-CD001 B Cover Sheet, Notes & Details 01 August 2019 39.1 Safe vehicle and pedestrian sightlines to the main vehicle entry must be maintained at all times which can include pruning/removal of trees and replanting with shrubs or ground covers of local native species where garden beds are immediately adjacent to the main vehicular entry isle. The applicant shall resubmit a Landscaping Plan, by a suitably qualified landscape Architect or Horticulturist, based on approved civil works plans and the submitted Landscaping Plan, drawn by Patrick Nolan Architects, and dated 21/03/11 for approval 10 working days prior to the civil pre-start meeting, drawings that accurately detail the following items: The size and location of the biorentention basin Dimensions on planter beds and designated pedestrian access across the beds to ensure no ongoing conflicts arise between the landscaping and pedestrian access to vehicles Details of pool-style fencing and colour to the biorentention basin in order prevent public access Provide detail on structural barriers to the uppermost edge of the western biorentention basin to prevent accidental vehicle movement into the basin in addition to the pool-style fencing Details of planting to the 2.0 meter setback from the Gateway Drive boundary and the western edge of the biorentention basin showing screening vegetation with a mature height of at least 4 meters Additional planting detail to the southern most portion of the lot to screen the car park area, shown as white space on Landscaping Plan, drawn by Patrick Nolan Architects, and dated 21/03/11 as per condition 4.3 of the Court Order 2379 of 2009. Where the additional planting detail is to be provided by the external works to the site, the extent and detail of the works is to be noted on the submitted landscaping plan associated with the internal works Provide further details on the white space shown around the biorentention basin and external to the car park shown on Landscaping Plan, drawn by Patrick Nolan Architects, and dated 21/03/11. Where the additional planting detail is to be provided by the external works to the site, the extent and detail of the works is to be noted on the submitted landscaping plan associated with the internal works Provide detail and volumes on the planting media for tree species and adequate drainage to ensure the successful establishment and the ongoing advancement of the planted tree species Provide additional tree species selection to the eastern batter edge of the biorentention basin in order to soften the visual prominence of the batter. The landscape construction is to be implemented in accordance with the amended landscape plan, planting schedule and horticultural industry best practices All native plant species located in group plantings shall not be subjected to any hedging maintenance regimes Lopping, topping or pruning ( as defined in Australian Standard AS 4373 2007) in excess of 20% of the live canopy per annum is not permitted to be performed on tree species without written permission from Council unless for the purpose of emergency works All tree species shall be allowed to attain their natural height without interference with apical shoots All street trees and internal trees 45 litre and greater must be securely staked and tied to assist their growth during the establishment period The density of planting must achieve the set out requirements as detailed on the approved landscape plan All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and be visible at all times to ensure prompt access in case of emergency. The finished level of all mulch in garden beds and landscaped medians is to be a minimum of 50mm below the level of the adjacent top of kerb. All landscaping is to be constructed in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines. The works will not be accepted until the landscaping is completed. These works are also to be in compliance with the relevant conditions of Development Permit No. 2007/0256. Notwithstanding that Council has checked the plans with due care, where it is found during construction that variations from Council's standards exist, then Council standards shall apply WATER SUPPLY AND SEWER CONDITIONS Prior to Commencement of Construction The existing sewer main that traverses the site must be removed and capped under the supervision of Unitywater. Unitywater must be advised in writing of the contractor's name and the proposed date of commencement of construction. A minimum of five days notice is required to enable inspections/works to be arranged. Phone Unitywater: 07 5475 7270. During Construction A minimum horizontal clearance of 1.0 metre must be maintained between stormwater pipes greater than 225mm diameter and Unitywater water supply or sewerage infrastructure. Stormwater retention systems and gross pollutant traps must maintain a minimum of 1.5 metres horizontal clearance from a sewerage main or sewer house connection point. Proposed tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within these clearances must be low growing when mature and suitable approved varieties. During the maintenance period the applicant must carry out necessary repairs to: defects and/or damage of road works; drainage and associated work; water supply and sewerage reticulation and pump stations and associated equipment. These repairs include damage and/or alterations caused by third parties carrying out works within the development. Construction works undertaken in the vicinity of Unitywater’s existing water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs associated with repair, replacement or alteration to existing infrastructure must be met by the applicant. Prior to Commencement of Use As Constructed drawings shall be lodged in both hardcopy and ADAC digital format in GDA94 Zone 56 coordinate values. As constructed drawings will be required prior to works being accepted On Maintenance. The GDA co-ordinates and AHD levels of all permanent survey marks installed shall be provided. The surveyed location, meter numbers and readings of water meters installed by the developer must be included in the as - constructed information. referral agencies Not Applicable Approved plans/documents The approved plans and / or documents for this development approval are listed in the following tables: Approved Plans Plan Rev. Plan Name Date 4400-02CE C0103 05 GENERAL NOTES , DRAWING INDEX & STANDARD DRAWING TABLE 1 June 2011 4400-02-CE D0101 02 PROPOSED CARPARK DIMENSION PLAN, RAMP GRADE & TURNING TEMPLATES 28 February 2011 4400-02-CE C02-03 13 PROPOSED INTERNAL DRAINAGE & PAVEMENT LAYOUT PLAN & PIT SCHEDULE BY TGM GROUP 6 July 2011 4400-02-CE C03-04 09 CIVIL DETAILS SHEET BY TGM GROUP 15 July 2011 4400-02-CE C04-04 02 RETAINING WALL DETAILS 8 June 2011 Approved Documents Not Applicable PLANS/DOCUMENTS REQUIRING AMENDMENT The plans and / or documents requiring amendment for this development approval in accordance with Condition(s) are listed in the following tables: Plans Requiring Amendment Landscape Plan LANDSCAPE PLAN BY PATRICK NOLAN LANDSCAPE ARCHITECTS 21 March 2011 Amendments As required by the conditions herein Documents Requiring Amendment Not Applicable advisory notes These Advisory Notes do not form part of this approval or the conditions attached thereto. The following Advisory Notes are intended to provide guidance to the applicant where necessary and inform the applicant of actions that Council may take with respect to the development site or the approval: Council has undertaken an audit check of the Operational works drawings in relation to the proposed works. A detailed design check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date, should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Connection of the proposed works to existing water supply and sewerage reticulation can only be performed by Unitywater. A quotation for such works will be prepared upon request. Unitywater is not responsible for alterations to existing services that may be required when Unitywater is connecting new water mains to the live water network. This may involve negotiations with other service authorities. The submitted Bioretention Basin Maintenance Plan (Plan titled “(Bunnings Noosaville Eumundi-Noosa Rd Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan by TGM dated April 2011)”, is hereby endorsed by Council. In accordance with Condition No 50 of the Decision Notice for Application No. 2007/0256 the bioretention basin and Gross Pollutant Traps are to be maintained in accordance with this Bioretention Basin Maintenance Plan for the life of the development E&SC Advice Notes In this document, an effectively stabilised surface is defined as one that does not - have visible evidence of soil loss caused by sheet, rill or gully erosion or - lead to sedimentation, or - lead to water contamination Diverting clean stormwater runoff into a sediment basin is an inferior option to diverting clean stormwater around or through the site because it will cause an increase in the volume and frequency of contaminated releases from the sediment basin. For this reason, diverting clean stormwater into a sediment basin is not acceptable unless the proponent demonstrates that diverting clean stormwater around or through the site is not feasible. Compensatory controls are erosion controls, flow controls and sediment controls which compensate for the lack of sediment basin and must be focussed on controlling turbidity and not just coarse sediment. The controls are applied such that the type, timing, placement and management of controls minimise the potential for water contamination and environmental harm. This is primarily achieved by reducing the risk of erosion and subsequent sediment release, for example by turfing or mulching and managing concentrated flows in the area. Research has shown that sediment basins designed on a “batch” or total storm capture approach are only capable of treating a small percentage of the annual runoff volume without basin size becoming excessive. Innovation in sediment basin design to incorporate continuous flow treatment is likely to occur in the future and as this technology becomes available in best practice guidelines it is required that this technology be adopted where a better water quality outcome will result. In the interim the minimum basin size is as specified in the condition. Equitable Access And Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities, one or both of the following may impact on the proposed building work: The Disability Discrimination Act 1992 (Commonwealth) Anti-Discrimination Act 1991 (Queensland) Sunshine Coast Regional Council recommends that the following matters be considered to address equitable access and facilities in the building: The building and environs should be designed to meet the requirements of the Human Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises” and AS 1428.2 Applicants should be aware that a “Disability Standard on Access to premises” is currently being developed and most likely will impose changes on the Building Code of Australia Any services and facilities in the building complex should allow independent, dignified and equitable use of the services and facilities for all people. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. The plans and / or documents requiring amendment for this development approval in accordance with Condition(s) are listed in the following tables: property notes Not Applicable variation approval details Not Applicable further development permits required Not Applicable submissions Not Applicable rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Conor Neville Senior Environment Officer Enc: Appeal Rights Approved Plans/Documents DECISION NOTICE HISTORY Original Decision Notice -22 July 2011. Negotiated Decision Notice – 23 May 2011 – delete conditions 19 & 20, amend list of approved plans Decision Notice - Minor OPW11/0023.01 – 20 September 2019 – amend condition 39 and include additional condition 39.1 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 13 of 13 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 13 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW11 0023.01Related documentApplication case desk ↗
About this file
- File size
- 345 KB (small file)
- File type
- DOCX
No other editions are linked here.