Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Appendix1-ProposalPlans · MCU18/0135

Attached to the e-mail Detached House (Report, Slope Stability, Proposal Plans, Landscaping, Engineering, DA Form) - MCU18/0135.

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 22, section 1. The text section number identifies this passage in the reader.

1. FALLS, SLIPS, TRIPS                                                              2. FALLING OBJECTS                                                                                             5. MANUAL TASKS                                                                     7. CONFINED SPACES
a) WORKING AT HEIGHTS                                                                    LOOSE MATERIALS OR SMALL OBJECTS                                                                               Components within this design with a mass in excess of 25kg                      EXCAVATION
                                                                                         Construc on, maintenance or demoli on work on or around this                                                   should be li ed by two or more workers or by mechanical li ing                   Construc on of this building and some maintenance on the
  DURING CONSTRUCTION                                                                                                                                                                                   device. Where this is not prac cal, suppliers or fabricators should              building will require excava on and installa on of items within
                                                                                         building is likely to involve persons working above ground level or                                            be required to limit the component mass.
  Wherever possible, components for this building should be                              above floor levels. Where this occurs one or more of the following                                                                                                                               excava ons. Where prac cal, installa on should be carried out
  prefabricated off-site or at ground level to minimise the risk of                                                                                                                                      All material packaging, building and maintenance components                      using methods which do not require workers to enter the
                                                                                         measures should be taken to avoid objects falling from the area                                                should clearly show the total mass of packages and where
  workers falling more than two metres. However, construc on of this                                                                                                                                                                                                                     excava on. Where this is not prac cal, adequate support for the
                                                                                         where the work is being carried out onto persons below.                                                        prac cal all items should be stored on site in a way which                       excavated area should be provided to prevent collapse. Warning
  building will require workers to be working at heights where a fall in
  excess of two metres is possible and injury is likely to result from such              1. Prevent or restrict access to areas below where the work is                                                 minimises bending before li ing. Advice should be provided on                    signs and barriers to prevent accidental or unauthorised access to
  a fall. The builder should provide a suitable barrier wherever a                          being carried out.                                                                                          safe li ing methods in all areas where li ing may occur.                         all excava ons should be provided.
  person is required to work in a situa on where falling more than                       2. Provide toeboards to scaffolding or work pla orms.                                                           Construc on, maintenance and demoli on of this building will
  two metres is a possibility.                                                           3. Provide protec ve structure below the work area.                                                            require the use of portable tools and equipment. These should be
                                                                                         4. Ensure that all persons below the work area have Personal                                                   fully maintained in accordance with manufacturer’s                               ENCLOSED SPACES
                                                                                            Protec ve Equipment (PPE).                                                                                  specifica ons and not used where faulty or (in the case of                        For buildings with enclosed spaces where maintenance or other
  DURING OPERATION OR MAINTENANCE                                                                                                                                                                       electrical equipment) not carrying a current electrical safety tag.              access may be required:
  For houses or other low-rise buildings where scaffolding is                                                                                                                                            All safety guards or devices should be regularly checked and                     Enclosed spaces within this building may present a risk to persons
  appropriate:                                                                           BUILDING COMPONENTS                                                                                                                                                                             entering for construc on, maintenance or any other purpose. The
                                                                                                                                                                                                        Personal Protec ve Equipment should be used in accordance
  Cleaning and maintenance of windows, walls, roof or other                              During construc on, renova on or demoli on of this building, parts of                                          with manufacturer’s specifica on.                                                 design documenta on calls for warning signs and barriers to
  components of this building will require persons to be situated                        the structure including fabricated steelwork, heavy panels and many                                                                                                                             unauthorised access. These should be maintained throughout the
  where a fall from a height in excess of two metres is possible. Where                  other components will remain standing prior to or a er suppor ng                                                                                                                                life of the building. Where workers are required to enter enclosed
  this type of ac vity is required, scaffolding, ladders or trestles should               parts are in place. Contractors should ensure that temporary bracing                                                                                                                            spaces, air tes ng equipment and Personal Protec ve Equipment
  be used in accordance with relevant codes of prac ce,                                  or other required support is in place at all mes when collapse which                                                                                                                            should be provided.
  regula ons or legisla on.                                                              may injure persons in the area is a possibility.                                                          6. HAZARDOUS SUBSTANCES
  For buildings where scaffold, ladders, trestles are not appropriate:                                                                                                                                                                                                                    SMALL SPACES
  Cleaning and maintenance of windows, walls, roof or other                              Mechanical li ing of materials and components during construc on,                                              ASBESTOS                                                                         For buildings with small spaces where maintenance or other access
  components of this building will require persons to be situated                        maintenance or demoli on presents a risk of falling objects.                                                   For altera ons to a building constructed prior to 1990:                          may be required:
  where a fall from a height in excess of two metres is possible. Where                  Contractors should ensure that appropriate li ing devices are used,                                            If this exis ng building was constructed prior to:                               Some small spaces within this building will require access by
  this type of ac vity is required, scaffolding, fall barriers or Personal                that loads are properly secured and that access to areas below the                                             1990 - it therefore may contain asbestos                                         construc on or maintenance workers. The design documenta on
  Protec ve Equipment (PPE) should be used in accordance with                            load is prevented or restricted.                                                                               1986 - it therefore is likely to contain asbestos                                calls for warning signs and barriers to unauthorised access. These
  relevant codes of prac ce, regula ons or legisla on.                                                                                                                                                  either in cladding material or in fire retardant insula on material. In           should be maintained throughout the life of the building. Where
                                                                                                                                                                                                        either case, the builder should check and, if necessary, take                    workers are required to enter small spaces they should be
                                                                                    3. TRAFFIC MANAGEMENT                                                                                               appropriate ac on before demolishing, cu ng, sanding, drilling or                scheduled so that access is for short periods. Manual li ing and
  ANCHORAGE POINTS                                                                                                                                                                                      otherwise disturbing the exis ng structure.                                      other manual ac vity should be restricted in small spaces.
  Anchorage points for portable scaffold or fall arrest devices may have                  For building on a major road, narrow road or steeply sloping road:
  been included in the design for use by maintenance workers (if                         Parking of vehicles or loading/unloading of vehicles on this roadway                                           POWDERED MATERIALS
                                                                                         may cause a traffic hazard. During construc on, maintenance or
  required). Any persons engaged to work on the building a er comple on
                                                                                         demoli on of this building designated parking for workers and loading                                          Many materials used in the construc on of this building can cause              8. PUBLIC ACCESS
  of construc on work should be informed about the anchorage points.                                                                                                                                    harm if inhaled in powdered form. Persons working on or in the                   Public access to construc on and demoli on sites and to areas
                                                                                         areas should be provided. Trained traffic management personnel                                                   building during construc on, opera onal maintenance or demoli on
                                                                                         should be responsible for the supervision of these areas.                                                                                                                                       under maintenance causes risk to workers and public. Warning
                                                                                         For building where on-site loading/unloading is restricted:                                                    should ensure good ven la on and wear Personal Protec ve                         signs and secure barriers to unauthorised access should be
                                                                                                                                                                                                        Equipment including protec on against inhala on while using                      provided. Where electrical installa ons, excava ons, plant or loose
b) SLIPPERY OR UNEVEN SURFACES                                                           Construc on of this building will require loading and unloading of                                             powdered material or when sanding, drilling, cu ng or otherwise
                                                                                         materials on the roadway. Deliveries should be well planned to avoid                                                                                                                            materials are present they should be secured when not fully
  FLOOR FINISHES Specified                                                                conges on of loading areas and trained traffic management                                                        disturbing or crea ng powdered material.                                         supervised.
  If finishes have been specified by designer, these have been                             personnel should be used to supervise loading/unloading areas.
  selected to minimise the risk of floors and paved areas becoming                        For all buildings:                                                                                             TREATED TIMBER
  slippery when wet or when walked on with wet shoes/feet. Any                           Busy construc on and demoli on sites present a risk of collision where                                         The design of this building may include provision for the inclusion of         9. OPERATIONAL USE OF BUILDING
  changes to the specified finish should be made in consulta on with                       deliveries and other traffic are moving within the site. A traffic
  the designer or, if this is not prac cal, surfaces with an equivalent or                                                                                                                              treated mber within the structure. Dust or fumes from this material              RESIDENTIAL BUILDINGS
                                                                                         management plan supervised by trained traffic management                                                         can be harmful. Persons working on or in the building during
  be er slip resistance should be chosen.                                                personnel should be adopted for the work site.                                                                                                                                                  This building has been designed as a residen al building. If it, at a
  FLOOR FINISHES By Owner                                                                                                                                                                               construc on, opera onal maintenance or demoli on should ensure
                                                                                                                                                                                                        good ven la on and wear Personal Protec ve Equipment including                   later date, it is used or intended to be used as a workplace, the
  If designer has not not been involved in the selec on of surface                                                                                                                                                                                                                       provisions of the Work Health and Safety Act 2011 or subsequent
  finishes, the owner is responsible for the selec on of surface finishes                                                                                                                                 protec on against inhala on of harmful material when sanding,
                                                                                                                                                                                                        drilling, cu ng or using treated mber in any way that may cause                  replacement Act should be applied to the new use.
  in the pedestrian trafficable areas of this building. Surfaces should
  be selected in accordance with AS HB 197:1999 and AS/NZ                           4. SERVICES                                                                                                         harmful material to be released. Do not burn treated mber.
                                                                                                                                                                                                                                                                                         NON-RESIDENTIAL BUILDINGS
  4586:2004.                                                                             GENERAL
  STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                               Rupture of services during excava on or other ac vity creates a                                                                                                                                 For non-residen al buildings where the end-use has not been
                                                                                                                                                                                                        VOLATILE ORGANIC COMPOUNDS                                                       iden fied:
  Due to design restric ons for this building, steps and/or ramps are                    variety of risks including release of hazardous material. Exis ng                                              Many types of glue, solvents, spray packs, paints, varnishes and
  included in the building which may be a hazard to workers carrying                     services are located on or around this site. Where known, these are                                                                                                                             This building has been designed to requirements of the classifica on
                                                                                                                                                                                                        some cleaning materials and disinfectants have dangerous                         iden fied on the drawings. The specific use of the building is not
  objects or otherwise occupied. Steps should be clearly marked with                     iden fied on the plans but the exact loca on and extent of                                                      emissions. Areas where these are used should be kept well
  both visual and tac le warning during construc on, maintenance,                        services may vary from that indicated. Services should be located                                                                                                                               known at the me of the design and a further assessment of the
                                                                                                                                                                                                        ven lated while the material is being used and for a period a er                 workplace health and safety issues should be undertaken at the
  demoli on and at all mes when the building operates as a                               using an appropriate service (such as Dial Before You Dig),                                                    installa on. Personal Protec ve Equipment may also be required.
  workplace.                                                                             appropriate excava on prac ce should be used and, where                                                                                                                                           me of fit-out for the end-user.
                                                                                                                                                                                                        The manufacturer’s recommenda ons for use must be carefully
  Building owners and occupiers should monitor the pedestrian                            necessary, specialist contractors should be used.                                                              considered at all mes.
  access ways and in par cular access to areas where maintenance                         Loca ons with underground power:                                                                                                                                                                For non-residen al buildings where the end-use is known:
  is rou nely carried out to ensure that surfaces have not moved or                      Underground power lines MAY be located in or around this site. All                                                                                                                              This building has been designed for the specific use as iden fied
  cracked so that they become uneven and present a trip hazard.                          underground power lines must be disconnected or carefully                                                      SYNTHETIC MINERAL FIBRE                                                          on the drawings. Where a change of use occurs at a later date
  Spills, loose material, stray objects or any other ma er that may                      located and adequate warning signs used prior to any                                                           Fibreglass, rockwool, ceramic and other material used for thermal or             a further assessment of the workplace health and safety issues
  cause a slip or trip hazard should be cleaned or removed from                          construc on, maintenance or demoli on commencing.                                                              sound insula on may contain synthe c mineral fibre which may be                   should be undertaken.
  access ways.                                                                           Loca ons with overhead power lines:                                                                            harmful if inhaled or if it comes in contact with the skin, eyes or other
  Contractors should be required to maintain a dy work site during                       Overhead power lines MAY be near or on this site. These pose a risk                                            sensi ve parts or the body. Personal Protec ve Equipment including             10.OTHER HIGH RISK ACTIVITY
  construc on, maintenance or demoli on to reduce the risk of trips                      of electrocu on if struck or approached by li ing devices or other                                             protec on against inhala on of harmful material should be used when
  and falls in the workplace. Materials for construc on or                               plant and persons working above ground level. Where there is a                                                 installing, removing or working near bulk insula on material.                    All electrical work should be carried out in accordance with Code
  maintenance should be stored in designated areas away from                             danger of this occurring, power lines should be, where prac cal,                                                                                                                                of Prac ce: Managing Electrical Risks at the Workplace, AS/NZ
  access ways and work areas.                                                            disconnected or relocated. Where this is not prac cal adequate                                                                                                                                  3012 and all licensing requirements.
                                                                                         warning in the form of bright coloured tape or signage should be
                                                                                                                                                                                                        TIMBER FLOORS                                                                    All work using Plant should be carried out in accordance with
                                                                                         used or a protec ve barrier provided.                                                                          This building may contain mber floors which have an applied finish.                Code of Prac ce: Managing Risks of Plant at the Workplace.
                                                                                                                                                                                                        Areas where finishes are applied should be kept well ven lated during             All work should be carried out in accordance with Code of
                                                                                                                                                                                                        sanding and applica on and for a period a er installa on. Personal               Prac ce: Managing Noise and Preven ng Hearing Loss at Work.
                                                                                                                                                                                                        Protec ve Equipment may also be required. The manufacturer’s                     Due to the history of serious incidents it is recommended that
                                                                                                                                                                                                        recommenda ons for use must be carefully considered at all mes.                  par cular care be exercised when undertaking work involving steel
                                                                                                                                                                                                                                                                                         construc on and concrete placement. All the above applies.
  THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT.
  THIS INCLUDES (but is not excluded to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTAINERS, DEMOLISHERS.
                                              Revision                        Notes.                                                                                                                                             Project                            Client                     Drawing                            Date                      Author

             reitsma                                                          Figured dimensions only are to be taken from this drawing.
                                                                              All dimensions, bearings, exis ng services, mandatory council
                                                                              restraints/requirements and proposed levels are to be checked and
                                                                              verified on site by builder/client prior to commencement of works.
                                                                                                                                                    All works must comply with NCC, local authority and all relevant
                                                                                                                                                    geographical/wind category requirements. All cut and fill ba ers
                                                                                                                                                    are indica ve only and must be established and verified by
                                                                                                                                                    builder/client in rela on to proposed slab and/or floor levels
                                                                                                                                                                                                                       N         Murray Residence
                                                                                                                                                                                                                                 Lot 15 Marcus Dunes Court
                                                                                                                                                                                                                                                                    Planet Homes QLD
                                                                                                                                                                                                                                                                    Builder
                                                                                                                                                                                                                                                                                               Health & Safety Notes              21/06/2018
                                                                                                                                                                                                                                                                                                                                  Scale
                                                                                                                                                                                                                                                                                                                                                           TEAM
                                                                                                                                                                                                                                                                                                                                                          Revision
  +61 7 5491 6834       13 Ridgewood Road.                                    Any discrepancies must be communicated to the designer prior to       These drawings are to be read in conjunc on with other
                                                                                                                                                                                                                                                                                                                                  _____                          A
                                 Caloundra                                    commencement of works. Please note, builder specifica ons and          relevant consultants drawings and reports.                                   CASTAWAYS BEACH                                               Stage                              Project Number     Sheet Number
  [email protected]            QLD, 4551                                    signed contracts to take precedence over all Reitsma documenta on.
  www.reitsma.com.au              Australia                                   © Reitsma+Associates Pty Ltd. A.T.F The Reitsma Family Trust ABN 62 631 178 013 - ACN 158 385 767 QBCC Lic. No. 1234490 BDAQ Member
                                                                                                                                                                                                                                 Qld      4567                      P: 54 96 0748              WORKING DRAWINGS                   4425                     22 /23
                                                                                                                                                                                                                                                                    M: 0438 152 508

Used in these records

About this file

File size
7.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix1-ProposalPlans.pdf · 7.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.