Council archive · source document
3. Effluent Disposal Report · MCU19/0117
3/43 Hunter Street, Hervey Bay QLD
PO Box 5485, Torquay QLD 4655
Phone: 07 4125 3510
Mobile: 0414 953 963
[email protected]
ON-SITE DISPOSAL SYSTEM
5.1 Introduction
The on-site sewerage management system involves two primary components: -
treatment and disposal.
5.2 Effluent Treatment & Disposal
The treatment of each dwelling will be from a 4000 litre all- purpose septic tank.
This system is a primary treatment and will have no pumps (each site will need to
be reviewed), the gravity flow from the house to the septic tank, then to the
Advance Enviro-Septic disposal area. The required size of the effluent disposal
area from AS 1547 is 39m².
5.5 Servicing & Maintenance
The All-purpose septic tank will be pumped out each 5 years to remove the
bacterial crust, tank is to be filled with water. AES have a maintenance manual.
Regards,
Chris Searle
Director, Principal Designer
P: 0414 953 963
E: [email protected]
Page 7 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3. Effluent Disposal Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.