Decision Notice - 010.2008.00000107.001 [As Published] · 132008.107
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 6
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are titled and numbered Site Plan, 02; Proposed Lower Floor Plan,
03; Proposed Ground Floor Plan, 04; Proposed Upper Floor and Roof Plan, 05; Proposed Upper Floor
Roof Plan, 06; Western Elevation, Eastern Elevation, Section/ Elevation 5/ Section Elevation 6, 07;
Northern Elevation, Southern Elevation 08; Sections, 09 prepared by Robinson Architects and dated 08
February 2008 and as may be amended by these conditions and annotations on the plans.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service the
detached house. The tank is to be installed to ensure water from the tank can be used both:
3.1. For external use such as watering gardens, irrigation, ornamental ponds or water features, topping
up swimming pools, outdoor cleaning; and
3.2. For use in flushing of toilets internal to the building.
4. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).
5. The building height shall not exceed 8.0 metres above natural ground level.
6. Cleared vegetation is to be suitably processed by one of the following methods and removed from the
site: -
6.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in
heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
between edges of heaps.
6.2. Disposal for firewood.
6.3. Disposal for landscaping purposes.
6.4. Transport to alternative site for breaking down materials provided that all necessary permits have
been obtained to allow the alternate site to be used for this purpose.
6.5. The Applicant is advised that other methods may be considered provided full details of the method
are submitted.
6.6. The applicant is advised that burning off is an unacceptable method of disposal.
7. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
constructed under overhead electricity transmission lines, or within any easements.
8. External colours and finishes of the building shall comprise of muted/environmental tones that blend with
the natural environment.
9. Dense landscaping, comprising a mix of native coastal species of ground cover, scrubs and trees, is
provided for a width of 5m from the seaward or rear boundary of the site to provide adequate landscape
buffering to protect the coastal dune systems. Refer to Table 3.2 and 3.2 of PSP3 Landscaping Plants
and Guidelines for suitable coastal species.
Currency
10. The Development Permit for a material change of use lapses if the use has not happened by 13 February
2012, unless an application to extend the currency is approved by Council.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec121402\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000107.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 26 KB (small file)
- File type
No other editions are linked here.