Council archive · source document
SUPERSEDED - Generally in Accordance - Plans - MCU22/0016.01
Plans and drawings: the text below has words only, no drawings.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
13.00
12.00
10.0
11.50
10.2
12
11.00
10.75
12.25
11.75
11.25
10.50
12.
9.75
9.50
.75
90°0'
50
0
5
33.561
1.5m SIDE SETBACK
2m SIDE SETBACK
COUNCIL DA CONDTIONS
Landscaping
2°13'20"
15.088
8.
00 7. A minimum of 20% of the site must be retained
as soft landscaping.
8. A minimum 5 metre wide plantings must be
provided for the full length of the reserve/
182°13'20"
seaward boundary (exclusive of where the
15.088
SITE COVER THIS LEVEL PROPOSED pool and stairs encroach within this area). The
garden must consist of a mix of native shrubs
193.17 m2 RESIDENCE and ground covers that have fire resistance
6m FRONT SETBACK
and in accordance with Planning Scheme
Lot 5 on P9313 Policy PSP 2 – Landscaping.
EXISTING 9. Existing trees on the site must be retained,
except where required to be removed to
12
.75 POOL accommodate the approved dwelling.
12
10. Existing vegetation in the road reserve must
.75
be retained (exclusive of access driveway),
2m SIDE SETBACK unless written authorisation from Council is
1.5m SIDE SETBACK granted for the clearing.
11. The paperbark located in the road reserve may
LOWER LEVEL GFA 33.561
be removed to facilitate new access. Replace
with 2 x 45L trees in the road reserve adjacent
to the front boundary of the property with an
9.5
9.2
11.25
9.7
SCALE 1:200 @ A3
10.75
10.50
8.25
9.0
8.75
11.50
11.75
8.50
270°0'
10.25
11.
appropriate species in accordance with
0
5
5
0
0 0
Planning Scheme Policy PSP 2 – Landscaping
that is compatible with the height of
SITE PLAN
Site Access and Driveways Stormwater Drainage powerlines.
12. Trees to be retained must be protected from
19. One sealed access driveway must be provided from Plover Street to all 20. The site must be provided with a stormwater clearing or construction activities by:
SCALE 1:200 @ A3 parking and manoeuvring areas of the development. The driveway must be
constructed in accordance with an Operational Works approval and Council’s
drainage system connecting to a lawful point of
discharge. The works must be undertaken
a. clearly marking vegetation to be retained
with flagging tape
Standard Drawing RS-049 and RS-050 and any associated addendum. generally in accordance with the Stormwater b. installing protective fencing around the drip
Where existing access occurs and is repositioned, the existing access must Management Report - reference S22-040 and line of the vegetation
be reinstated as grass and street trees as required by Condition 11 of this drawing number S22-040-P01 prepared by c. restricting stockpiling, storage and vehicle
approval. Westera Partners dated April 2022. parking to those areas which are already
Landscaping Area180.11 m2 cleared
d. using low impact construction techniques
around vegetation.
13. Screening vegetation must be planted
GFA PER LEVEL SITE COVER SITE COVER as a % of SITE
between the pool and the southern boundary;
and between the dwelling and the northern
boundary, in accordance with Council’s
GFA THIS LEVEL 176.67 m2 Planning Scheme Policy PSP2 - Landscaping.
The planted vegetation must have a minimum
SITE COVER LOWER SITE AREA 506 m2 pot size of 10 litres and consist of native,
LOWER LEVEL endemic species with a mature height of not
193.17 SITE COVER LOWER 193 m2 38% less than 2.5 metres.
160.48 14. All landscape works must be established and
SITE COVER MAIN 217m2 42% maintained in accordance with the approved
MAIN LEVEL SITE COVER MAIN
SITE COVER UPPER 67m2 13% design for the life of the development, and in a
214.87 manner that ensures healthy, sustained and
176.67 vigorous plant growth. All plant material must
LANDSCAPING TOTAL 171m2 36% be allowed to grow to full form and be
UPPER LEVEL SITE COVER UPPER refurbished when its life expectancy is
reached.
49.40 61.90 15. All landscape works must be maintained
SITE COVER THIS LEVEL 214.87 m2 generally in accordance with the approved
WINTER design for the life of the development.
SUN PATH
Coastal Protection
MAIN LEVEL GFA
)
Sett am
in g5 in g (7
pm Ris 16. External colours and finishes of the building
must comprise of muted/environmental tones
SCALE 1:200 @ A3 MER
N
SUM PATH that blend with the natural environment.
SUN 17. Proposed retaining walls on the rear boundary
p m Ris are to be constructed in such a way that there
in
.30 g (6
CUT AND FILL in g5 .30 is no impact on adjoining vegetation within the
Sett am
)
reserve. Footings are to be wholly located
main site cut within the site.
MAIN CUT 149 m2 149m2
BA/C1 For Buliding Approval & construction
FILL: issue issue / amendment
2
UNDER SLAB FILL: 33 m 22.02.23 LF AB JH
BACK YARD FILL: 37 m2 issue date drawn by
FRONT PLANTER FILL: 8 m2 client
Ingrid & Nick Hutton
BALANCE OF CUT & FILL: 71 m2 to remove from site project
Hutton Plover St
location
2 24 Plover St Peregian Beach
GFA THIS LEVEL 49.40 m
GFA AND SITE COVER
Aboda Lee Foster • director Scott Falconer • director
Design p - 0424 620 247 p - 0431 267 157
back yard fill Group e - [email protected]
the aboda design group trust
ABN 56 266 884 746
e - [email protected]
Level 2 1794 David Low Way Coolum Beach,
Q. 4573. PO box 2449 Noosa Heads Q 4567
37m2 t/a aboda design group • BSA License -150580097 • www.aboda.com.au
• This drawing is to be read in conjunction with engineers drawings & reports • Construction
SITE COVER THIS LEVEL 61.90 m 2 front planter fill to comply with all relevant SAA & NCC Codes & standard Bldg By-law 1975 & as amended •
Copyright for design & drawings remain the property of the authors • Verify all dimensions on
site prior to commencement of any works • These drawings are not to be used for scaling.
underslab fill 8m2 scale as shown @ A3 issue
UPPER LEVEL GFA
NOOSA COUNCIL drawing no.
33m2 BA/
SCALE 1:200 @ A3
GENERALLY IN ACCORDANCE
MCU22/0016.01 4 APRIL 2023
WD.104 C1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 5 (of 15)
Section 2
D G C
A B WD.602 C WD.605 D WD.601 E F G
N 3° 16' 8" E
2,300 5,910 2,800 8,590 3,700 4,480
natural ground sleeper steppers by landscaper
continue block nib past retaining wall
corner as return for sleeper ventilated gate
13.00
retaining wall
12
12.00
10.0
11.50
11.00
1
10.75
12.25
11.75
11.25
10.50
12.
DET-05
9.75
0.25
70
.75 BLK
9.50
WD.702
.3
50
0
90°0'
11
OW
33.561
+T
sleeper retaining wall (over)
LANDING FFL 9.870 timber treads + risers
BLK REN ASD oxide concrete BLK REN AL BLK REN AL BLK REN
CS
LINK DECK TD STR3 R:184
<1m
AS G:250
rear boundary wall
DP
1.5m SIDE SETBACK R:180
DP
1 1
W32 W33 W34 W34.5 G:250 8 7 6 5 4 3 2 1
TIM 1 screen
PB 2 planting
zwift JOIN
timber treads + risers
VENTILATED station STR3
robe ZACS
BLK CRAWL b. SHR RM niche AFW LEVEL TURF m/h
2,890
2,890
H waterproof membrane/ SPACE FFL 10.770 JOIN
ROOM JOIN H
W35
WD.605 drainage & protected FFL 10.770
sh.
FFL 10.770 approx manhole location, WD.605
tv FT <1m not located by surveyor
termite barrier to BCA/AS REN BLK CRAFT/ PB
TF
TIM no balustrade
under
JOIN
SPARE ROOM app.
w/m
D14
wc no balustrade ensure pool
<1m
2 2
FFL 10.770 FFL 10.410 enclosure
mech. PDR
2°13'20"
TIM compliance to
15.088
TF vent req. hwsa W36 <1m
JOIN
POOLSIDE 8. fencejunction
D15
E desk 00 E
dock
door
JOIN
WD.603 h.w.
D21
hwsa PB b. DECK TD WD.603
TIM
cbd. lift off D16 FFL 10.410
2,970
2,970
BLK D12 artwork
6m FRONT SETBACK
hinges
BLK
BIKE hwsa POOL LIVING/ BAL
D13
STORE MPR <1m
W37
R:169
G:250 DET-14 DET-02
DP lift plant STAIR STR2
HR
WD.707 STR3
182°13'20"
WD.701
3 under up to
3
15.088
partition slider
A A
0
main
.7 7
11 10 9 8 7 6 5 4 3 2 1 FFL 10.770
WD.601 WD.601
10
PF PF
retain EX pool shower
OW
TF
mechanical
s /w
pool fence
STORE R:180
+T
future lift door
in
exhaust vent 150 step G:250
sla
BLK
pool fence
F pool window F
bo
D20
future lift tv
ve
PB
WD.604 shaft hwsa kitchenette WD.604
r
6m REAR SETBACK
WT
set down to future lift TF 2 1
d.w.
w
s DP in wall PB TIM
shaft (to lift manuf. FFL 10.110 JOIN fr.
W38
pool windo
PF
13" E
WORKSHOP specification)
DP in wall
JOIN W39 pool gate
1 2 3
N 8° 47'
EPO PB HALL 700 deep for
D17
5,870
5,870
R:170 hwsa AFW PF
FFL 10.770 JOIN
D23
D22
TIM
rear boundary wall
FFL 10.260 hwsa G:250
STR2
a/c over
under EX. POOL
12 1
.75 ABBYS
nce
walls painted BATH
W40
BLK
towel rail
12
ROOM
as pool fe
0
blockwork
.7 7
.75
JOIN
10
B FFL 10.770 B
tiled niche
sh. FFL 10.770 TF
i ng
workshop sink, drain to sewer b.
WD.602 WD.602
op
waterproof membrane/ FFL 10.770
OC
BLK FT
pool shell
AFW PF
drainage & protected
+T
drop in WT
termite barrier to BCA/AS
s.
bath 2m SIDE SETBACK
tv split system a/c
no pool fence
towel rail W44 wc
pool fence approx sewer
4 4
TIM 1.5m SIDE SETBACK
W41 pool gate pool shell as pool fence house connection
DP W43 step DP sh W42
BLK REN AFW BLK RENAFW <1m location
1,410
1,410
fill BLK BLK REN AFW (invert RL 7.32)
FT TD pool equipment zone, under pool
FFL 10.770 FFL 10.770 natural grade
fall
5 5
+T
33.561
OW
270°0' no pool fence side boundary wall and fence
9.5
9.2
9.7
11.25
10.75
8.25
8.75
9.0
10.50
Section 3
11
11.50
8.50
11.75
11.
10.25
.5
0
5
5
60
waterproof membrane/
0
0 0 ensure pool
drainage & protected planter with ag. drainage enclosure
outdoor shower BAL
termite barrier to BCA/AS sump to SW. compliance to
fencejunction
NOOSA COUNCIL 2,300 5,910 2,800 8,590 3,700 4,480
GENERALLY IN ACCORDANCE G C
A B D
WD.602 C WD.605 D WD.601 E F G BA/C1 For Buliding Approval & construction
MCU22/0016.01 4 APRIL 2023 issue
22.02.23
issue / amendment
LF AB JH
EXT. FINISHES LEGEND FCA fibre cement awning. PF compliant pool fencing WALL LEGEND GENERAL LEGEND FLOOR FINISH LEGEND issue date
client
drawn by
D04 denotes door number Ingrid & Nick Hutton
AS aluminium screen. FC fibre cement ext. cladding. PW parapet wall. RC masonry blockwork FT1 FT2 Indicates extent of TILE
project
WINTER
SUN PATH AL aluminium louvres, refer sched. FG fascia gutter. PS patio slab. W04 denotes window number Hutton Plover St
RC pool shell/off form concrete location
RL 17.200 C Indicates extent of CARPET
Sett am
) ASD aluminium sliding door. FT1 floor tile (no refers to type). PV photovoltaic cells. denotes finished floor level 24 Plover St Peregian Beach
in g5 in g (7 90MM ext. timber frame
pm Ris
AFD aluminium framed door. fire fireplace RWT rain water tank. + RL 17.700 denotes spot level
TF TD LOWER LEVEL PLAN
Indicates extent of TIMBER.
MER
SUM PATH N AFW aluminium framed window. flue flue kit SBJ silicone butt jointed glass. 70MM int. timber frame 50 step denotes change in level Aboda Lee Foster • director Scott Falconer • director
SUN Design p - 0424 620 247 p - 0431 267 157
pm Ris Indicates extent of GS DR Indicates extent CONCRETE Group e - [email protected]
in g 5.3
0 in g (6
.30
BA sun control battens, refer detail. GS garage slab. SP structural post, refer engineer. chs shs structural posts - refer fw
denotes floor waste the aboda design group trust
e - [email protected]
Level 2 1794 David Low Way Coolum Beach,
Sett am
) engineer. ABN 56 266 884 746 Q. 4573. PO box 2449 Noosa Heads Q 4567
denotes hard wired smoke
BAL1 balustrade-(no refers to type). HWS hot water service. SF structural footing, ref. eng. t/a aboda design group • BSA License -150580097 • www.aboda.com.au
BLK masonry blockwork. HR handrail. TIM timber cladding. hwsa
alarm BCA 3.7.2 min
300mm from wall FINISH CODE LEGEND • This drawing is to be read in conjunction with engineers drawings & reports • Construction
to comply with all relevant SAA & NCC Codes & standard Bldg By-law 1975 & as amended •
Copyright for design & drawings remain the property of the authors • Verify all dimensions on
site prior to commencement of any works • These drawings are not to be used for scaling.
5° denotes direction of roof fall denotes additional 'extent' information
C carpet LPG LPG gas bottle. TD timber deck.
(xxxxxxxx) scale as shown @ A3 issue
CS concrete slab. NGL NRG board
TF timber floor. MR denotes roof material denotes finish, refer 1000 drawing no.
BA/
XX
LOWER LEVEL PLAN WD.202
series drawings for schedule
DP down pipe. MR1 metal roof - (no refers to type).
TFD timber framed door
driveway slab. natural ground line.
VER vergola. JXX
denotes item and number.
refer to Joiner for details
C1
SCALE 1:100 @ A3 DS NGL
Section 4
D G C
A B WD.602 C WD.605 D WD.601 E F G
N 3° 16' 8" E
2,300 5,910 2,800 8,590 3,700 4,480
steppers by landscaper
solid timber framed wall
13.00
as fall protection
12 Annotated by Council: windows 7 &
12.00
10.0
11.50
11.00
10.2
10.75
12.25
11.75
11.25
10.50
12.
9.75
.75
9.50
8 to 90°0'
have external screening to
50
0
5
prevent
33.561overlooking
timber clad fence ramp to back
TIM NOTE: MINIMUM 20% OF THE
yard
0
0
SITE MUST BE LANDSCAPED IN
.83
.83
TS
concrete sleeper retaining wall BLK REN
13
13
ACCORDANCE WIT DA
0
1.5m SIDE SETBACK
OW
OW
.83
1.2 h privacy screen & balustrade REN PW
BLK CONDITION 7
14
+T
+T
1 1
OW
2m SIDE SETBACK
+ seat 13.300
W07 W08
sump
+T
line of hood over
TIM TIM ASD grated drain REN NRG
sheer curtain dock
NRG REN
DP
fall FT BLK
join
fireplace BLK DP
AFW
COURTYARD daybed tv daybed
2,890
2,890
H ASD custom aluminium 'blade' H
TD
W03
W04
WD.605 fall approx manhole location, WD.605
MEDIA TF fall
DET-03 balustrade, refer detail
not located by surveyor
150 step down to turf, DET-15 WD.701
W06
retra
fall FFL 12.970
flush
to NCC 3.1.3.3 WD.708
ctab
150 flush
DP concealed in wall frame
FORMAL
W09
step
2 2
flush
hwsa
le
stud frame PB
2°13'20"
fall
fall
awnin
ASD
LIVING TF DECK
15.088
TD tv W05 flush hwsa
FFL 13.830 8.
g
E REN BLK FT BAL 00 E
dr.
TIM
WD.603 D02 cav. slider art display 1 2 3 4 5 r ASD
WD.603
ve FFL 13.830
W01
step
150
id o
AFW
TD + seat 13.300
6m REAR SETBACK
BLK
DET-03
vo invisible corner
2,970
2,970
WD.701 STAIR
AFD FOYER TF R:172 HR
ENTRY G:350 STR2 balustrade, refer detail
W02
grated drain to FFL 12.970
er
ov
dr.
FT stormwater AS
id
DET-14
vo
PB R:169
mailbox FFL 12.970 flush G:250 STR1 WD.707
to R:173
artwork
s/w in slab over
STAIR
182°13'20"
TIM STR2
3 3
BLK from
gate upper G:250 in wall
15.088
A REN BLK DP join DP lower13 12 11 10 89 78 6 5 4 3 2 1 artwork DP W10 A
WD.601 intercom WD.601
shs silicone
D03 pull-out butt joint
cav. slider STORE
W11
bifold by
future lift door
AS TIM flush Cabinetmaker pantry AFW
DET-01 join
F PB BLK PB
flashing F
D04
future lift
0
.83
WD.701 hwsa built-
D05
WD.604 light weight floor infill shaft WD.604
14
hwsa join in fr
OW
The driveway custom tilt PB FFL 12.970 STUDY dr.
+T
13" E
must be door, ref detail PB island
constructed in fall fall D06 DP in wall
join
DINING TF
N 8° 47'
accordance with BLK REN
FFL 13.830
dr.
5,870
5,870
mw/ DET-07
W12
an Operational rc beam PB WD.704 EX. POOL
6m FRONT SETBACK
Works approval oxide concrete over, ref. FT ov
sh. AFW
(below)
w/m
and Council’s DRIVEWAY CS
12 GARAGE eng. PANTRY
Standard Drawing LDY/ niche
dr.
.7
D07
D01
5 builder to allow for
RS-049 and EP join
KITCHEN TF
12
RS-050 and any grated drain to dehumidifier with BATH dr. join TF
.75
D08
FFL 12.970 FFL 13.830
linen
associated stormwater drain to ldy cbd. flashing flashing
addendum
B FFL 13.830 B
WD.602 PB
WD.602
0
basin with retractable d.w. ct/rh
.53
W13
fall fall sprayer tap s s join fr. fr.
16
beer
OW
step BLK VB b. join wc 2m SIDE SETBACK
+T
RC beam W15 W14
approx sewer
4 TIM
over, ref. eng.
line of roof over
1.5m SIDE SETBACK house connection 4
+T
+T
DP W17 W16
location
OW
OW
gate BLK AFW TIM BLK RENAFW AFW silicone butt joint
BIKE
Section 5
1,410
1,410
xisting tree (invert RL 7.32)
14
14
BLK
BLK
.83
.83
BINS painted flush joint blockwork STORE
hc
REN
planter planter REN BLK
0
0
REN
TIM AS
5 33.561
270°0'
5
9.5
9.2
9.7
11.25
10.75
8.25
existing trees
8.75
9.0
10.50
11.50
8.50
11.75
11.
10.25
0
5
5
(adjoining property) BLK REN
0
00
QDC COMPLIANT GARAGE 6,840
NOOSA COUNCIL 2,300 5,910 2,800 8,590 3,700 4,480
GENERALLY IN ACCORDANCE G C
MCU22/0016.01 4 APRIL 2023 A B D
WD.602 C WD.605 D WD.601 E F G BA/C1
issue
For Buliding Approval & construction
issue / amendment
22.02.23 LF AB JH
EXT. FINISHES LEGEND FCA fibre cement awning. PF compliant pool fencing WALL LEGEND GENERAL LEGEND FLOOR FINISH LEGEND issue date
client
drawn by
D04 denotes door number Ingrid & Nick Hutton
AS aluminium screen. FC fibre cement ext. cladding. PW parapet wall. RC masonry blockwork FT1 FT2 Indicates extent of TILE
project
WINTER
SUN PATH AL aluminium louvres, refer sched. FG fascia gutter. PS patio slab. W04 denotes window number Hutton Plover St
RC pool shell/off form concrete location
RL 17.200 C Indicates extent of CARPET
) ASD aluminium sliding door. FT1 floor tile (no refers to type). PV photovoltaic cells. denotes finished floor level 24 Plover St Peregian Beach
Sett
ing g( 7am
5p Ris
in 90MM ext. timber frame
m AFD aluminium framed door. fire fireplace RWT rain water tank. + RL 17.700 denotes spot level
TF TD MAIN LEVEL PLAN
Indicates extent of TIMBER.
MER
SUM PATH N AFW aluminium framed window. flue flue kit SBJ silicone butt jointed glass. 70MM int. timber frame 50 step denotes change in level Aboda Lee Foster • director Scott Falconer • director
S U N Design p - 0424 620 247 p - 0431 267 157
pm Ris Indicates extent of GS DR Indicates extent CONCRETE Group e - [email protected]
ing
5.3
0 ing
(6.3
0a
BA sun control battens, refer detail. GS garage slab. SP structural post, refer engineer. chs shs structural posts - refer fw
denotes floor waste the aboda design group trust
e - [email protected]
Level 2 1794 David Low Way Coolum Beach,
Sett m)
engineer. ABN 56 266 884 746 Q. 4573. PO box 2449 Noosa Heads Q 4567
denotes hard wired smoke
BAL1 balustrade-(no refers to type). HWS hot water service. SF structural footing, ref. eng. t/a aboda design group • BSA License -150580097 • www.aboda.com.au
BLK masonry blockwork. HR handrail. TIM timber cladding. hwsa
alarm BCA 3.7.2 min
300mm from wall FINISH CODE LEGEND • This drawing is to be read in conjunction with engineers drawings & reports • Construction
to comply with all relevant SAA & NCC Codes & standard Bldg By-law 1975 & as amended •
Copyright for design & drawings remain the property of the authors • Verify all dimensions on
site prior to commencement of any works • These drawings are not to be used for scaling.
5° denotes direction of roof fall denotes additional 'extent' information
C carpet LPG LPG gas bottle. TD timber deck.
(xxxxxxxx) scale as shown @ A3 issue
CS concrete slab. NGL NRG board
TF timber floor. MR denotes roof material denotes finish, refer 1000 drawing no.
BA/
XX
MAIN LEVEL PLAN WD.203
series drawings for schedule
DP down pipe. MR1 metal roof - (no refers to type).
TFD timber framed door
driveway slab. natural ground line.
VER vergola. JXX
denotes item and number.
refer to Joiner for details
C1
SCALE 1:100 @ A3 DS NGL
The text continues on section 6.
Used in these records
SUPERSEDED - Generally in Accordance - Plans - MCU22/0016.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.