3200 4795 4795 4795 4795 4795 8565
37800 - SOLAR PANELS
300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300
485 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 500
C A E D C A
05-01 05-01 05-01 05-01 05-01 05-01
BC01
1A FL01 FL01 FL01 FL01 1A
FALL
FALL
RL 19.820
550
02
PFC1 APRON FLASHING (TO MATCH BC01)
SC
02
02
02
02
02
RL 19.870
SC
SC
SC
SC
SC
DRESS DOWN OVER SKYLIGHTS
2000
BC01
BC01
5020
BC01
PFC1
PFC1
2000
SL SL SL SL
FL01 FL01
AWN04
1B 1B
02
2000
C
EG
DASHED LINE OF WALLS
BELOW
4300 - SOLAR PANELS
3950
16000 - SOLAR PANELS
SL
2000
190 CONCRETE BLOCK UPSTAND ULTRA COLORBOND KLIP- 300
LOK ROOF SHEETING 1000 1000 1000 1000
WALL BETWEEN PLANT DECK
SLAB AND ROOF SHEETING ABOVE INSTALLED TO
MANUFACTURERS
440
ALL-WEATHER BOOT AROUND SPECIFICATION & BC01
EG
PENETRATION OF COLUMNS ENGINEER'S DETAILS
01
01
01
SCR01
02
THROUGH ROOF
SC
FL01
1C 1C
SC
SC
2000
DASHED LINE OF WALLS BELOW
3˚ FALL
DP PENETRATIONS THROUGH PLANT W ROOF PENETRATIONS. REFER TO
2000
GR01
DECK SLAB TO STRUCTURAL AND HYDRAULIC AND MECHANICAL
B MECHANICAL ENGINEER'S DETAILS B ENGINEER DRAWINGS FOR
05-01 (VERIFY LOCATION AND QUANTITY 05-01 PLACEMENT AND DETAILS
PFC1
PFC1
BEFORE POUR). 150 MIN. HIGH HOB SL SL
4040
3˚ FALL
DOWNPIPE TO DISCHARGE SL AROUND EACH
SCR01
2000
FALL FALL AWN04
BC01
THROUGH ROOF DECK CLEAR OF
4600
FW
8000 - SOLAR PANELS
ROLLER DOOR BELOW AND RUN SCR01 SCREENING AROUND
2000
BC01
BELOW SLAB IN CEILING SPACE SHADED AREAS INDICATE EXHAUST FLUE. HEIGHT OF
FALL
TO EXTERNAL WALL. CO- LOCATION OF MASONRY SCREEN TO MATCH HIGHEST
BC01
ORDINATE WITH SERVICES TO BLADE WALLS BELOW ELEMENT OF FLUE
PREVENT CONFLICT PENETRATIONS THROUGH
01
01
BC01
BC01
1D
PFC1 PLANT ROOF ABOVE
1D
SC
SC
2000
DASHED LINE OF PLANT ROOF DECK
ABOVE
2000
RL 19.770
EXHAUST FLUES TO MECHANICAL
FALL
DASHED LINE OF WALLS 1500 ENGINEER'S SPECIFICATIONS
BELOW
ULTRA COLORBOND KLIP-LOK
4200
BC01
SCR01
FALL FALL
2000
ROOF SHEETING INSTALLED TO
3˚ FALL
SELECTED TRAFFICABLE
MEMBRANE TO PLANT ROOF FW BLOCKWORK SIDEWALLS OF PLANT DECK MANUFACTURERS SPECIFICATION
& ENGINEER'S DETAILS
2000
TO EXTEND TO UNDERSIDE OF ROOF
REFER TO HYDRAULIC SHEET. ALLOW FOR SERVICE ROOF PENETRATIONS REFER TO
HYDRAULIC AND MECHANICAL
SC FALL
ENGINEERS DRAWINGS FOR ALL PENETRATIONS WHERE REQUIRED (REFER OUTLINE OF DECK BELOW
ROOF PENETRATIONS MECHANICAL ENGINEER'S DRAWINGS) ENGINEERING DRAWINGS FOR
1060
01 PLACEMENT AND DETAILS
01
01
01
RWH HOB HOB RWH
SC
SC
SC
1E SCR01
EG
1E
440
DP GR01 DP DP GATE DP DP GR01 DP GR01 DP EG RO
(UNDER) (UNDER) (ABOVE) SCR01 (UNDER) (UNDER) (UNDER) (UNDER)
LINE OF BLOCKWORK
LINE OF BLOCKWORK UPSTAND UPSTAND WALL BENEATH
FALL
3350
WALL BENEATH ROOF
GREEN GREEN ROOF
FALL
FALL
FALL
FALL
FALL
FALL
FALL
ROOF ROOF DASHED LINE OF WALL
BELOW
RL 19.770 RL 19.770
BW01
BW01
FALL
FALL PD FALL PD FALL FALL FALL FALL FALL FALL PD FALL FALL PD FALL FALL FALL
PD PD PD
1F FW 1F
PD
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
SHADED AREAS INDICATE
LOCATION OF MASONRY BLADE
WALLS BELOW SP BW01
PENETRATION THROUGH PLANT
SELECTED TRAFFICABLE DECK FOR AMENITIES SHADED AREAS INDICATE
SELECTED TRAFFICABLE GRADE SURFACE OF DECK TO SELECTED TRAFFICABLE LOCATION OF MASONRY
MEMBRANE TO GREEN ROOF MEMBRANE TO PLANT ROOF VENTILATION. 150 MIN. HIGH HOB PLANTER DRAINS MEMBRANE TO GREEN ROOF
AROUND BLADE WALLS BELOW
01 ROOF PLAN / PLANT DECK
- SCALE 1:100
101 102 C
05-01 103 A
05-01 104 105 E
05-01 106 107 05-01
D
108 102 C
05-01 103 A
05-01 104 105
FUTURE HIGH LEVEL
WINDOWS AND PROVIDE
POWER TO EACH BAY 02 PLANT ROOF PLAN
1A - SCALE 1:100
FALL
FALL
RL 19.820
550
02
PFC1
SC
02
02
02
02
02
RL 19.870
SC
SC
SC
SC
SC
2000
DROP POST FROM STRUCTURAL BEAM OVER 50 HIGH HOB
ROOF PLAN LEGEND
5020
(REFER TO STRUCTURAL ENGINEER'S DETAILS)
FRAMED HORIZONTAL AWNING
PFC1
PFC1
2000
BLADE, CEMINTEL SIDES AND
UNDERFACE, COLORBOND TOP
AIR CONDITIONER CONDENSOR
PD PLANTER DRAIN
RO ROOF DRAIN OUTLET
1B
02
2000
RWH RAIN WATER HEAD
SC
PFC1 SP SPITTER
FINISHES :
EXPOSED STEEL FRAMEWORK
3950
AWN01 CUSTOM WIDTH HEKA HOOD
16000 - SOLAR PANELS
(REFER TO STRUCTURAL
2000
ENGINEER'S DRAWINGS FOR AWN02 OFF FORM REINFORCED CONCRETE SUSPENDED
SIZING)
SLAB
OUTLINE OF BUILDING BELOW BC01 FOLDED 0.55 BMT COLORBOND BARGE FLASHING -
WOODLAND GREY
01
01
01
02
SC
1C
SC
FL01 FOLDED COLORBOND TWO PART FLASHING FIXED
SC
SC
2000
PFC1 TO SUPPORT SUBSTRATE
DP
- WOODLAND GREY
GR01 FOLDED nom 2mm TH POWDERCOATED ALUMINIUM
GUTTER WITH INTERNAL SUPPORT BRACKETS
PFC1
PFC1
4040
- WOODLAND GREY - SATIN
2000
FALL FALL
FW BW01 BLOCKWORK WITH ROCKCOTE SMOOTH SET
POLISHED CONCRETE RENDER OR APPROVED
FALL
SIMILAR
01
01
1D
PFC1 PLANT NOTE : REFER TO HYDRAULIC ENGINEER'S DRAWINGS FOR
SC
SC
2000
DECK GUTTER AND DP SIZES
RL 19.770
01 AWNING AND FRAMEWORK See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposed Plans 132005.1133.10.pdfRelated documentApplication case desk ↗
About this file
- File size
- 23.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.