Reference Document MCU22/0102 Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Verification Certificate – SQIDEP VC
Reference Number: SA-2019/009/VC
Technology Information
Applicant’s
Verified Total Suspended Solids (TSS) 86 %
Performance Total Phosphorus (TP) 65 %
Claims Total Nitrogen (TN) 50 %
Total Petroleum Hydrocarbons 0 %
Gross Pollutants 99 %
Others, please detail:
____________________________________________________
Maintenance
performed The inlet chamber and StormSack was maintained once annually during monitoring;
during No maintenance was performed on the planted media;
monitoring The SPELBasin® Technical Guideline recommends maintenance of the inlet chamber and
Stormsack quarterly;
Verified The submitted, calibrated MUSIC model provides a method of modelling the technology
method to with 1 Generic node as per the image below;
model in
MUSIC
The input criteria for the node is;
o Generic node
High Flow Bypass 0.01 m3/s
Gross Pollutants Input = 150 mg/L Output = 1.5 mg/L
Total Suspended Solids Input = 1000 mg/L Output = 140 mg/L
Total Phosphorus Input = 10 mg/L Output = 3.5 mg/L
Total Nitrogen Input = 50 mg/L Output = 25 mg/L
Conditions The limitations of the acceptance of these claims include;
The results are for a road-based catchment. The results lie within acceptable inflow
limits for this type of catchment and based on the analysis are found to be acceptable.
This does not necessarily relate to other catchment types, though it noted that hard
stand catchments will behave similarly. Cleaner, roof catchments
may not achieve the same pollutant reduction targets;
The results are for a hydraulic loading rate up to 250m/year. Should the hydraulic load
rate exceed this, the results and life expectancy of the media would be expected to
decline in line with excessive loading on the device;
The results are reliant on the maintenance of the device being consistent with the
manufacturers guidelines and those that are contained in the report. Most importantly
2
© Stormwater Australia
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.