Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Reference Document MCU22/0102 Stormwater Management Plan

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                       Verification Certificate – SQIDEP VC
                                                                                       Reference Number: SA-2019/009/VC

  Technology Information
   Applicant’s
   Verified              Total Suspended Solids (TSS) 86 %
   Performance           Total Phosphorus (TP)        65 %
   Claims                Total Nitrogen (TN)          50 %
                         Total Petroleum Hydrocarbons 0 %
                         Gross Pollutants             99 %
                         Others, please detail:

                         ____________________________________________________



   Maintenance
   performed                  The inlet chamber and StormSack was maintained once annually during monitoring;
   during                     No maintenance was performed on the planted media;
   monitoring                 The SPELBasin® Technical Guideline recommends maintenance of the inlet chamber and
                                Stormsack quarterly;



   Verified                   The submitted, calibrated MUSIC model provides a method of modelling the technology
   method to                    with 1 Generic node as per the image below;
   model in
   MUSIC




                               The input criteria for the node is;
                                    o Generic node
                              High Flow Bypass                                 0.01 m3/s
                              Gross Pollutants                Input = 150 mg/L         Output = 1.5 mg/L
                            Total Suspended Solids           Input = 1000 mg/L         Output = 140 mg/L
                              Total Phosphorus                 Input = 10 mg/L         Output = 3.5 mg/L
                               Total Nitrogen                  Input = 50 mg/L          Output = 25 mg/L



   Conditions            The limitations of the acceptance of these claims include;
                               The results are for a road-based catchment. The results lie within acceptable inflow
                                limits for this type of catchment and based on the analysis are found to be acceptable.
                                This does not necessarily relate to other catchment types, though it noted that hard
                                stand catchments will behave similarly. Cleaner, roof catchments
                                may not achieve the same pollutant reduction targets;
                              The results are for a hydraulic loading rate up to 250m/year. Should the hydraulic load
                                rate exceed this, the results and life expectancy of the media would be expected to
                                decline in line with excessive loading on the device;
                              The results are reliant on the maintenance of the device being consistent with the
                                manufacturers guidelines and those that are contained in the report. Most importantly
                                                                                                                          2
© Stormwater Australia
Log in to download the original file

Reference Document MCU22_0102 Stormwater Management Plan.pdf · 29.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.