Skip to the record
Every meeting, every word.

Original source · versioned page text

Reference Document MCU22/0102 Stormwater Management Plan

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
FEATURES

 

 

 

 

0d Pre-treatment chamber 6 Pre-filter cartridge
Captures incoming runoff and contains the first three Provides the third stage of treatment by physically and
stages of treatment. chemically capturing fine TSS, metals, nutrients, and
bacteria.
@ Grate type catch basin inlet @ Wetland chamber
A standard grate type traffic rated catch basin opening directs Provides the final stage of treatment through a
stormwater into the system. combination of physical, chemical and biological
processes.
© Catch basin insert filter Q Discharge chamber
Provides the first stage of treatment by capturing trash Contains flow control, high flow bypass and optional
& litter, gross solids, and sediment. drain down filter.
@ Settling chamber 6 Multi-level flow control
Provides the second stage of treatment by separating Orifice plates and/or valves are used to control the
out larger suspended solids. flow through the treatment stages.

 

 

 

Volume Sizing MUSIC Modelling

The SPEL Basin Modular Wetlands system can be The SPELBasin Modular Bioretention System is
designed to treat flows from detention systems or modeled [typically in MUSIC] for each project based on
directly off hardstand surfaces. Contact SPEL for more the site specific requirements.

information.

Tested Treatment Efficiencies*

 

 

 

 

 

Pollutant Efficiency
Gross Pollutants (GP) 99%
Total Suspended Solids (TSS) 86%
Total Phosphorus (TP) 65%
Total Nitrogen (TN) 50%

 

 

 

 

 

*Contact Spel to confirm approved performance for the project LGA

spel.com.au
Log in to download the original file

Reference Document MCU22_0102 Stormwater Management Plan.pdf · 29.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.