Log in to see the plans as drawn To ensure effective Flow then enters the biofiltration chamber via a pipe
functioning of located at the base of the structure, and is distributed
the biofiltration throughout the filter media through a HDPE geo-grid
system, standard fitted to the perimeter walls (4). Stormwater filters
specifications of through the proprietary media blend horizontally and
the soil media have into the centrally-located, slotted collection pipes (5)
been developed that discharge to the outlet chamber (6). Flow finally
(FAWB, 2009). enters the underground stormwater drainage system
These specifications through a discharge pipe (7) that is controlled by an
require traditional offset outlet from the base to create a permanently
biofiltration systems submerged zone. These are shown in Figure 3.
to implement three
layers of media, as 1.3 DESIGN DRAWINGS/DIMENSIONS
indicated in Figure 2.
A standard drawing of the SPELBasin® is shown in
FIGURE 2. Figure 4. The SPEL basin has an overall length, width
BIOFILTRATION MEDIA LAYERS SECTION and height of 6120 x 1340 x 1300 mm respectively. The
system allows for stormwater runoff to enter via a kerb
These three layers then have a detailed specification inlet, a grated inlet or underground pipe. The kerbtype
that describes the particle size distribution, nutrient inlet and grated inlet are fitted with a 600 x 600 mm
content and desired permeability to achieve the PEL StormSack which filters gross pollutants from
stormwater treatment goals. stormwater inflow.
1.2 MODULAR BIOFILTRATION Pre-filter cartridges are situated within the pre-
treatment chamber to further remove coarse sediment
The SPELBasin® modular biofiltration system has from stormwater that bypasses the StormSack. Flow
a number of similar design features to a traditional is horizontally dispersed through a 7.3 m3 biofiltration
biofilter, however, differs in two key areas; system with a proprietary biofiltration media blend
which drains treated stormwater into the 1.56 m3
• the use of a proprietary media blend; and discharge chamber. Treated water is discharged
• horizontal flow instead of top-down flow; through outlet pits and to street drainage.
The treatment process provided by the SPELBasin®
commences with runoff entering via a kerb inlet (2),
grated inlet or pipe network, and passing through
a coarse sediment screen in the pre-treatment
chamber (3).
FIGURE 3.
SPELBASIN® SCHEMATIC
spel.com.au 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.