Introduction Site Description
This Bushfire Management Plan has been General description
commissioned by Noosa Shore Council to
update a BMP that was prepared in 2011 by The Doonan Waste Management Centre is
Rob Friend & Associates Pty Ltd. located on Council owned land off the
Eumundi-Noosa Road and north of the
As part of this update, site was inspected on western end of Emu Mountain Road, Doonan
the the19th of September 2024. (see Figures 2, 3 & 4).
Proposal The land is generally located at 561 Eumundi
- Noosa Road Doonan QLD 4562 and
This Bushfire Management plan is also to described as Lot 77 on SP298776 covering an
form part of a development Application by area of 2,072,093.35 sq.m. (207.209 ha).
the Managers of the Noosa Land Fill land and
Waste Management Facility (see Figure 1). The property is made up of three areas which
are separated by roadways, the Walter Hay
The development proposal is seeking to; drive seperates the western from the central
areas and Tidswell Road seperates the
Locate new offices and other central area from the eastern area.
administration support into a single
structure in the north-western portion The western area is 191.980 ha. The central
of the site. area is 95.964 ha and the eastern area is
Re-arrange the waste disposal of 15.229 ha.
recyclable material by members of
the public, The landfill and other waste management
Relocated the existing community activities is located in the south-western
based recycled material shop into the portion of the land, covering an approximate
single building, area of 42.31 hectares which leaves
Re-define the car parking and truck approximately 149.7 hectares being
parking areas,\ maintained as bushland.
Construct a waste sorting and
recovery area. The land is also transacted by the Walter Hay
Drive and a portion of Tidswell Road which
The redevelopment will also entail a staged divides the land into a larger western area
development of hard waste such as concrete, and the smaller central and eastern areas to
metals and vegetative waste within the the east of Tidswell Road.,
existing areas which receive these waste
items. The land is bounded to the north by Hollett
Road, Eumarella Road and Emu Mountain
New stormwater detention and retention Arterial Road along its southern boundary,
basins will be located to the north of the large residential allotments and a section of
existing detention basin. Tidswell Road along its eastern boundary
and the Eumundi – Noosa Road along its
A further stage will also include the location western boundary.
of a solar farm over part of the existing land
fill area which is no longer required for The main access point for the waste transfer
disposal of non-recyclable waste. facility is via the Eumundi – Noosa Road.
RFA24-059 – Noosa Land Fill and Waste Management Facility – Bushfire Management Plan
Rob Friend & Associates Pty Ltd 10th of October 2024
Document Set ID: 23617065
Version: 1, Version Date: 05/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.