Reference Document - Bushfire Management Plan - 132005.638.04

of 60

Plans and drawings: the text below has words only, no drawings.

Very large file (28.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                       3


                 Introduction                                          Site Description

                 This Bushfire Management Plan has been                General description
                 commissioned by Noosa Shore Council to
                 update a BMP that was prepared in 2011 by             The Doonan Waste Management Centre is
                 Rob Friend & Associates Pty Ltd.                      located on Council owned land off the
                                                                       Eumundi-Noosa Road and north of the
                 As part of this update, site was inspected on         western end of Emu Mountain Road, Doonan
                 the the19th of September 2024.                        (see Figures 2, 3 & 4).

                 Proposal                                              The land is generally located at 561 Eumundi
                                                                       - Noosa Road Doonan QLD 4562 and
                 This Bushfire Management plan is also to              described as Lot 77 on SP298776 covering an
                 form part of a development Application by             area of 2,072,093.35 sq.m. (207.209 ha).
                 the Managers of the Noosa Land Fill land and
                 Waste Management Facility (see Figure 1).             The property is made up of three areas which
                                                                       are separated by roadways, the Walter Hay
                 The development proposal is seeking to;               drive seperates the western from the central
                                                                       areas and Tidswell Road seperates the
                          Locate new offices and other                central area from the eastern area.
                           administration support into a single
                           structure in the north-western portion      The western area is 191.980 ha. The central
                           of the site.                                area is 95.964 ha and the eastern area is
                          Re-arrange the waste disposal of            15.229 ha.
                           recyclable material by members of
                           the public,                                 The landfill and other waste management
                          Relocated the existing community            activities is located in the south-western
                           based recycled material shop into the       portion of the land, covering an approximate
                           single building,                            area of 42.31 hectares which leaves
                          Re-define the car parking and truck         approximately 149.7 hectares being
                           parking areas,\                             maintained as bushland.
                          Construct a waste sorting and
                           recovery area.                              The land is also transacted by the Walter Hay
                                                                       Drive and a portion of Tidswell Road which
                 The redevelopment will also entail a staged           divides the land into a larger western area
                 development of hard waste such as concrete,           and the smaller central and eastern areas to
                 metals and vegetative waste within the                the east of Tidswell Road.,
                 existing areas which receive these waste
                 items.                                                The land is bounded to the north by Hollett
                                                                       Road, Eumarella Road and Emu Mountain
                 New stormwater detention and retention                Arterial Road along its southern boundary,
                 basins will be located to the north of the            large residential allotments and a section of
                 existing detention basin.                             Tidswell Road along its eastern boundary
                                                                       and the Eumundi – Noosa Road along its
                 A further stage will also include the location        western boundary.
                 of a solar farm over part of the existing land
                 fill area which is no longer required for             The main access point for the waste transfer
                 disposal of non-recyclable waste.                     facility is via the Eumundi – Noosa Road.

                           RFA24-059 – Noosa Land Fill and Waste Management Facility – Bushfire Management Plan

                 Rob Friend & Associates Pty Ltd                                                   10th of October 2024

Document Set ID: 23617065
Version: 1, Version Date: 05/03/2025
Log in to download the original file

Reference Document - Bushfire Management Plan - 132005.638.04.pdf · 28.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.