Skip to the record
Accept no imitations.

Original source · versioned page text

2015-09-15 Infrastructure and Services Committee Agenda

of 73

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                         AGENDA


  Infrastructure & Services
     Committee Meeting


           Tuesday, 15 September 2015


                    commencing at 9.00am
           Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Sandy Bolton (Chair), Bob Abbot, Frank Pardon, Noel Playford




   “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2015-09-15 Infrastructure and Services Committee Agenda(PDF, 8MB).pdf · 7.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 72 sections

Section 2

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA       15 SEPTEMBER 2015


TABLE OF CONTENTS

ITEM                                                                   PAGE
ATTENDANCE & APOLOGIES                                                      -
PRESENTATIONS                                                               -
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                               3
Infrastructure Planning & Design                                           3
1      FREE HOLIDAY BUSES 2015-16                                           3
2      GYMPIE TERRACE, NOOSAVILLE - FOOTPATH RECONSTRUCTION AT
       WILLIAM STREET - UPDATE                                              8
COMMUNITY SERVICES DEPARTMENT REPORTS                                     12
Community Development & Sport & Recreation                                12
3      DRAFT NOOSA SOCIAL STRATEGY                                        12
Community Facilities                                                      33
4      THE J BUSINESS PLAN 2015 - 2018 REPORT                             33
5      LOCAL LAWS UPDATE REPORT TO 31 JULY 2015                           37
Libraries & Galleries                                                     45
6      BUTTER FACTORY ARTS CENTRE MANAGEMENT                              45
Waste & Environmental Health                                              53
7      WASTE MANAGEMENT - ANNUAL REPORT 2014/15 INCLUDING UPDATE TO
       31 JULY 2015                                                       53
8      ENVIRONMENTAL HEALTH - ANNUAL REPORT 2014/15 INCLUDING UPDATE
       TO 31 JULY                                                         63
CLOSED SESSION                                                        -




                                                                 Page 2 of 73

Section 3

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                         15 SEPTEMBER 2015



PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Infrastructure Services only)

Infrastructure Planning & Design
1                        FREE HOLIDAY BUSES 2015-16
DOCUMENT INFORM AT ION




Author                              Project Officer, Joanna Ferris
                                    Planning & Infrastructure Department

Index                               ECM\Project\Pub-Trans\PT-FHB
                                    ECM\Project\Noosa Heads Lions Park Car Park
                                    ECM\Subject\ 45.15 Traffic and Transport

Attachments                         Nil


EXECUTIVE SUMMARY
Free Holiday Buses were first introduced by Noosa Council in 2000. The primary aim is to reduce
traffic congestion during peak Easter and Christmas holiday periods as well as encourage
greater use of public transport throughout the year. It is recommended that the service continue
for the periods - 26 December 2015 to 3 January 2016 and 25 March to 3 April 2016.

RECOMMENDATION
That Council note the report by the Project Officer to the Infrastructure & Services Committee
Meeting dated 15 September 2015 and
A.                       Provide Free Holiday Buses during the periods 26 December 2015 to 3 January 2016 and
                         25 March to 3 April 2016.
B.                       Accept TransLink’s quotation of $40,614 (excl GST) for the Christmas Free Holiday buses
                         for Routes 626,627,628,629 and 632.
C.                       Authorise the CEO to accept TransLink’s impending quotation for the Easter Free Holiday
                         buses for Routes 626,627,628,629 and 632.
D.                       Accept Sunbus’s quotation for a shuttle between Peregian Beach and Noosa Heads.
E.                       Accept Sunbus’s quotation to provide one passenger assistant on selected dates.
F.                       Approve a marketing budget of $8,500 for the Christmas and Easter Free Holiday Buses.
G.                       Include the Boreen Point–Tewantin Flexilink service and Council Cabs in the Free Holiday
                         Buses services.
H.                       Approve the use of Noosa Heads Lions Park as a car park for the period 26 December
                         2015 to 10 January 2016 and 25 March to 3 April 2016 to be managed by the Tewantin-
                         Noosa Lions Club.
I.                       Approve 60% of the Lions Park car parking revenue be provided to the Tewantin-Noosa
                         Lions Club.




                                                                                                    Page 3 of 73

Section 4

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                     15 SEPTEMBER 2015


REPORT
The purpose of this report is to seek Council’s approval to proceed with Christmas and Easter
Free Holiday Buses as per previous years.

1.   Recommended Dates
Free Bus Services
   Saturday 26 December 2015 – Sunday 3 January 2016.
   Friday 25 March – Sunday 3 April 2016.
The Christmas service is for 9 days, due to Boxing day falling on a Saturday, and the Easter
service is for 10 days.
Noosa Heads Lions Park – Car Park
   Saturday 26 December 2015 – Sunday 10 January 2016.
   Friday 25 March – Sunday 3 April 2016.
2.   Free Services

The following five Noosa-specific TransLink services currently operate 7 days a week and are
recommended for inclusion in the Free Holiday Buses initiative:
   Route 626 – Tewantin to Sunrise Beach via Noosa Heads
   Route 627 – Tewantin to Sunshine Beach via Noosa Heads (Electric Bus route)
   Route 628 – Noosa Parklands to Noosa Junction, via Noosa Civic
   Route 629 – Tewantin to Noosa Junction via Noosa Civic
   Route 632 – Noosa to Cooran via Cooroy and Pomona
Four additional TransLink services travel outside the Shire and into Maroochydore, Nambour,
and Eumundi (Routes 620, 622, 630 and 631). A request to include the Noosa only component of
these services was not approved by TransLink.

In order to offer a free service to residents between Peregian Beach and Noosa Heads, the
following additional shuttle service is recommended:
   064 (shuttle) – Peregian Beach to Noosa Heads from 8am to 6pm.
In previous years, the Boreen Point - Tewantin Flexilink and Council Cabs services have been
included in the program and provided free of charge to passengers.

3.   Marketing
Proposed marketing of the Free Holiday Buses includes:
   Posters at major bus stops
   15 street banners
   Four variable message boards (Cooroy/Noosa rd, Eumundi Noosa rd, David Low Way,
     Walter Hay Dr)
   Posters in all Council facilities
   Pull up banner at Noosa library and Level 3 Council office
   Council communication tools including website, Facebook, eNews and messages on hold.
   Liaison with external stakeholders (Tourism Noosa, Accommodation Providers, Shopping
     Centres etc.) for inclusion on websites, emails, and newsletters
   Specific promotion to Peregian community groups of temporary shuttle Route 064
     Peregian-Noosa heads
   Media launch with support from local newspapers
   Prize for online feedback survey
   In kind marketing support from TransLink.

                                                                                Page 4 of 73

Section 5

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          15 SEPTEMBER 2015


4.    Passenger Assistant
The role of the passenger assistant is to:
    Coordinate movement of buses/passengers to avoid overcrowding.
    Offer assistance with routes, times and which side of the stop to wait at.
    Encourage passengers to complete the FHB survey.
    Remind drivers to press buttons to record passenger data.

One Sunbus passenger assistant is proposed to be based at Noosa Heads Bus Station from
9.30am to 4.10pm on the following dates:

    Tuesday 29 December 2015.
    Thursday 31 December 2015.
    Saturday 2 January 2016.
    Tuesday 29 March 2016.
    Wednesday 30 March 2016.
    Thursday 31 March 2016.

These dates have been selected based on previous passenger data with the highest patronage.

5.    Lions Park
For many years, the Noosa Heads Lions Park has been used as a paid car park during peak
holiday periods. During the Christmas period the car park operates for an additional week
following the end of the free bus services, however during Easter the car park only operates
during the free holiday buses period.
The current arrangement is:
    The Tewantin-Noosa Lions Club manages the operation of the car park from 9.00am to
      6.00pm daily.
    In wet weather the park is not opened to vehicles.
    Vehicles are charged a flat rate of $10 (inc GST) per day or part thereof.
    The Tewantin-Noosa Lions Club receives 60% of the parking fees, less council’s GST
      obligation. The remaining 40% of the revenue from the Lions Park is utilised to fund traffic
      control staff and park regeneration.

Previous Council Consideration

Nil

Finance & Risk

It is proposed that the Free Holiday Bus services will be funded by the Public Transport Levy.
The 2015/16 budget allocation for free holiday buses is $140,000.




                                                                                     Page 5 of 73

Section 6

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                       15 SEPTEMBER 2015


Table 1:       2015/16 Proposed Expenditure (excl GST)

Services                                                   Proposed Expenditure
Christmas 2015/16                                                 $40,614
TransLink Services (626,627,628,629,632)
Easter 2016                                                      $18,450
TransLink Services (626,627,628,629,632)                       (Based on 2015)
Peregian-Noosa Heads Shuttle (Xmas 2015/16)                       $15,534
Peregian-Noosa Heads Shuttle (Easter 2016)                        $16,884
Passenger Assistant (Xmas)                                         $2,058
Passenger Assistant (Easter)                                       $1,890
Marketing (Xmas & Easter)                                          $8,500
Total                                                            $103,930

NOTE: The 2015/16 Christmas service is for 9 days (due to Boxing day falling on a Saturday).
and Easter service is for 10 days.

Table 2:       2014/15 Free Holiday Buses Expenditure (excl GST)

Services                                                   Expenditure

Christmas 2014/15                                                 $44,675
TransLink Services (626,627,628,629,632)
Easter 2015                                                       $18,450
TransLink Services(626,627,628,629,632)
Peregian-Noosa Heads Shuttle (Xmas 2014/15)                       $16,095
Peregian-Noosa Heads Shuttle (Easter 2015)                        $16,312
Passenger Assistant (Xmas)                                         $2,900
Passenger Assistant (Easter)                                       $2,990
Marketing (Xmas & Easter)                                          $8,848
Total                                                           $110,270

Consultation

External Consultation - Community & Stakeholder

Sunshine Coast Council
SCC will not be providing free holiday buses.

TransLink
   Quote for Christmas & Easter Free Holiday Buses
   Request for inclusion of Noosa component of TransLink services which travel outside of
     Noosa area.

Sunbus
Quote for Passenger Assistant and Shuttle service.




                                                                                  Page 6 of 73

Section 7

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               15 SEPTEMBER 2015


Internal Consultation

Property & Facilities, Civil Operations – Noosa Heads Lions Car Park

Community Engagement – Feedback regarding proposed marketing

Finance – Available PT Levy funds & FHB budget allocation.

Departments/Sections Consulted:

    Community Services                       X   Planning & Infrastructure
    Disaster Management & Public Order           Building & Plumbing Services
    Waste & Environmental Health                 DA Planning
    Community Facilities                         Strategic Land Use Planning
    Cultural Facilities                      X   Asset Design & Investigations
                                                 Asset Planning
                                             X   Civil Operations
                                                 Environment

X   Executive Office                         X   Corporate Services
X   Community Engagement                     X   Finance
    Customer Service                             ICT
    Executive Support                            Procurement & Fleet
    Governance                               X   Property & Facilities
    Human Resources                              Revenue Services




                                                                                        Page 7 of 73

Section 8

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                      15 SEPTEMBER 2015


2                        GYMPIE TERRACE, NOOSAVILLE - FOOTPATH RECONSTRUCTION AT WILLIAM
                         STREET - UPDATE
DOCUMENT INFORM AT ION




Author                             Design Coordinator, Craig Eldridge
                                   Planning & Infrastructure Department

Index                              Projects (T1) - Gympie Terrace and William Street Revetm – CAP.WORK -
                                   100721

Attachments                        1.    Previous sheet piled proposal
                                   2.    Shared zone proposal


EXECUTIVE SUMMARY
Nil.

RECOMMENDATION
That Council note the report by the Design Coordinator and Project Manager to the Infrastructure
& Services Committee Meeting dated 15 September 2015 and
A.                       Agree that the project proceed to tender stage based on the concept of constructing a
                         raised concrete shared zone as a replacement of failed footpath to William Street,
                         Noosaville; and
B.                       Approve additional funds of $159,770 from the unallocated renewal fund through the
                         budget review process.


REPORT
This report provides information regarding the proposed footpath reconstruction at William Street,
Noosaville including reconstructing the existing footpath to a proposal that creates a concrete
shared zone.

1.                       Background

The section of footpath at William Street, Noosaville has undergone subsidence to the point of
becoming a public safety concern requiring closure of the footpath to the public.

To avoid potential conflicts with the adjacent remains of a jetty structure, Council investigated a
design option that included a vinyl sheet pile retaining wall supporting a new 1.4m wide timber
deck with handrail, together with associated rock revetment works and road works (Attachment
1). Based on further advice from consulting engineers engaged on the project it is estimated that
the cost for this option would be in the order of $500,000.

The cost is significant due to the constructability issues associated with sheet piling and the
conflicts with existing Energex services.

Other issues associated with the construction works were also considered undesirable such as
vibrations from driving of sheet piles and lengthy road closure.




                                                                                                 Page 8 of 73

Section 9

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                   15 SEPTEMBER 2015


2.       Alternative Solution
A shared zone was originally considered as an option and having investigated the sheet pile
proposal in more detail it is now considered that the raised concrete shared zone solution will
address the problem in a much shorter timeframe, and at greatly reduced cost and disruption as
shown in Attachment 2. This will in effect, formalise where pedestrians are currently walking
given the closure of the current unsafe footpath.

Council may consider further protective treatment of the foreshore at a time when an agreement
is reached with interested parties in the adjacent jetty, noting it is not anticipated that any works
would be required for a number of years.

Previous Council Consideration
Nil.

Finance & Risk
Risks associated with construction of a raised shared zone will be greatly less than the risks
involved in constructing the sheet pile wall and elevated deck.
Risks from conflicts with the adjacent waterway structures are also negated by moving the
construction zone back from the shore.
Reduced times for road closure will result in less conflict with local residents and other traffic.

Finance
Cost to date (geotechnical investigation, road design, legal)                                 $100,648
Preliminary estimate for design and construction of raised shared zone                        $200,000
Total Cost                                                                                    $300,648
Budget allocation                                                                             $140,878
Additional funds required                                                                     $159,770

Consultation

External Consultation - Community & Stakeholder
GHD Consulting Engineers

Internal Consultation
Director, Corporate Services.

Departments/Sections Consulted:

       Community Services                        X   Planning & Infrastructure
       Disaster Management & Public Order            Building & Plumbing Services
       Waste & Environmental Health                  DA Planning
       Community Facilities                          Strategic Land Use Planning
       Cultural Facilities                       X   Asset Design & Investigations
                                                 X   Asset Planning
                                                     Civil Operations
                                                     Environment
X      Executive Office                          X   Corporate Services
       Community Engagement                      X   Finance
       Customer Service                              ICT
       Executive Support                             Procurement & Fleet
       Governance                                    Property & Facilities
       Human Resources                               Revenue Services



                                                                                            Page 9 of 73

Section 10

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015



                                                                           Attachment 1




                                                           Page 10 of 73

Section 11

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015


                                                                           Attachment 2




                                                           Page 11 of 73

Section 12

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                         15 SEPTEMBER 2015



COMMUNITY SERVICES DEPARTMENT REPORTS
Community Development & Sport & Recreation

3                        DRAFT NOOSA SOCIAL STRATEGY
DOCUMENT INFORM AT ION




Author                              Community Development Coordinator, Alison Hamblin
                                    Community Services Department

Index                               ECM/Subject/Community Engagement/38.11 Policies/Guidelines/
                                    Strategies

Attachments                         1.   Draft Noosa Social Strategy


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Community Development Coordinator to the Infrastructure
and Services Committee Meeting dated 15 September 2015 and
A.                       Approve the “Draft Noosa Social Strategy” for the purpose of public exhibition and
                         comment; and
B.                       Request the Chief Executive Officer to collate and consider feedback received as part of
                         the consultation undertaken for further consideration of the Noosa Social Strategy by
                         Council.


REPORT
Background

The 2014/2015 Operational Plan commits Council to developing a Social Plan for Noosa Shire.
The proposed Noosa Social Plan 2016-2023 (The Social Plan) will set out Noosa’s aspirations
and social priorities for the next seven years.

Evolving concurrently, Council developed a draft policy framework to demonstrate the
hierarchical relationship of Council Strategies and Plans. The framework identifies the
development of the Noosa Shire Social Strategy (Social Strategy) rather than a Social Plan.

Aim of the Social Strategy

By developing and implementing a Social Strategy, Noosa Council aims to address, where
appropriate, the social needs and aspirations of those who live, work and visit the Noosa Shire.
The Strategy considers these issues within the framework of the local environment, the economy
and the Noosa community. The Strategy also highlights the significant social issues facing the
Shire.

The Strategy provides both Council and the community with the baseline evidence to help make
well-informed decisions about social issues and needs. Priority issues have been identified
through consultation with key stakeholders and through analysis of statistics, demographics and
other social data. Only those issues that were considered to be the highest priority have been
included in the action plan for implementation.

                                                                                                   Page 12 of 73

Section 13

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          15 SEPTEMBER 2015


It is important to note that not all social issues are the responsibility of Council. Other tiers of
government, as well as businesses, community organisations and residents all have a role to
play. The Strategy also suggests collaboration of organisations or service/facility providers to
avoid duplication and improve efficiencies.

Proposed Consultation on Draft Strategy

Public review and feedback will occur after Council’s endorsement of the draft Social Strategy.
The draft Noosa Social Strategy will be made available for public exhibition and comment for a
period of 30 business days. Community consultation methods will include:

   media release;
   Council’s webpage listing;
   community and stakeholder feedback via ‘Your Say Noosa’, Library and Council Pop Ups
     and Community Connections e-newsletter (targeting not for profit organisations in the
     Shire);
   continued engagement with service providers and targeted stakeholders throughout the
     Shire to refine the key initiatives and develop a detailed action plan.

Outside of the community engagement activities identified above, Council officers will also meet
again with the relevant State and Federal agencies to obtain feedback on the draft, develop an
implementation plan and determine areas where partnerships could occur.

Feedback and advice received by Council within the specified consultation period, will be
collated, reviewed and provided to relevant stakeholders for consideration prior to the
development of the final Strategy.

Previous Council Consideration

Ordinary Meeting 18 December 2014, Item 3, Page 3

That Council note the report by the Community Development Coordinator to the Infrastructure &
Services Committee Meeting dated 9 December 2014 and
A.   Agree that work commence on developing a new Noosa Social Plan 2016 -2023
B.   Approve the proposed membership of the Noosa Social Plan Reference Group as per
     Attachment 1

Finance & Risk

$10,000 has been allocated for the consultation, design and printing of the final Social Strategy.

Consultation

External Consultation - Community & Stakeholder

The proposed draft Noosa Social Strategy 2015 is based on the outcomes of the extensive
community engagement activities that have taken place over the last seven years as part of the
development of Council’s past and existing strategies and plans.

In the development of this Strategy, seven meetings were held with the Noosa Social Plan
Reference Group (made up of service providers, State Government Officers and community
representatives) appointed by Council.




                                                                                     Page 13 of 73

Section 14

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               15 SEPTEMBER 2015


In addition, individual meetings were undertaken with a targeted group of service providers from
the Community Services sector.

Organisations consulted included:
   State Government – Department of Communities, Child Safety and Disability Services, Arts
     Queensland, Department of National Parks, Sport and Racing
   United Synergies
   Salvation Army
   St Vincent de Paul
   Red Cross
   Coast 2 Bay Housing
   Not for profit community organisations - 92 responses from our not for profit survey
     completed.

Internal Consultation

     Two scoping and workshop sessions with the Mayor and Councillors
     Executive Office – CEO
     Executive Manager
     Economic Development Officer
     Principal Strategic Planners
     Waste and Environmental Health Manager
     Community Facilities Manager
     Libraries and Galleries Manager
     Development Officers, Community Development
     Noosa Community Care Coordinator
     Local Laws Coordinator
     Financial Services Manager
     Community Engagement Manager
     Director Planning and Infrastructure
     Property and Facilities Manager Development Planner
     Infrastructure Assessment Coordinator

All feedback received has been considered in the development of the Draft Strategy. The key
changes from this feedback have helped to focus the document and shape the four themes and
proposed new initiatives.

Departments/Sections Consulted:

x    Community Services                      x   Planning & Infrastructure
     Disaster Management & Public Order          Building & Plumbing Services
     Waste & Environmental Health                DA Planning
     Community Facilities                        Strategic Land Use Planning
     Cultural Facilities                         Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment

x    Executive Office                        x   Corporate Services
     Community Engagement                        Finance
     Customer Service                            ICT
     Executive Support                           Procurement & Fleet
     Governance                                  Property & Facilities
     Human Resources                             Revenue Services




                                                                                       Page 14 of 73

Section 15

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 15 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA -_- 15 SEPTEMBER 2015

               sai ieee’ ; ¥ '      .
      eee                              ee
                 Mabe bbl dl Cl SNRs

                           “a                               '     &      |  |

                   Noosa Social Strategy

           NOOSA COUNCIL       PO Box 141     P. (07) 5329 6500 [email protected]

                                                                       Page 15 of 73

Section 16

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 16 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    _ 15 SEPTEMBER 2015

                   Noosa Social Strategy
                    © Noosa Council 2015.

                   General Enquiries: 8.15 am - 5.00 pm Monday to Friday (excluding public holidays)
                   By telephone: (07) 5329 6500 (including After Hours emergencies)
                   By email:
                   Fax: (07) 5329 6501
                   Street Address: 9 Pelican Street, TEWANTIN
                   Postal address: PO Box 141, TEWANTIN QLD 4565

                   Disclaimer
                   This document has been developed by Noosa Shire Council’s
                   Community Development Unit in consultation with the Noosa
                   Social Strategy Reference group.
                   Information contained in this document is based on available
                   information at the time of writing. All figures and diagrams
                   are indicative only and should be referred to as such. This is a
                   strategic document which deals with technical matters in a
                   summary way only. Council or its officers accept no
                   responsibility for any loss occasioned to any person acting or
                   refraining from acting in reliance upon any material contained
                   in this document
                   Acknowledgements
                   Thanks to the members of the Noosa Social Strategy Reference Group:
                   Angela Bryan, Community Rep.                David Sutcliffe, Salvation Army.
                   Helen Collins, Community Rep/               Steve White, Qld Government.
                   Coast2Bay Housing Group.                    Cr Frank Pardon, Noosa Council.
                   Katie Edminston, Arts Queensland.            Kerri Contini, Noosa Council.
                   Christopher John, United Synergies.         Alison Hamblin, Noosa Council.
                    Maureen Farrington, St Vincent de          Alan (Fox) Rogers, Noosa Council.
                   Paul/Red Cross.                              Rowena Skinner, Noosa Council.
                   Janie Hemmings-Wilcox, Qld                  Greg Tucker, Noosa Council.
                   Government.
                   A special thank you to Michelle Davies who provided advice to the reference group.

                                                                                                   Page 16 of 73

Section 17

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 17 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA          _ 15 SEPTEMBER 2015

          Table of Contents

                                                                    Page 17 of 73

Section 18

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 18 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                              15 SEPTEMBER 2015

            Executive Summary
            Noosa is recognised as one of Australia’s most desirable places to live, work and visit, thanks to its
            outstanding beauty, mild subtropical weather and enviable lifestyle prospects.
            The Noosa Social Strategy (the ‘Strategy’) aims to provide a framework to continue to improve community
            wellbeing and cohesiveness while addressing the social opportunities and challenges facing the Shire over
            the coming years. It highlights our current strengths as a community and commits to supporting and building
            upon these while at the same time identifying priority social issues and challenges for action.
            The Strategy articulates Council’s role in the cultural, community and social life of the Shire. It encourages
            greater collaboration between government and non-government organisations, service agencies, facility
            providers and individuals to avoid duplication improve efficiencies and enhance community cohesion.
            The Strategy has been informed by the Noosa Social Strategy Background Paper which details the evidence
            and rationale for the Strategy’s four key themes and key actions. The final Social Strategy will be
            supplemented by an implementation plan which details new initiatives, ongoing commitments and also
            provides actions, timeframes and key performance indicators. It is envisaged that this implementation plan
            will be reviewed and updated every three to five years. These documents provide Council and other agencies
            with solid evidence and rationale to help make well-informed decisions about social issues and community
            needs.
            Four strategic themes are identified in the Strategy. These themes are aspirational and identify our long-term
            goals. We are committed to becoming a more:
             e  Acohesive and resilient community
             e  Anactive and healthy community
             e  Anaccessible, diverse and affordable community, and
             e  Acreative and informed community.
            These themes were developed in consultation with the Social Strategy working group, key stakeholders and
            through an analysis of statistics, demographics and other social data. For each theme, aspirational
            statements and key initiatives are outlined to inform future implementation and action planning.
            In setting this policy direction, Council acknowledges the traditional custodians of this land past and present,
            salutes all those who have helped shape the Shire and pays tribute to the countless volunteers and
            community groups who help maintain and build the social capital of our towns and villages.
            Council looks forward to working with other tiers of government, local businesses, community organisations
            and individual residents to implement this Strategy.

                                                                                                           Page 18 of 73

Section 19

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 19 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                               _ 15 SEPTEMBER 2015

      1       Introduction
            People's lives are shaped by their particular circumstances, their personal choices, their families and support
            networks, the availability of services, the local economy and the surrounding environment. Separately and
            collectively these can either have a positive or negative affect on individual and community wellbeing.
            Council’s goal is to facilitate Noosa’s development so that our social, built, and natural environments
            positively influence the wellbeing of residents, workers and visitors. This requires Council to plan for, create,
            maintain and deliver a variety of public places, facilities and services which improve people’s quality-of-life.
            It also entails advocacy on behalf of those in greatest need; the targeted delivery of programs and services;
            and harnessing the power of key individuals and stakeholders within the Shire.

      2       Context

      2.1     The Federal and State Context
            The Federal and State Governments have broad-ranging responsibilities to deal with social issues.
            At the Federal and State level there are major policy changes currently being discussed and implemented in
            the areas of health, aged and child care, affordable housing, homelessness, education and social welfare.
            Some of these include:
             e   The National Disability Insurance Scheme and Consumer Directed Care which will change the way in
                 which social services are delivered across the country
             e   Changes to the Aged Pension, Family Support Benefits and Youth Unemployment Benefits
             e   Reduction in Federal payments to the States to deliver primary health care
             e   A focus on disease prevention and how to meet the challenges that come with increasing rates of often
                 preventable disease such as diabetes, skin cancer and chronic heart disease
             e   Taskforces into domestic violence, child sexual abuse and indigenous health
             e   Debates on how best to help individuals struggling with mental health issues, substance abuse and
                 gambling addictions
             e   Anexpanded role for not-for-profit organisations in delivering social services
             e   New funding models for tertiary education institutions
             e = Ashift from locally delivered services to online service delivery.
            To be effective, responses to social issues require significant resourcing. The Federal budget allocates 35% of
            its total budget to community services. However, increasingly, the community is asking for more funding to
            meet growing social needs, particularly in regional areas.
            As a result, State and Federal Governments are increasingly focusing on both measurable outcomes and
            demonstrable value for money regarding funding to the social services sector. Furthermore, with a change in
            government come changes in policy direction. So throughout the life of this Strategy there will undoubtedly
            be major changes in the funding and provision of social programs and services.
            The Federal and State Government’s implementation of their social policy agendas affect all of our lives. Here
            in Noosa we face similar challenges to other people around Australia.
            The Noosa Shire Social Strategy attempts to put these major policy debates and issues into a local context. It
            highlights our strengths and the simple fact that, regardless of what the Federal or State Government does,
            we as a community have a responsibility for the wellbeing of our fellow citizens.

            2.2       The Noosa Community
            The Noosa Shire is located in South East Queensland, approximately 120 kilometres north of Brisbane. The
            region is bounded by the Gympie Regional Council in the north and west, and the Sunshine Coast Regional
                                                                                                                     5

                                                                                                              Page 19 of 73

Section 20

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 20 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                             _ 15 SEPTEMBER 2015

            Council to the south. The Shire encompasses a total land area of 871.6 km2 with over 800 kilometres of
            roads and nearly 450 kilometres of bikeways.
            In 2007 the Shire was designated a Biosphere Reserve by the United Nations Education, Scientific and
            Cultural Organisation (UNESCO) and Man and the Biosphere (MAB) program.
            While significant amounts of native vegetation have been removed or greatly modified one third of Noosa is
            considered to have outstanding environmental, biodiversity and natural history values and is managed
            primarily for conservation. A further 30,653 hectares of land is predominantly undeveloped and sustainably
            managed through voluntary arrangements such as Land for Wildlife and Voluntary Conservation Agreements.
            Noosa’s economy relies significantly on tourism leveraging the Shire’s great beaches, natural open space and
            outdoor recreational assets. In an attempt to reduce this dependence Council is developing strategies to
            diversify the local economy and develop new high value, low environmental impact businesses across the
            Shire.
            Noosa is home to approximately 7,400 businesses which are mainly small or micro businesses. It is also home
            to a range of very successful entrepreneurs and skilled business people.
            More than 53,000 people call Noosa home, however this swells significantly in peak holiday periods. For
            example, over 110,000 visitors overnighted in Noosa between January and March 2015, with a further
            97,000 day visitors in the same period.
            Under the current Noosa Planning Scheme, the sustainable resident population has the capacity to grow to
            62,000.
            Urban development is concentrated in the coastal communities and eastern beaches from Peregian Beach in
            the south to Noosa Heads and Tewantin in the north. In these areas the population density is around 400
            persons per square kilometre. For the balance of the Shire, the overall population density is approximately
            25 persons per hectare concentrated in and around the hinterland centres of Cooroy, Pomona, Cooran, Kin
            Kin and Boreen Point. Smaller residential areas are scattered throughout the hinterland.
            The Noosa community prides itself on its many strengths including:
             e  an engaged population that plays an active role in decision making
             e  areputation for being a caring community that helps one another
             e  anoutdoor lifestyle with its associated health and wellbeing benefits
             e  astrong and longstanding commitment to the protection of environmental values
             e  a large pool of active retirees, often available for volunteer work
             e  dynamic community groups, sporting clubs and social clubs
             e  popular sporting, food and cultural festivals and events
             e  low-rise development that is integrated with the landscape rather than dominating it and underpinned
                by Council’s The Noosa Plan
             e  alack of big city symbols such as a lack of traffic lights, neon signs and billboards
             e  anappreciation of our history and heritage
             e  asmall Council that is responsive to its community
             e  a distinct identity and brand which leverage significant economic benefit.

                                                                                                                   6

                                                                                                            Page 20 of 73

Section 21

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 21 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           15 SEPTEMBER 2015

          2.3    Key Facts

                                                 OS BF Te
                               Tela amin)          17.9%
                              ei                  PPE CT TY        Median age
                                ea                                 CRT
                                  re                                Ol LNT
                Indigenous                           |                         AR    BYE Te
                   seh                                                             bBo b/d
                  ONCE         NN                                  =              Qld 13.7%

             Se So                                                  —__            Mais
                 25%                                                                 20.8%
               Qld 22.8%                                                            Qld 13.6%
                                  Lo                            \ Top Five non-English
                     Couple families                                         ET Avr) 4-1)
                      iidameasli(elasta)                                    (eta)
                         < 15yrs                                            ae
                         RL: 3/4                                            Italian: 0.4%
                        Qld 42.8%                            LGBTI*         Pare
                                      Couples with               ;          S474
                                       no children           10-15%
                                         47.8%              Estimated
                                                          STU   -m ers
                                        (ol [e Beto Roy
                                                          11% nationally

                                                                                            7

                                                                                      Page 21 of 73

Section 22

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 22 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                   _ 15 SEPTEMBER 2015

                                                                  Median
                                                                  income
                                      20% of Council's              RIL |               Sunshine Coast
                                       efter ates                     RSET                is 12th least
                                          spent on                                         affordable
                                       sera        Ay                                   housing market
                                          Safe                                          in the world **

                                       .                                                                   Median
                      Unemployed                                                                          EM tts eelelia)
                            7.1%                                                                          YoU Me-Tie
                           Pe                                                                             $425/week
                                _       ~~                                                  oo          CREA
                                                                  NY ela [e)
                                                               Economic
                               :                oo                                    —~———_                Median
                          Pensioner                                                                       residential
                         Concession                                                                       3 bedroom
                           holder*                                                                     house sale price
                             IY;                                                                             $499k
                                                                                                          Qld $412k
                                           af     :                                        Hl    I
                                      Tm W a)                                                  ees
                                        no parent                                           Retail Trade
                                     employed AK,               ald Wet                 Accom & Food Services
                                          Vk                     SOL aTe Ce had          _    Sale SeTsEL
                                                                disadvantaged
                                         [ol(o ast 4                  aa                   [eelaritaviad(ela)
                                                                   SANS                 Education and Training
                                                                12.8% in most
                                                                disadvantaged
                                                                   quintile

             * March Quarter 2015
             ** SC 12th least affordable - The 11th Annual Demographic International Housing Affordability Survey (2014: 3rd Quarter)
             *** Families defined as those with children less than 15 years
            “Council 2015/16. Based on net costs, including depreciation and corporate overheads, but excluding Waste Management which
            Operates at a profit.
             *# ABS Index that ranks areas in Australia according to relative socio-economic advantage and disadvantage.
            “ Centrelink 2012

                                                                                                                         8

                                                                                                                  Page 22 of 73

Section 23

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 23 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    15 SEPTEMBER 2015

                                                      Ross River
                                                        Fever*
                                                      119 cases

                                                                                 SUT Meee)
                    a Lidate- 1g  >                        |                      for 2-5 year olds *
                        ae                                                      Measles 7 cases, Whooping
                          cL                                                         Cough 17 cases
                                         ~N                                7
                                                     Public

                                                    Health
                                         a“                                N
                    Delayed medical
                   consultation due                                                SS    eae
                        re                                 |                            a y=k
                             Ly                                                      ello Mer k=55
                            .  ‘0

                                                  Delayed purchasing
                                                      rey g-stog | el -Le)
                                                   medication due to
                                                         cost
                                                       6 lal

           * Notifiable disease data 2014/2015
           ** Compared to Qld PHN 2012-13
          Aover 18 years Public Health Information 2010
          * Centrelink 2012

                                                                                                     9

                                                                                               Page 23 of 73

Section 24

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 24 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                _ 15 SEPTEMBER 2015

                                                                yu t}
                                                             community
                                                            organisations
                                       23,285 hours of
                                       service provided                           yAURy 4
                                       Pot a                                    Need restate
                                          ommunity
                                          Siseent                               Qld 18.7%

                                                            ere     ia
                                       yea                Participation              Facility visits
                                      Wiis       —                        "——~       Boe
                                    Py REE                                            NLC 86,582
                                        /                 /          \               The J 65,752*

                                                     en                100+ sports
                                                   Visits                 aie
                                                  32,645*

            *2014/15 annual visitation (NAC — Noosa Aquatic Centre; NLC — Noosa Leisure Centre)

                                                                110
                                                             Assaults**

                                              ’                                       *11 CCTV
                                    SUR) PITHTES A          ee        Ag             cameras in
                                    violence orders —            F          —              :
                                      ees                      Safety                  eee ee
                                                                                        Street

                                                             128 Responses
                                                            to Noosa callers
                                                               for crisis
                                                              intervention,
                                                             counselling and
                                                            support t for DV

            *DV Connect Qid 2014-2015
            ** 2014/15 financial year

                                                                                                                      10

                                                                                                                Page 24 of 73

Section 25

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 25 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                              _ 15 SEPTEMBER 2015

            2.4      Community Facilities and Services
            The Noosa Shire has a strong and active community sector representing diverse interests and needs. There
            are approximately 300 not-for-profit community and sporting organisations located within the Shire. These
            groups range in size and scale from small groups focussed on local activities to religious organisations with
            large congregations and not-for-profit organisations delivering services at a regional, state and national level.
            Not-for-profit community organisations fill the gaps left by the government and business sectors, often
            providing direct assistance to the most vulnerable in the community. Support from corporate sponsors and
            the community, as well as government at all levels, is needed to sustain a healthy not-for-profit sector.
            A preliminary audit of Noosa Shire facilities and services was conducted in 2015, and recommendations
            relating to community organisations, facilities or services were made. Evidence from the audit, as well as
            from consultations with key stakeholders, demonstrates that there is minimal requirement for additional
            facilities in the Shire. However, there is a need to better co-ordinate and promote the availability of services
            provided. And there is also a need to improve the functionality of existing facilities, rather than construct
            new facilities.
            Council recognises that schools and private organisations have facilities that are often under-utilised on
            weekends, holiday periods or after school hours. The opportunity exists for these facilities to be made
            available for broader community purposes and to meet much of the overflow in current demand for
            community meeting spaces.
            In order to meet the future needs of the Noosa communities, the Desired Standards of Service for Parks and
            Land for Community Facilities should be reviewed. While Desired Standards of Service must be applied with
            caution, they provide a useful guide in ensuring an equitable and just distribution of public facilities.
            25       Key Issues
            It has become apparent in the development of this strategy that there is a need for improved local data to
            inform evidenced-based social planning, advocacy and resource allocation. From the data available, the key
            social issues in Noosa are similar to those in other regional Queensland communities and have been
            identified as:
        e   The Shire’s ageing population: Our population is older and ageing at a faster rate than the State average.
            This will impact on the available local workforce, demands on services targeting seniors, and may require
            some reprioritisation of resources. However it also positively affects the number of skilled volunteers in the
            Shire.
        e   Young people leaving the Shire: As in many regional areas across the State, young people are leaving the
            Shire due to the lack of local tertiary education and employment opportunities.
        e   Mental health and social isolation: There are an increasing number of vulnerable groups emerging in our
            community e.g. lone person households, some within the LGBTI (Lesbian, Gay, Bisexual, Transgender, and
            Intersex) cohort, and disengaged young people. To service the needs of these groups will require new and
            innovative approaches that support those most at risk.
        e   Homelessness (particularly for young people): This is an increasing issue in the Shire and a priority issue for
            the State Government. Well documented links between mental health and homelessness highlight a complex
            issue requiring a multi-faceted, coordinated approach as well as strong partnerships between government,
            not-for-profit organisations and the community.
        e   The availability of affordable housing, rental housing and short-term crisis housing: Noosa’s home and
            rental prices are higher than the State average. This, coupled with lower than average incomes, has led to a
            lack of affordable housing in the area. Shortages in affordable housing contribute to rates of homelessness.
        e = The rising cost of living: The increase in cost of living has been caused by a variety of factors, particularly the
            rising cost of utilities such as power and water. Such imposts have reportedly caused two-thirds of
            Australians to cut back on spending. Noosa generally has high housing costs relative to income and thus
            poor housing affordability. Car dependency is high and there is limited housing diversity.
        e   Unemployment and underemployment: Noosa has a higher unemployment rate than the State average.
            There needs to be greater coordination and information sharing between government, industry and training
            organisations.

                                                                                                                   11

                                                                                                             Page 25 of 73

Section 26

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 26 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                              _ 15 SEPTEMBER 2015

        e   Access to government services: Residents who do not have access to reliable transport have reduced access
            to health services. There are shortages of some health services and health-related infrastructure within the
            Noosa Shire
        ¢   Support, respite and affordable independent living options: Teenagers and adults with an intellectual or
            physical disability living in the Noosa Shire have particular needs that are not always being met.
        e   Accessibility: The design and construction of public places and physical infrastructure in Noosa could better
            meet the needs people with a disability, the aged and parents with young children.
        e   The impact of reforms in Commonwealth and State Government funding: This includes NDIS and Aged Care
            Reform. Furthermore, the rapidly changing policy and fiscal environments are inevitably impacting on
            Council, the Noosa community and individual residents.
        e   Domestic issues such as family violence, alcohol, drug and gambling addiction.
        e   Differing needs/expectations of residents compared with visitors resulting in conflicting priorities for
            resource allocation.
        e   Gaps in public and community transport across the Shire particularly for hinterland residents and young
            people.
        e   Ageing community facilities: Many of Noosa’s community facilities were built more than twenty or thirty
            years ago and may now require maintenance or replacement in a restricted fiscal environment.

      3       Council’s Vision, Principles and Priorities
            Engagement with our community to protect and enhance our lifestyle.
            Noosa Council’s vision focuses on its relationship with the community and is based on the core values of the
            organisation.
            3.1      Sustainability Principles
            The Noosa Shire Social Strategy, like all of Council’s strategy and policy documents, is guided by the following
            overarching Sustainability Principles:
        1.  Resources are sustainably managed so that the lifestyle of the community is preserved, without
            compromising the ability of future generations to meet their own needs.
        2.  Noosa’s economy is prosperous, diverse and protective of its unique environment.
        3.  Noosa residents belong to a community that values its diversity, accessibility and affordability.
        4.  Noosa’s community is inclusive, connected and resilient and it encourages participation and information
            sharing.
        5.  Noosa’s community benefits from quality places and programs that enhance wellbeing and support creative,
            active and healthy lifestyles.
        6.  Good governance is achieved through effective and efficient decision-making, with decisions being made in
            the best interests of the community.

            3.2      Council Priorities
            Council’s Corporate Plan outlines the long-term strategic priorities of Council while its annual Operational
            Plan provides detail and guidance for the delivery of corporate priorities over each fiscal year. While it is not
            practical to list all of Council’s goals and roles within this document, priority areas that directly impact on the
            outcomes of this strategy are summarised below.
            Work in partnership with our community
        e   to communicate information about activities and services operating within the Shire (provided by Council
            and community organisations)
        e   to encourage networking, information sharing and collaboration between government and non-government
            organisations
        e   to build the capacity of our communities and the groups that operate within them
        e   to provide opportunities for meaningful community engagement within a community development
            framework.

                                                                                                                  12

                                                                                                            Page 26 of 73

Section 27

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 27 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                              _ 15 SEPTEMBER 2015

            Set policy and strategy
        e   to ensure a coordinated and collaborative approach to addressing social issues of the Shire
        e   to ensure that broader council strategies consider the social ramifications of their implementation
        e   to develop a range of related strategic plans with key focus areas such as young people, accessibility, seniors
            etc.
            Provide quality service delivery
        e   through the effective operation of Council managed public facilities such as libraries, arts and performance
            venues, and its recreation and sporting facilities
        ¢   supporting community and not-for-profit organisations that provide services to residents and visitors.
            Look after community assets
        e   by developing asset management plans for Council owned and leased facilities
        e   through good disaster management planning and effective response to disaster events
        e   by ensuring capital works expenditure is based on evidential need and demand, and that it provides value for
            money.
            3.3      Council’s Policy Context
            A suite of Council strategies and plans are currently in development and these will further assist in
            addressing the social needs of the community. These include the Local Economic Plan, the Transport Strategy
            and a Housing Needs Analysis.

    3.3.1   Previous Noosa Social Plan
            The Noosa Social Plan 2006-2016 (The Plan) was the Shire’s first Social Strategy. The Plan was evidence-
            based and contained detailed demographic profiling. These profiles were useful in advocating to other levels
            of government for improvements to community services and facilities. It proposed a holistic approach to
            social issues.

    3.3.2   Other Recent Strategies
            In 2008, Noosa was amalgamated with Maroochy and Caloundra City Councils to form the Sunshine Coast
            Council (SCC). Over the following years a number of plans and strategies relating to social issues were
            completed. During this time specific, localised, quantitative research for the Noosa Shire was not
            undertaken. This lack of formalised local data relating to social issues in Noosa during that six-year period
            makes comparative and longitudinal analysis difficult.
            However these SCC documents do contain valuable information and useful policy direction. Since Noosa
            Council's reinstatement on 1 January 2014, these inherited plans and strategies are being systematically
            reviewed and updated in collaboration with community stakeholders.

                                                                                                                   13

                                                                                                             Page 27 of 73

Section 28

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 28 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                              _ 15 SEPTEMBER 2015

      4       Themes and Aspirations
            In the process of consulting and developing this Strategy, four themes have emerged that reflect the
            sentiment and aspirations of the residents of the Shire. These themes are:
            Theme 1 - Cohesive and resilient communities
            Theme 2 - Active and healthy communities
            Theme 3 - Accessible, diverse and affordable communities
            Theme 4 - Creative and informed communities.
            These themes provide the focus for the Strategy’s key initiatives.     These initiatives will inform the
            development of further, more refined actions which will be detailed in the implementation plan.      The
            following section elaborates on each theme by providing a summation of the aspirations and visions, and
            also makes recommendations for initiatives to supplement Council’s existing commitments.
            4.1      Cohesive and Resilient Communities
            Council aims to help create a better environment for people to more actively participate in their community.
            In partnership with individuals, businesses and the other levels of government, we have set ourselves the
            task of building cohesive and resilient communities.
            We will work hard to build resilience in our communities and organisations so that they can recover and
            learn from unforeseen events - be they a natural disaster, an economic downturn or the loss of key
            individuals, businesses or even sponsors.
            Council commits to respectful dialogue with key stakeholders and residents and will ensure that
            opportunities exist for people to be involved in decision-making processes that affect their community.
            In protecting and enhancing our lifestyle, Council will build upon the Shire’s history and our status as a
            Biosphere Reserve under UNESCO's Man and the Biosphere Program.
            Connection with community is integral to individual wellbeing. We will encourage people to take part in
            community life and to use their own creativity to build a sense of place. Our public places will be purpose
            designed to accommodate a range of different uses and needs.

    4.1.1   Key initiatives

       e    Organise and facilitate a community partnership roundtable. This will identify and systematically consider
            and address key local social issues.
       e    Develop an interactive community facility database (including school facilities) with the aim of maximising
            use of existing assets.
       e    Review Council managed facilities to optimise usage
       e    Encourage, promote and provide both opportunities and appreciation for volunteerism.
       e    Encourage events and celebrations that bring communities together and recognise days of national or local
            importance.
       e    Partner with key stakeholders to encourage broad community participation in activities that protect and
            enhance the environmental values of the Shire.
       e    Undertake a service mapping exercise of providers in order to identify gaps and potential opportunities for
            partnering in service delivery.
       e    Encourage similar support groups and service providers to co-locate in order to provide better combined
            services and reduce duplication.

                                                                                                                  14

                                                                                                            Page 28 of 73

Section 29

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 29 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                              _ 15 SEPTEMBER 2015

       e    Partner with Government agencies and service providers to collate and share localised data and statistics to
            inform social priorities, and advocate for additional resources to the Shire.
       e    Develop disaster management plans and resilience strategies for at risk local communities and groups.
            4.2      Active and Healthy Communities
            Council aims to nurture individual and collective health and wellbeing. We recognise that while individuals
            are responsible for their day-to-day behaviours, governments can influence or enable healthy lifestyle
            choices. This can occur through the provision of high quality facilities, the delivery of accessible programs and
            services, and also as a result of environmental protections and regulations.
            Council will work with other levels of government and relevant agencies to ensure that essential services
            such as medical care, power, water, communications and other essential infrastructure are in place to meet
            the needs of Noosa residents. Furthermore, we will partner with key stakeholders to support initiatives that
            aim to prevent disease both mental and physical.
            Council will continue to provide and maintain a range of high-quality sporting, recreational and leisure
            facilities that promote healthy living, social interaction and individual wellbeing.
            Noosa’s parks, gardens and public spaces, will enable and encourage incidental and purposeful physical
            activity to support active, healthy lifestyles.
            We will maintain our physical environment so that it is clean and safe. Council will also encourage people to
            make lifestyle choices that minimise waste and reduce negative impacts on the environment.
            Council will provide opportunities for inclusive participation by all residents. Noosa’s sports and recreation
            industry will thrive, facilitating year round competitions, high profile events and the emergence of elite
            athletes and sportspersons.
            Strong collaborative partnerships and effective planning will be integral to developing measures to improve
            Noosa Shire’s health and wellbeing.
    4.2.1   Key initiatives
       e    Develop and implement a Sport, Active Recreation and Open Space Plan.
       e    Proactively work with government agencies and other commercial and not-for-profit organisations to reduce
            preventative diseases.
       e    Provide quality play spaces for our children.
       e    Continue to support and develop the Noosa recreational trail networks.
       e    Advocate for and encourage low-cost sustainable community initiatives that promote healthy lifestyle
            choices across the Shire.
       e    Advocate for and encourage local programs and services that aim to prevent mental illness and social
            isolation.
       e    Enhance community safety through the implementation and application of Crime Prevention through
            Environmental Design (CPTED) principles.
       e    Develop and implement behavioural change strategies to help achieve Council's Towards Zero Waste —
            Waste Minimisation Plan.
       e    Assist community groups and sporting organisations to maintain their community assets.
       e    Undertake a review of land requirements to meet the objectives highlighted in the Social Strategy.

            4.3      Accessible, Diverse and Affordable Communities
            Council aims to ensure there are accessible and affordable spaces and places for people to live, to meet, and
            to play.   Council will aim to influence housing affordability by encouraging a diversity of housing
            opportunities.

                                                                                                                   15

                                                                                                             Page 29 of 73

Section 30

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 30 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                15 SEPTEMBER 2015

            Council values and embraces diversity, be it cultural, spiritual, ethnic or capacity-based. We want to assist
            our community to be tolerant, inclusive and welcoming. We will strive for social equity by advocating to
            ensure vulnerable groups have access to appropriate support so they can fully participate in our community.
            We recognise that people with a disability are an integral part of our community. We will put in place
            mechanisms to support residents with disabilities, and we will encourage them to participate in community
            life at a level of their choosing.
            Recognising that the Shire’s roads and transport networks are vital to ensure access to and interconnectivity
            between towns, centres and facilities, Council is developing a new Transport strategy. In partnership with
            Translink and other providers, Council will put in place initiatives to make public, community and active
            transport options more attractive with the aim of reducing dependency on private vehicles.
            As well as providing physical infrastructure, Council will invest in building social capital through community
            development. We will ensure that our not-for-profit sector and its many volunteers are recognised, valued
            and supported.
    4.3.1   Key initiatives:
        e   Actively encourage the establishment of social enterprises in the Shire.
        e   Improve and advocate for inclusive access to public places, spaces and services.
        e   Work with the traditional owners and the local indigenous community to incorporate their needs and views
            in policy development.
        e   Develop a social procurement policy and incorporate social benefit criterion into Council’s procurement
            processes.
        e   Advocate to Federal and State Governments for increased support for social service provision where need
            and gaps arise.
        e   Plan for an increased numbers of elderly people living independent.
        e   Advocate for increased flexible respite opportunities for the frail aged and people with a disability.
        e   Work with the community and relevant Federal and State Government agencies to assist the implementation
            of major social reforms such as the National Disability Insurance Scheme and Domestic Violence initiatives.
        e   Undertake a Housing Needs Analysis to inform planning and future advocacy
        e   Work with government agencies, not-for-profit organisations and the business sector to explore innovative
            ways of tackling housing affordability.
        e   Encourage inclusive participation in community activities for people with a disability.
        e   Continue to facilitate improvements in public transport, plus walking and cycling facilities to lessen
            dependency on private vehicles.

            44        Creative and Informed Communities
            Knowledge, creativity and innovation are key components to a flourishing community. They enrich individual
            lives and community environments, assist with problem solving and help create a shared identity. They
            articulate and reinforce our community values.
            Council recognises that the arts and creative industries play a central role in the way we view ourselves
            through music, books, film, theatre, art, festivals, fashion, design and architecture. Cultural pursuits generate
            a sense of pride, help reflect our special place to the rest of the world, and support our local economy. We
            will value and encourage opportunities to highlight the creative talents and unique cultures that exist in our
            local community.
            Council respects our past: from our Indigenous Aboriginal heritage to our contemporary culturally-diverse
            heritage. We will help preserve our heritage and provide opportunities to better understand our shared
            history.
            Council understands the importance of information, knowledge and education. We will facilitate access to
            quality information, support life-long learning and place high value on innovation. We will respect
            community debate and commit to transparent decision-making. Our libraries and galleries will continue to
            act as community and cultural hubs and centres of learning.
                                                                                                                   16

                                                                                                              Page 30 of 73

Section 31

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 31 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                               _ 15 SEPTEMBER 2015

    4.4.1   Key initiatives:
        e   Develop and implement an Arts, Cultural and Heritage Plan.
        e   Work with architects, artists, designers, craftspeople and cultural organisations to develop and expand the
            Shire’s creative industries.
        e   Use social media and emerging technologies for information sharing and lifelong learning purposes.
        e   Encourage local innovation and creative responses to community issues.
        e   Facilitate the co-location of community groups for the purpose of resource and information sharing.
        e   Respect Noosa’s history and heritage through preservation and celebration.
        e   Promote and provide assistance to local festivals, events and celebratory activities.
        e   Develop and implement a five-year Library Strategic Plan.
        e   Explore opportunities to better utilise the Noosa Regional Gallery.

      5       Implementation

            5.1       Council's Role
            Council will continue to play an important role in helping the community achieve the best social outcomes
            through:
        e   Policy development that recognises community needs
        e   Working in partnership with residents and local organisations in the best interests of the community
        e   Providing services, facilities, funding and programs that meet community expectations within Council’s
            financial sustainability guidelines
        ¢   Appropriately regulating acts, legislation and laws on behalf of the community
        e   Educating residents to assist them to understand Council actions and Council's role, and
        e   Acting as a catalyst and an advocate for changes that will benefit our community.

            The cost of implementing all of the key initiatives in this strategy is beyond the capacity of Council alone. To
            this end, Council will be seeking partnerships and strategic alliances with external agencies, businesses,
            community groups and individuals to achieve our goals.

      6       Measurement, Reporting and Review
            In order to ensure that this Strategy is a useful document for Council, the community and stakeholders,
            Council will:
        e   Develop a detailed implementation plan to address the existing commitments and identified key initiatives of
            the Strategy
        e   Identify responsible agencies and partnership opportunities
        e   Undertake and appropriately resource the initiatives within this implementation plan
        e   Report against the implementation plan every twelve months
        e   Monitor progress against Council’s community key indicators
        e   Review the implementation plan every three to five years.

      7       How you can be involved

            Individuals can be involved in various consultations that Council conducts. A good place to start is through
            our online engagement portal http://www.noosa.qld.gov.au/get-involved. Residents can also:
        e   Volunteer with a community organisation and thus contribute to community life
        e   Reach out to neighbours to enhance connectivity and wellbeing in neighbourhoods
        e   Help keep Council informed about the needs and aspirations of residents.

                                                                                                                   17

                                                                                                              Page 31 of 73

Section 32

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   15 SEPTEMBER 2015




                                                           Page 32 of 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    _ 15 SEPTEMBER 2015

           Council would welcome approaches from businesses and community organisations who wish to partner on
           any of the proposed key initiatives in this strategy and would encourage organisations and government
           agencies to consider becoming involved in the community partnership roundtable initiative.

                                                                                                        18

                                                                                                   Page 32 of 73

Section 33

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                     15 SEPTEMBER 2015


Community Facilities
4                        THE J BUSINESS PLAN 2015 - 2018 REPORT
DOCUMENT INFORM AT ION




Author                              Community Facilities Manager, Ashley Saward
                                    Community Services Department

Index                               ECM/ Subject/ 72.01 The J

Attachments                         1.   The J Business Plan 2015 – 2018 (35 pages - provided separately to
                                         this agenda – 2 hard copies are available in the Councillors Room)
                                    2.   The J Service Review 2014 – 2015 (41 pages – provided separately to
                                         this agenda - 2 hard copies are available in the Councillors Room)

EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Community Facilities Manager to the Infrastructure &
Services Committee meeting dated 15 September 2015 and approve The J Business Plan
2015-2018.

REPORT
The purpose of this report is to advise Council of The J business planning process 2015 – 2018,
and to propose a business plan for adoption.
The J is a unique facility that includes a 330 seat theatre, with a new option of including 45
additional seats in the upper mezzanine section, if required. It also offers flexible meeting spaces,
conference rooms and facilities for hire, which are complemented by covered outdoor areas and
stylish open foyers.
The J operates as a versatile, multi-use community venue. It hosts a wide range of
performances, live entertainment, and community activities. It also has two long-term tenants: the
University of the Sunshine Coast (incorporating TAFE) and Noosa Community Radio.
The J is the venue of choice for a number of community organisations, including Noosa Chorale,
Noosa Heads Jazz Club, Noosa Music Society, Independent Retirees Association, Queensland
Arts Alliance and Hillsong Church. Numerous school groups also utilise the facility, conducting a
range of activities such as performances and awards/presentation ceremonies.

1. THE J SERVICE REVIEW 2014
In 2014 The J underwent a service review in order to examine the use of its resources, and how
these can be fully utilised to meet the needs of the community. This comprehensive review
included the following elements:
                       service activities
                       service obligations
                       key stakeholders
                       budget information
                       employee resources
                       levels of service
                       asset management
                       benchmarking with similar venues
                       options to grow the business
                       SWOT analysis.
                                                                                              Page 33 of 73

Section 34

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          15 SEPTEMBER 2015


Following the service review, a business plan has been developed to enhance The J’s
performance over the next three to five years.
As the service review identified a need for Council to continue to subsidise The J at levels in line
with comparable performance and community venues across Australia, the aim for the business
plan was to identify actions and opportunities to increase Council’s return on investment. The
business plan looks to achieve this by providing actions that:
   increase community benefit and value; and
   reduce the net cost to Council.


2. THE J BUSINESS PLAN 2015-2018
External consultants (99 Consulting) were engaged to help facilitate the business plan. The final
business plan draws on both the work done for the service review as well as previous venue
planning projects, with some additional research and analysis. The business planning process
included:
   review of documents and data
   interviews with key staff
   desktop investigation of competition and pricing factors
   a workshop with The J’s staff and management.
The development of the business plan did not include consultation with the community or users
of The J.
Through the development of the business plan it was determined that broadly speaking, The J
delivers outcomes for the Noosa community across four domains:
   Community: The J provides an accessible venue so that Noosa people of all ages can
     participate in an active, connected community.
   Cultural: The J makes possible arts activities and cultural participation and experiences for
     residents of and visitors to Noosa Shire.
   Economic: The J brings business to Noosa Junction and contributes to the Shire’s
     economy by enabling tourism and business events.
   Learning: The J provides a venue for face-to-face education in Noosa.
In order to achieve these outcomes, the business plan focuses on actions to be taken under five
broad headings:
1.     Our Business: products and services.
2.   Our Market: customers and competitors.
3.   Our Operations: staffing and systems.
4.   Our Financial Performance.
5.   Our Future: positioning The J for the longer term.




                                                                                     Page 34 of 73

Section 35

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                     15 SEPTEMBER 2015


More specifically, the business plan includes the following key goals and objectives:

  Strategic goal                               Objective
  Increase community benefit                   1. Enhance performance against Community, Cultural and
                                                  Economic outcome measures
                                               2. Increase utilisation of all spaces in the venue
                                               3. Increase audiences and performances and events at The J
  Improve financial sustainability             4. Increase revenue
                                               5. Reduce net cost to Council
                                               6. Increase revenue from commercial user types as a
                                                  percentage of revenue
  Better understand customer wants             7. Improve customer experience
  and needs
  Build organisational capacity                8. Implement system improvements to enable success
These actions are further developed in a 2015 – 2018 year-by-year action plan:

                             •Set the scene:

           2015-16            develop
                              capacity and
                              set goals




                           2016-17 •Act one: grow
                                    the business




                                                               •Act two:
                                                2017-18         consolidate
                                                                growth




                                                                              •Interval:

                                                              2018-19          review service
                                                                               and refocus
                                                                               plan


2015-16 key actions:
   Develop marketing strategy.
   Implement workable financial analysis tools.
   Develop partnerships with key stakeholders.
   Develop an asset management plan.
   Develop tools to report on KPIs.
   Implement entrepreneurial program.
   Review ticketing system alternatives.
   Finalise agreements with key hirers/lessees.
   Monitor progress on Certified Agreement.
   Refine occupancy targets.
   Improve data collection and reporting.
   Introduce new venue hire rates.
   Develop a risk management plan.
   Continue to promote kitchen hire as a revenue opportunity.
   Articulate community service obligations based on analysis of subsidies for community
     outcomes.
   Develop business cases for budget increases.
   Reinforce positioning of The J as a multi-purpose community cultural venue.

                                                                                                Page 35 of 73

Section 36

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                15 SEPTEMBER 2015


2016-17 key actions:
   Market to promoters and tour organisers.
   Increase staff capacity.
   Publish outcome reports to Councillors and other stakeholders.
   Link with Council plans and strategies.
   Refine understanding of occupancy opportunities.
   Explore diversification opportunities, e.g. catered functions.
   Undertake community research to better understand customer wants and needs.
   Increase entrepreneurial activity based on analysis of year one seed funding results.
   Fully implement marketing strategy.
   Review fees based on market feedback.

2017-18 key actions:
   Review and refine marketing strategy.
   Increase utilisation to fill occupancy gaps.
   Include community benefit assessment in analysis of current and potential hires.
   Revise service review.
Following the adoption of the business plan, management will embark on undertaking the actions
as recommended. It is estimated that the combined effects of implementing the actions over the
next 3 years will result in the net annual operating financial performance of The J improving by a
minimum of $38,635.
Progress against the actions highlighted in this report will be monitored via a series of key
performance indicators (KPIs). Management have developed a list of provisional KPIs which will
be given further consideration over the coming weeks. Once finalised, KPIs will be monitored
closely to ensure progress tracks in line with the documented targets.
Previous Council Consideration
Nil
Finance & Risk
Refer to Section 2 of this report.
Consultation
External Consultation - Community & Stakeholder
99 Consulting
Internal Consultation
Community Facilities staff
Financial Services Manager
Departments/Sections Consulted:
x     Community Services                          Planning & Infrastructure
      Disaster Management & Public Order          Building & Plumbing Services
      Waste & Environmental Health                DA Planning
x     Community Facilities                        Strategic Land Use Planning
      Cultural Facilities                         Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

      Executive Office                        x   Corporate Services
      Community Engagement                    x   Finance
      Customer Service                            ICT
      Executive Support                           Procurement & Fleet
      Governance                                  Property & Facilities
      Human Resources                             Revenue Services



                                                                                        Page 36 of 73

Section 37

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               15 SEPTEMBER 2015


Disaster Management & Public Order
5                        LOCAL LAWS UPDATE REPORT TO 31 JULY 2015
DOCUMENT INFORM AT ION




Author                             Acting Local Laws Manager, Phil Amson
                                   Community Services Department

Index                              ECM/Subject/Branch Management/Community Services Department

Attachments                        Nil


EXECUTIVE SUMMARY
Not Applicable.

RECOMMENDATION
That Council note the report by the Acting Local Laws Manager to the Infrastructure & Services
Committee Meeting dated 15 September 2015 providing an update on the activities of the Local
Laws Branch activities for the period ending 31 August 2015.


REPORT
The purpose of this report is to advise Council of the Local Laws Branch activities for the period
from 1 May to 31 August 2015.

The Branch has responsibility for regulated parking, animal management, and the regulation of
Local Laws & State Acts under Council’s jurisdiction. The Branch supports a number of other
branches within the Organisation, to achieve compliance with the local laws they enforce.

Formerly known as Disaster Management and Public Order, the Branch was renamed Local
Laws as a result of the transfer of Community Resilience and Disaster Management
responsibilities to Infrastructure Services as part of the 2015/16 budget process.

Although financial responsibility for disaster management operations have been removed from
the Branch a reactive component remains with the Local Laws Branch and the Manager remains
the Centre Manager in the Local Disaster Coordination Centre.


1.                       FINANCE

The objective of the Local Laws Branch is to balance the demands of its regulatory enforcement
role with community expectations of fairness.

In this context the aim of sound financial management is to ensure that the revenue raised is fair
and just and operational costs are used responsibly.

The following tables and graphs show financial performance for the Disaster Management and
Public Order branch in 2014/15 and the status of the Local Laws budget for the month ending 31
July 2015.

Note the Local Laws Operational budget for 2015/16 no longer contains Disaster Management
Operations which has been transferred to Infrastructure Planning.



                                                                                       Page 37 of 73

Section 38

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                         15 SEPTEMBER 2015


            Disaster Management and Public Order Branch Operations 2014/15

                                Benchmark % Complete 100.0%




           2,000,000
           1,500,000
           1,000,000
             500,000
                   0
                         Direct Revenue       Direct Expenditure   Net Operating Result
            (500,000)
          (1,000,000)
                                    2014/15                  2014/15
                                    YTD                      YTD
                                    Budget                   Actuals


The Disaster Management and Public Order branch operating result for the 2014/15 financial
year was within budget overall.

Revenue for Animal Control was slightly higher with revised projections factoring in the
reclassification of animals. Local Laws revenue showed higher revenue due to the issuing of
infringements, court prosecutions and reinstatement and recovery.

Parking infringements were slightly lower with recovery of SPER and Citec search costs higher.
Expenditure for Local Laws was slightly higher due to materials and services relative to the
increased revenue recovery. Parking related search costs were also higher than forecast.




                                                                                    Page 38 of 73

Section 39

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                              15 SEPTEMBER 2015


                                    Animal Control 2014/15




                               1810 - Animal Control
          250,000

          200,000

          150,000

          100,000

           50,000

                0
                       Direct Revenue        Direct Expenditure        Net Operating Result
                                     2014/15                   2014/15
                                     YTD                       YTD
                                     Budget                    Actuals


As reported in April 2015, the 2014/15 animal management budget, overestimated the dog
registration revenue by approximately $180,000. This was mainly due to the fact that the
majority of dogs were de-sexed and a large number owned by pensioners, thus paying lesser or
no fee. This was further complicated by estimates for the house to house dog audit, where an
estimated 1500 dogs (based on national statistics) were expected to be added to Council’s
system with the vast majority of those dogs being entire. Although 1780 new dogs were located
the majority again were de-sexed and micro chipped. This meant that revenues from the house
to house dog audit were well below the projected income. These issues were amended in BR4.
On the positive side, the results of the 2015 dog audit have revealed that Noosa Shire has one of
the highest percentages of de-sexed dogs in the state with almost 90% of dogs in the community
being de-sexed. This reflects the success of the “responsible pet ownership” media campaign
that has been promoted in Noosa shire over the past 20 months. This campaign is now being
used to target a spike in dog attacks during the last days of August, with 11 attacks being
reported over a 9 day period in late August.

At year end Animal Control revenue was slightly higher with revised conservative projections
factoring in the reclassification of animals. Expenditure was also higher due to relocation of
employees to this cost centre and the movement of leave provision for these employees.




                                                                                         Page 39 of 73

Section 40

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                              15 SEPTEMBER 2015


                                         Parking 2014/15




                            1811 - Parking Supervision
          700,000
          600,000
          500,000
          400,000
          300,000
          200,000
          100,000
                0
                       Direct Revenue        Direct Expenditure        Net Operating Result
                                     2014/15                   2014/15
                                     YTD                       YTD
                                     Budget                    Actuals


Parking revenue for the 2014/15 budget finished above the original budget estimate of $423k,
with only a slight variance to the revised budget of $633k.

Previously identified issues of incorrect revenue allocation to SPER (State Penalties Enforcement
Registry) and CITEC (system used to locate Qld registrations) were amended in BR4 with related
cost being 20% higher.

A reduction in the provision of Regulated Parking Patrols throughout May, June and July allowed
for budgeted labour hire expenditure to be minimised, although this did lead to an increase in
customer complaints.

                     Local Laws Operations period ending 31 July 2015
                               Benchmark % Complete 8.3%




                                                                                         Page 40 of 73

Section 41

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                   15 SEPTEMBER 2015



                                           Local Laws
        140,000
        120,000
        100,000
         80,000
         60,000
         40,000
         20,000
              0
                      Direct Revenue             Direct Expenditure           Net Operating Result
                                       2015/16                        2015/16
                                       YTD                            YTD
                                       Budget                         Actuals

Local Laws branch budget for July is on track with the variance being in employee expenditure
resulting from not filling the vacancy of the Disaster Management and Public Order Manager
position.
                         Animal Control period ending 31 July 2015




                               1810 - Animal Control
           40,000
           30,000
           20,000
           10,000
                  0
          (10,000)
          (20,000)
          (30,000)
          (40,000)
                       Direct Revenue       Direct Expenditure       Net Operating Result
                                    2015/16                  2015/16
                                    YTD                      YTD
                                    Budget                   Actuals

The animal control budget 2015/16 is on track. There is an employee expense variance resulting
from an incorrect staff allocation to be adjusted in August. RSPCA contract costs have been
accrued with invoices still to come.


                                                                                               Page 41 of 73

Section 42

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                         15 SEPTEMBER 2015


                         Parking 2015/16 period ending 31 July 2015




          40,000
                             1811 - Parking Supervision

          20,000



               0
                       Direct Revenue       Direct Expenditure   Net Operating Result



Parking expenditure is down in July due to employee costs being lower and a delay in search
cost being allocated.


2.   CUSTOMERS

During the past four months the branch received over 1800 phone calls, generating 993
Customer Requests. Animal management topped the charts with 679 requests and had an
average completion time of 42 days. Other requests had an average completion time between 7
and 28 working days. Interestingly, in a time and motion study over the month July, in excess of
450 man hours were spent on animal management complaints.

           Activity               No of complaints                Average time to
                                                                  complete
           Animal management      679                             42 days
           Illegal camping        37                              5 days
           Local laws             97                              28 days
           Parking                125                             5 days
           Abandoned vehicles     51                              7 days
           Illegal tree removal   4                               28 days




                                                                                        Page 42 of 73

Section 43

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               15 SEPTEMBER 2015


During the period 1 May – 31 July 2015 there were:

 10057 Dogs registrations in the period   This figure includes the remainder of the dog audit.
 68 Animal fines + 6 Official Cautions    Offences included the animal “not being under effective
                                          control”, being “in a prohibited area” or “failure to register”.
                                          There were 56 animal fines issued during the previous.
 9 Local Law fines +                      Offences included “illegal removal of trees”, “littering” and
 1 Official Caution (10)                  “prohibited activity (camping)”. This compared with 23 local
                                          law fines issued in the previous period
 1910 Parking fines issued +              This compared with 2,804 parking fines issued for the previous
 303 Official Cautions (2213)             period.

3.    PEOPLE

The former manager, Ron Thomas has now retired. He ceased work on 15 May 2015 and his
position has been backfilled by Phil Amson, Local Laws Coordinator. There has been no backfill
of the Coordinator role.

4.    SYSTEMS & PROCESSES

The new suite of Local Laws was gazetted and came into effect from 1 July 2015.

This ushered in the next phase of delivering the new laws by way of ensuring operational
effectiveness. To date there has been no reported operational issues from the implementation of
the new local laws, with all systems and official paperwork being updated to reflect the changes.

The Local Law service review is ongoing with a projected completion date of September 30. As
noted above in July 2015, the section undertook an activity based costing exercise, a detailed
time and motion study and a review of customer response time.

Systems analyst Paul Vellacott has been flow charting local law branch processes and is
currently developing recommendations on streamlining and improving systems.

A field trial of a new T1 based infringement system is due to begin on the 17 September. If
successful this will replace the antiquated Duncan Autocite technology with field officers. It will
utilise the Cloud based T1 system from the field using iPhone apps and Bluetooth printers. If
successful this trial will result in time and cost savings to the organisation.

5.    FUTURE DIRECTION

The final stage of the Local Laws Service review is due by end of September 2015. It is expected
that, as a result of this extensive review, further improvements will be made available to the Local
Laws Branch thus enhancing the operational performance of the team.

Previous Council Consideration

Ordinary Meeting 4 June 2015

That Council note the report by the Disaster Management and Public Order Manager to the
Infrastructure & Services Committee Meeting dated 26 May 2015 providing an update on the
activities of the Disaster Management & Public Order Branch activities for the period ending
30 April 2015.

Finance & Risk

Refer Section 1 Finance.

                                                                                           Page 43 of 73

Section 44

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                             15 SEPTEMBER 2015


Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Management Accountant - Finance

Departments/Sections Consulted:

x     Community Services                       Planning & Infrastructure
      Disaster Management & Public Order       Building & Plumbing Services
      Waste & Environmental Health             DA Planning
      Community Facilities                     Strategic Land Use Planning
      Libraries & Galleries                    Asset Design & Investigations
      Community Development                    Asset Planning
                                               Civil Operations
                                               Environment

      Executive Office                     x   Corporate Services
      Community Engagement                 x   Finance
      Customer Service                         ICT
      Executive Support                        Procurement & Fleet
      Governance                               Property & Facilities
      Human Resources                          Revenue Services




                                                                                     Page 44 of 73

Section 45

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                             15 SEPTEMBER 2015


Libraries & Galleries
6                        BUTTER FACTORY ARTS CENTRE MANAGEMENT
DOCUMENT INFORM AT ION




Author                              Special Projects Officer, Emma O’Neill
                                    Planning & Infrastructure Department

Index                               ECM/ Subject/ 72.04 Butter Factory Arts Centre

Attachments                         Nil


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Special Projects Officer to the Infrastructure & Services
Committee Meeting dated 15 September 2015 and:
A.                       Adopt Option A (as set out in the Report) and authorise the CEO to enter into an
                         agreement with the Cooroy Lower Mill Board to operate the Butter Factory Arts Centre on a
                         12 month trial basis, commencing 1 January 2016; and
B.                       Provide a 12 month operating subsidy of $120,279 to the Cooroy Lower Mill Board on the
                         basis that the Board provide six monthly acquittals.


REPORT
Following considerable community consultation on the operation of the Butter Factory Arts
Centre (BFAC) in 2014/15, Council resolved at the Ordinary meeting on 12 March 2015 to:
A.                       Adopt Option 3 as its preferred option;
B.                       Staff consulting with the Cooroy Lower Mill Board to develop a Business plan and budget to
                         present to Council in a future report; and
C.                       Continue to maintain the Butter Factory and Pottery Shed buildings.

Option 3 proposed a hybrid community management model with the Cooroy Lower Mill Board
(CLMB) as the facility manager, and U3A and Centre for Ceramic Excellence as anchor tenants.

The Special Projects Officer was allocated to lead the development of a business plan in
conjunction with CLMB representatives. With the assistance of Robyn Barrett from Mercer
Enterprises (for financial analysis) the Special Projects Officer has been working with CLMB
representatives on the development of a business plan for the BFAC. Consultation with a number
of key staff within Council has also been undertaken. Through the information gathering process
a number of issues have been identified and it is now evident that a comprehensive business
plan is unable to be completed in a timely manner.

1.                       Current status of the business planning process
Council officers, with the support of CLMB representatives, have commenced drafting a business
plan for the BFAC. Development of the business plan has required the CLMB to undertake a
research process which has included visits to other similar arts facilities. This process has
enhanced their enthusiasm for operating the BFAC and reinforced their belief in providing arts
programs and exhibitions at the BFAC.

                                                                                                     Page 45 of 73

Section 46

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           15 SEPTEMBER 2015


There is however, still a considerable amount of work to be done to develop a robust business
plan because, while CLMB bring a wealth of local knowledge, support and commitment to the
task of managing the BFAC, CLMB needs to further develop its overall purpose, structure,
programming and activities to successfully operate the facility.
The CLMB are keen to develop a detailed business plan but in order to do this they require an
experienced staff resource to explore and trial programming options and provide the detailed
information required for the business plan/feasibility. In order to engage such a resource the
CLMB require funding.
Given the gap between the Council resolution in March and the completion of the business plan,
a level of confusion is becoming evident within the Cooroy community regarding who is operating
the BFAC. The CLMB have already had a number of approaches and proposals for activities
within the BFAC which they are unable to act upon as they are not currently operating the facility.
Difficulties in developing the business plan have also arisen as current operations are not a
reasonable benchmark to predict future operations and in particular, future revenue opportunities.
Council is currently operating the BFAC in a ‘caretaker’ mode with limited programming which
makes it difficult to provide the CLMB with a fully operational ‘business as usual’ model,
particularly where revenue sources are concerned. Historical information has been difficult to
find and provide to assist CLMB form the basis of ‘business as usual’. In fact, actively seeking
revenue sources has not been a focus at the BFAC for the past four to five years. In turn, this
requires the CLMB to make a number of assumptions around the programming opportunities that
may arise for the CLMB operation of the BFAC.
Robyn Barrett of Mercer Enterprises has undertaken financial analysis with the available data.
She was able to forecast base operating expenditure based on Council’s previous expenditure
however forecasting revenue was problematic. She noted that while there were potentially
credible ideas for activities and revenue streams, these needed to be developed in much further
detail to enable robust financial analysis.
Based on the need for a high level of assumptions and increased staffing, indicative financial
projections and analysis undertaken by Mercer Enterprises indicate that the Council subsidy will
be higher than estimated in the report to Council on 3 March 2015. The proposed 12 month
subsidy is $120,279, compared to $80,000 proposed previously. The main reason for this is the
additional level of staffing required to cover a five to six day operation (including weekends and
after hours) which equates to approximately 1.5 FTE. Some of this on site staffing was originally
anticipated to be covered by in-kind support from U3A. The CLMB will undertake overall
management, planning and programming for the BFAC and have indicated that, given the
existing commitments of their members, they are not it a position to undertake the day-to-day
operation of this public facility and will require sufficient staffing to do this.
Programming of PopUp Art (and other) exhibitions have been scheduled by Council until
December 2015. It is important to note that the PopUp Art exhibitions are nearing the end of
their current life and it is not expected that exhibiting will continue beyond December 2015.
It is also important to note that through the business planning process it has been identified that a
number of capital improvements including acoustic treatment and better disability access will be
required to enable greater simultaneous use of the spaces at the BFAC.
Finally, the business planning process has identified that the previously recommended approach
of bringing together the CLMB with two anchor tenants (U3A and the CCE) is no longer viable.

2.    Anchor Tenants
On 12 March 2015, Council adopted the option for the BFAC to be a community managed facility
with Council providing financial support to a community organisation (namely CLMB) to manage
and activate the facility with an understanding that CLMB would work with U3A and Centre for
Ceramic Excellence (CCE) as ‘anchor tenants’. The ‘anchor tenants’ would ideally provide
financial or ‘in-kind’ contributions.

                                                                                      Page 46 of 73

Section 47

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                        15 SEPTEMBER 2015


Subsequent investigation through the business and transition planning process has indicated that
tenancy by U3A and CCE cannot proceed as originally planned.
The intent was for U3A to provide activation through use of the BFAC, as well as the potential for
in-kind support such as administration resources, volunteers and assistance with grant funding.
This in-kind support would reduce the staffing burden on CLMB.
The U3A Management Committee has recently changed and subsequently decided that they no
longer have the resourcing to establish and operate a U3A sub-branch at Cooroy. U3A are
however continuing community consultation and if there is enough interest and drive from the
Cooroy and hinterland community to establish a Cooroy U3A branch, then the Noosaville branch
will be available to provide advice and assistance to establish the new branch. If a Cooroy U3A
is established, the committee will continue to work with the operator of the BFAC to investigate
venue hire options.
The CCE will not be a major user of the BFAC in the short term. As a young organisation their
focus is now centred on holding a major wood firing conference in 2017, at which time they will
hire the BFAC. However, the CCE and regular Potters located at the BFAC have been in
consultation to look at ways to improve usage and revenue streams at the pottery shed and are
currently working on a grant submission to replace the pottery wheels in the pottery shed.
The two proposed anchor tenants in the proposed business plan will not come to fruition in the
short term.

3.   Options
The business planning process is in somewhat of an abeyance. CLMB continue to maintain their
enthusiasm and drive to operate the BFAC, however the difficulties highlighted above
demonstrate that it may simply be too early for the development of a long term business plan and
long term agreement due to lack of certainty about potential revenue.

Therefore, the following options are proposed:
A.   Council enters into a trial operation arrangement with CLMB for 12 months.
B.   Council continues to operate the BFAC under a ‘caretaker’ model with limited
     programming, essentially a venue for hire.
C.   Council continues to operate the BFAC and undertakes the role of activating the BFAC.
D.   Council investigates other uses for the BFAC.

Option A. Council enters into a trial operation arrangement with CLMB for 12 months.
CLMB operation of the BFAC was identified through the community engagement process as
most closely aligned with the community aspirations for the BFAC based on past experience.
Under Option A, Council would enter into an agreement with the CLMB to operate the BFAC for a
12 month period. This time would allow the CLMB to engage an expert to establish the viability
of the programming options and other ideas at the BFAC, with an expectation that the feasibility
of a long term business plan can be determined by the end of the 12 months for the ongoing
operation of the BFAC based on actual revenue. Should CLMB determine that the operation of
the BFAC is not viable, or should Council determine that the operational subsidy required for the
operation of the BFAC is too onerous, the arrangement would cease and one of the other options
below explored further.
In short, a 12 month trial should determine whether this community based model will work or not.
Council would provide an operating subsidy to CLMB for the 12 month period. This amount will
be capped at $120,279 and an acquittal process would be undertaken at 6 monthly intervals.
The acquittal process should also help with the development of the business plan should CLMB
determine they are able to operate the BFAC beyond the initial 12 month trial period.


                                                                                   Page 47 of 73

Section 48

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                            15 SEPTEMBER 2015


It is anticipated that CLMB would commence operating the BFAC on 1 January 2016, with a
transition occurring from October. Council would continue to undertake day-to-day operations
during the transition however the CLMB and their staffing would work with Council staff to
understand the building and plan for programming and exhibitions to commence from January. A
subsidy of $12,600 would be required for CLMB to staff the transition period October to
December 2015. This amount can be met within the current budget.
As highlighted in the Infrastructure & Services Committee meeting report to Council on 3 March
2015, ‘There [remain] some risks associated with this proposed model. While individual CLMB
members have facility management experience, the CLMB itself has not managed a community
facility and their successful relationship to other stakeholder groups and individuals needs to be
developed. In order to manage these risks, it is recommended that Council clearly establish roles
and responsibilities by way of a Memorandum of Understanding [or Agreement] between Council
and the CLMB.’
The 12 month trial will allow CLMB to test programming and operational assumptions to
determine whether continued CLMB operation of the BFAC is viable. If it is not, then the other
options in this report can be further explored.
As noted in section 2, the business planning process has allowed the CLMB to start building
relationships with stakeholders and interested parties. This puts them in a good position to
commence greater activation of the BFAC should Council adopt Option A.
This model also meets the preferred outcome of community management of the BFAC identified
through the community engagement process undertaken in 2014/15.

Option B. Council continues to operate the BFAC under a ‘caretaker’ model.
Under this option, Council would operate the BFAC in a ‘caretaker’ model primarily offering the
facility as a venue-for-hire and overseeing the Pottery. Cooroy Library staff would manage the
building, take bookings and facilitate access. There would be limited Council programming or
curated exhibitions and the building would only be open to the public if a hirer undertook this.
This model could be funded within the current net budget for the 2015/16 financial year of
$233,311 including depreciation and corporate overheads.
It is important to note that the PopUp Art exhibitions are nearing the end of their current life and it
is not expected that exhibiting will continue beyond December 2015. Any further programming or
exhibitions would require Council staff to source exhibitions or artists in the community to step
forward and hire the venue and staff exhibitions.
The benefit of this model is that it would determine what the “latent” demand for the facility
actually is i.e. how many requests to use the facility will be made if it is not being actively
marketed or promoted.
This model does not meet the preferred outcome of community management identified through
the community engagement process undertaken in 2014/15 but it would be the cheapest of the
community use based options.

Option C. Council continues to operate the BFAC and undertake an ‘activation’ role.
Programming of exhibitions and events would be managed by Council staff with additional
support provided by volunteers. While the arts focus would continue there would be no significant
increase in community engagement or ownership.
In order to further activate the use of the BFAC, staffing levels would need to increase to program
and staff the facility. The estimated impact of this would be $80,622, resulting in an adjusted
budget for the 2015/16 financial year of $313,933.
This model was identified as unsustainable through the community engagement process
undertaken in 2014/15, and it does not meet the preferred outcomes identified through that
process. It would be the most expensive of the community use based models.

                                                                                       Page 48 of 73

Section 49

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                       15 SEPTEMBER 2015



Option D. Council investigates other uses for the BFAC.
While the community engagement process undertaken in 2014/15 explored many options, the
potential for non-community use of the BFAC site was not investigated.
If the community management model proves to be unsustainable in the long term, Council could
investigate the possibilities for other uses of the site. The current zoning is Community Use
however the BFAC’s original use was commercial in nature. A design studio or showroom, etc
and potentially other like uses other uses in keeping with the overall Lower Mill site and the
historical use of the building.
This option would require Council or potential tenant to undertake a Material Change of Use
application or the zoning could be considered through the development of the new Planning
Scheme.
This model does not meet the preferred outcomes identified through the community engagement
process undertaken in 2014/15 which opposed commercial use of the BFAC and sought greater
community involvement. However, if the proposed 12 month management trial by CLMB proves
unsuccessful, this option may warrant further consideration.

Previous Council Consideration

Ordinary Meeting 12 March 2015

REVIEW OF THE OPERATIONS OF THE COOROY BUTTER FACTORY.
That Council note the report by the Director of Community Services to the Infrastructure &
Services Committee Meeting dated 3 March 2015 and agree to:
A. Adopt Option 3 as its preferred option;
B. Staff consulting with the Cooroy Lower Mill Board to develop a Business plan and budget to
      present to Council in a future report; and
C. Continue to maintain the Butter Factory and Pottery Shed buildings.

Finance & Risk

Summary of options

The 2015/16 net total budget (including depreciation and corporate overheads) for the BFAC is
$233,311.

The 12 month trial recommended is proposed to commence 1 January 2016, therefore crossing
over into the 2016/17 financial year. For comparison purposes the 12 month period (1 January to
31 December 2016) has been projected for each option. Note that a 2.5% inflation rate has been
included in the 2016/17 figures for the purposes of calculating projected figures.

Option D has not been costed as further investigation into potential commercial uses and
revenue opportunities would need to be determined through an expression of interest process.




                                                                                Page 49 of 73

Section 50

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               15 SEPTEMBER 2015


The table below outlines the indicative costs under options A, B and C:

                                              Net Operating Cost to         Total Cost to Council
                                                                            (including depreciation &
                                              Council
                                                                            corporate overheads)
 Option A - CLMB 12 month trial                                  $146,097                        $243,898
 Option B - Council caretaker model                              $138,426                        $236,227
 Option C - Council activation model                             $220,056                        $317,858

Option A is slightly higher than the current budget and Option B, however it is important to note
that it will result in activation of the BFAC rather than a caretaker model. It also remains more
cost effective than Council activation under Option C.

Option A. 12 month trial with CLMB

While this option has risks associated with the CLMB’s first foray into managing a facility, it is the
preferred model, representing a lower cost to Council than if Council were to undertake an
activation role. It also meets the preferred outcomes of the community engagement process
undertaken in 2014/15.

Operating costs such as water, electricity, building maintenance, etc. will remain Council’s
responsibility under this option, however many of these costs would be transferred to CLMB
beyond the 12 month trial. CLMB will need to consider these costs for business planning and
future operations.

A review of corporate overheads with Council’s finance section indicates that a substantial
reduction in corporate overheads is also likely under this model, however this has not been
factored into the projected budget for the 12 month period.


                                                    Projected budget 1 January – 31 December 2016
 Revenue                                                                                       $0
 Expenditure                                                                             $146,097
   Continued Council operating expenses
 during CLMB operation ^                                                                            $22,607
   Other Expenses (fire levies and internal
 charges other than corporate o/heads)                                                             $3,211
   Operating subsidy to CLMB *                                                                   $120,279

 Net Operating Cost to Council                                                                  $146,097

 Depreciation & Amortization                                                                        $19,745
 Corporate Overheads                                                                                $78,056

 Total Cost to Council                                                                          $243,898
 Notes:
 ^ Continued Council operating expenses during CLMB operation projected based on 2015/16 budget
 figures.
 * Based on Indicative Cash Flow Analysis undertaken by Mercer Enterprises




                                                                                           Page 50 of 73

Section 51

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                               15 SEPTEMBER 2015


Option B. Council ‘caretaker’ model

The ‘caretaker’ model uses the existing 2015/16 budget to project overall costs across the two
financial years:

                                               Projected budget 1 January – 31 December 2016
Revenue                                                                                  -$8,371
Expenditure                                                                            $146,797
  Employee Benefits**                                                                               $52,900
  Materials & Services***                                                                           $92,946
  Other Expenses                                                                                      $951

Net Operating Cost to Council                                                                      $138,426

Depreciation & Amortization                                                                         $19,745
Corporate Overheads                                                                                 $78,056

Total Cost to Council                                                                              $236,227

** - potentially, this is a worst case scenario based on current levels of usage. If there was a
reduction in usage (for example, no after-hours opening) than the actual cost would be lower.
*** - similarly, lower usage would result in lower costs for services such as electricity, water
usage etc.

Option C. Council ‘activation’ model

Employee costs would increase under this model with a requirement for Council to staff the
BFAC. The figures provided are considered conservative because after hours and weekend
penalties have not been factored into the increased employee benefits calculation. While an
increase in revenue has been factored into this model, it is likely that increased revenue will be
offset by the additional materials and services required to provide programs and exhibitions.
Adoption of this model would require an adjustment to the budget in Budget Review 3.

                                               Projected budget 1 January – 31 December 2016
Revenue                                                                                 -$18,496
Expenditure                                                                            $238,552
  Employee Benefits *                                                                              $134,530
  Materials & Services #                                                                           $103,071
  Other Expenses                                                                                      $951

Net Operating Cost to Council                                                                      $220,056

Depreciation & Amortization                                                                         $19,745
Corporate Overheads                                                                                 $78,056

Total Cost to Council                                                                              $317,858
Notes:
* An additional LGOA Level 4 position has been added under the activation model.
# It is anticipated that revenue increases will be offset by materials and services requirements

                                                                                           Page 51 of 73

Section 52

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                  15 SEPTEMBER 2015


Option D. Investigate other uses

This option will need to be costed should Council wish to pursue further but it would be difficult to
calculate without market testing potential revenue or determining whether there is an actual
market for this type of use. Costs will be incurred for undertaking a Material Change of Use
application. Expressions of interest will need to be sought as an indication of the potential
viability of this option.

Capital Works

Previous reviews have highlighted the need for building modifications to address building
constraints and increase potential uses. During the business planning process, CLMB have
identified areas such as acoustic treatment and disabled access as areas they may be able to
source grant funding to assist with capital improvements.

There are no capital projects included in the 2015/16 capital works budget for the BFAC.

Council Building & Facilities staff are currently investigating significant roof leaks which have
exacerbated over recent months. This will require capital expenditure within 2015/16 to resolve.

Consultation

External Consultation - Community & Stakeholder

Representatives from Cooroy Lower Mill Board
Mercer Enterprises

Internal Consultation

To facilitate the business planning process and the development of this report a number of
internal sources were consulted, including:

Director, Community Services
Manager, Libraries and Galleries
Gallery Director and staff
Management Accountant
Governance Advisor
Grants Officer


Departments/Sections Consulted:

x   Community Services                          x   Planning & Infrastructure
    Disaster Management & Public Order              Building & Plumbing Services
    Waste & Environmental Health                    DA Planning
    Community Facilities                        x   Strategic Land Use Planning
x   Cultural Facilities                             Asset Design & Investigations
                                                    Asset Planning
                                                    Civil Operations
                                                    Environment

x   Executive Office                            x   Corporate Services
    Community Engagement                        x   Finance
    Customer Service                                ICT
    Executive Support                               Procurement & Fleet
x   Governance                                      Property & Facilities
    Human Resources                                 Revenue Services




                                                                                          Page 52 of 73

Section 53

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                       15 SEPTEMBER 2015


Waste & Environmental Health
7                        WASTE MANAGEMENT - ANNUAL REPORT 2014/15 INCLUDING UPDATE TO 31
                         JULY 2015
DOCUMENT INFORM AT ION




Author                             Waste Coordinator, Ian Florence
                                   Community Services

Index                              ECM / Subject / Branch Management/Community Services

Attachments                        Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Waste Coordinator to the Infrastructure and Services
Committee Meeting dated 15 September 2015 providing an update on the Waste Management
Section’s performance over the 2014/15 period and an update on the activities to 31 July 2015.

REPORT
The purpose of this report is to advise Council of waste management activities over the
2014-15 financial year, the first month of the current financial year and planned activities and
initiatives for the next four months.
The Waste Management Section (WMS) is responsible for the delivery of domestic and
commercial waste and recycling collection services for Noosa residents and businesses, holding
tank liquid waste collection servicing, operation of the Eumundi Rd Resource Recovery Facility
including Pomona and Cooroy Waste Transfer Stations.
Collection, landfill and resource recovery services are provided through a small team managing
contracts with the private sector with the aim of maximising resource recovery and reducing
waste to landfill.
1.                       FINANCE
Under the National Competition Policy the Waste Business Unit is required to operate under full
cost pricing principles and to make a return on the investment in the business to Council.

Waste Management 2014-15
Statement of                               2014/15      2014/15       2014/15      2014/15         %        YTD
Income and                                 Original     Current          YTD          YTD     Current   Variance
Expenses                                   Budget       Budget        Budget       Actuals    Budget

Direct Revenue                           12,956,772   12,843,665   12,843,665    13,062,233   101.7%    (218,568)
Direct Expenditure                        8,381,152    8,159,103    8,159,103     7,749,496    95.0%      409,607
Net Operating                             4,575,620    4,684,562    4,684,562     5,312,738             (628,176)
Result
Competitive                                 -52,882      -52,882      (52,882)     (52,882)   100.0%            0
Neutrality
Depreciation                                673,736      621,832       621,832      444,508    71.5%      177,324
Internal Charges                          1,083,541    1,083,545     1,083,545    1,085,189   100.2%       (1,644)
Operating                                 2,871,225    3,032,067     3,032,067    3,835,922             (803,856)
Surplus/(Deficit)


                                                                                                Page 53 of 73

Section 54

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    15 SEPTEMBER 2015



                                        Waste Management
14,000,000
12,000,000
10,000,000
 8,000,000
 6,000,000
 4,000,000
 2,000,000
            0
                       Direct Revenue              Direct Expenditure               Net Operating Result
                                        2014/15                         2014/15
                                        YTD                             YTD
                                        Budget                          Actuals



Month ending July 31 2015

Statement of                 2015/16         2015/16        2015/16          2015/16             %
Income and                   Original        Current           YTD              YTD         Current            YTD
Expenses                     Budget          Budget         Budget           Actuals        Budget         Variance

Direct Revenue            13,415,946      13,415,946      5,659,330         5,748,366         42.8%         (89,036)
Direct Expenditure         8,858,391       8,858,391        702,271           603,133          6.8%           99,138
Net Operating              4,557,555       4,557,555      4,957,059         5,145,233                      (188,174)
Result
Competitive                  518,067         518,067          43,172              43,172       8.3%              (0)
Neutrality
Depreciation                 547,139         547,139         45,595            45,595          8.3%                0
Internal Charges           1,119,584       1,119,584         93,299            93,293          8.3%                6
Operating                  2,372,765       2,372,765      4,774,993         4,963,173                      (188,180)
Surplus / (Deficit)




                                        Waste Management
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
        0
                      Direct Revenue              Direct Expenditure               Net Operating Result
                                        2015/16                         2015/16
                                        YTD                             YTD
                                        Budget                          Actuals


                                                                                               Page 54 of 73

Section 55

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           15 SEPTEMBER 2015


Budget Commentary
The budget for the 2014-15 financial year indicates that revenue was slightly above estimates
and expenditure was below estimates. Waste Management had a Net Operating Result of
$5,145,233, which was $628,176 better than predicted. The operating surplus was $3,835,922,
which was $803,856 above predictions. The Waste Management budget was in a sound position
for the duration of the 2014-15 financial year.
The figures for the first month of the 2015-16 financial year show that the budget is currently on
track with predictions.
Capital Works Projects
Road repairs at Eumundi Road Resource Recovery Centre
Waste Management will commence significant repairs to the entry roads around the weighbridge
at the Eumundi Road Resource Recovery Centre during September 2015. The first stage of the
works will be conducted over 28 days during a break in the bulk kerbside collection service.
The works will require modified traffic conditions at the facility for the period and some disruption
and delays are expected for those using the facility. The works have been advertised on site and
are to be advertised in social media to ensure that the public are aware of the potential
disruption. Stage Two will be carried out in the 2016-17 financial year.
Commissioning of Cell 2.2
Waste Management has recently conducted repairs on the leachate collection system that was
constructed several years ago in Cell 2.2. The repairs were to ensure that the first quadrant of
the cell could be hydraulically isolated from the other three large quadrants for stormwater control
initially and later for leachate management. This will allow Council to commence using just the
first quadrant of the cell for waste disposal and therefore minimising the capture of stormwater
and generation of leachate that will require collection and disposal. It is predicted that Cell 2.2
will start receiving selected waste in February 2016.
High Efficiency Sedimentation (HES) Basin upgrade and Bio Basin
The High Efficiency Sedimentation (HES) Basin upgrade and Bio Basin construction at Eumundi
Road landfill has almost reached completion. The remaining works are to install an automated
monitoring system (SCADA) that will allow Council to remotely monitor the quality of water
leaving the site in real time, ensuring an immediate response should any issues be identified.
This work has been delayed due to negotiations with EHP regarding their water monitoring
requirements.

2.    CUSTOMERS

Solid Waste Collection Services

Bin Service                   1 July 2014            1 July 2015
240 Refuse                    29,263                 29,634
140 Refuse                    67                     68
240 Recycling                 24,371                 24,947
240 Garden                    3,129                  3,714
1m3 Bulk                      33                     28
1100 Refuse                   372                    367
1100 Recycling                264                    290
1.5m3 Bulk                    210                    203
2m3 Bulk                      12                     13
3m3 Bulk                      213                    214
27m3 Compactor                1                      1



                                                                                      Page 55 of 73

Section 56

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                             15 SEPTEMBER 2015


There has been continued growth of green waste garden bin service due to the expansion into
country areas of Cooroy, Pomona, Cooran and Boreen Point. The ongoing discussion of organic
waste recycling by the Community Jury has also prompted interest in the service.
Waste Management are continuing to work with Council’s contractor, Cleanaway to reconcile bin
numbers and service data as Council moves towards a drafting a new contract.
Customers using Council’s three waste facilities
 Facility                    Eumundi Road Cooroy       Pomona
 Transactions 2014-15FY               92,798     4,404                              4,874

Customer Service
The following table details the number of service requests by service type received and
completed during the 2014-15 financial year.

Waste Service Requests by Type         JULY – DECEMBER 2014               JANUARY – JUNE 2015
Charges                                           35                              46
Contractor                                        50                              57
Damaged/Missed bin                              1047                             849
Dog bags                                           7                               7
Dumping – Garden Waste                             9                               9
Dumping >200Litres                                60                              93
Hazard/Contamination                               6                              10
Holding Tanks                                     14                              24
Landfill/Transfer Station                          3                               6
Littering <200Litres                              36                              53
Service – Extra                                  270                             178
Service – Missed                                 491                             445
Service – Modify                                 136                             143
Service – New                                    523                             473
TOTAL                                          2,687                            2,393

Graph showing total number of waste service requests 2014-15FY.
The graph below depicts the number of requests received per month, from July 2014 to June
2015. This represents a total of 5,080 requests. The spike in the graph for October 2014 is
attributed to a media request by Waste Management for the public to report broken wheelie bins
or lids so that free replacements could be arranged by Council.

                           Received 2014/2015FY
 700

 600

 500

 400

 300

 200

 100

   0
       Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15


                                                                                         Page 56 of 73

Section 57

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          15 SEPTEMBER 2015


Amount of material received, landfilled and recycled.
The information below shows the total amount of material received by Council in the 2014-15
financial year, compared to the previous year, the amount disposed of to landfill and the amount
diverted from landfill.

                              Waste received by Noosa Council
                              (Excluding kerbside recyclables)
                                           2013-14FY                    2014-15FY
Total tonnes received at landfill                       58,879                         61,257
Tonnes to Landfill                                      40,706                         43,678
Tonnes Recycled                                         18,174                         17,579
% Diverted                                             30.87%                          28.7%

                                Waste received by Noosa Council
                         (Including kerbside recyclables taken to Bli Bli)
                                             2013-14FY                     2014-15FY
Total tonnes received at landfill                      65,719                          68,097
Tonnes to Landfill                                     40,706                          43,678
Tonnes Recycled                                        25,014                          24,419
% Diverted                                            38.06%                           35.86%

Tonnes of waste received, landfilled and recycled by Noosa Council over the last two
years.

 80000

 70000

 60000

 50000

 40000                                                                        2013-14FY
                                                                              2014-15FY
 30000

 20000

 10000

     0
                 Total                 Landfill            Recycled


The information shows that diversion rates for 2015 are slightly lower than for the previous year.
There is more waste to landfill this year compared with 2014 with less of the waste received
being recyclable. No changes have been made to the recycling of materials received. The
reduction in diversion rates is attributed to uncontrollable factors such as the percentage of
recyclable material received in the waste stream at the landfill. The downturn in the construction
industry may have influenced the lower diversion rate as a high proportion of construction and
demolition waste is recycled.




                                                                                       Page 57 of 73

Section 58

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          15 SEPTEMBER 2015


Kerbside collection of recyclable packaging (Yellow lidded bins)

             Amounts of recyclable packing collected by Noosa
                            Council (Tonnes)
 800
 700
 600
 500
 400
 300
 200
 100
     0
          Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15


The rate of household kerbside recycling has remained relatively constant from previous years
and throughout the period except for the expected increase during the summer/Christmas period.

Annual bulk kerbside collection

At the time of writing the annual bulk kerbside collection has been under way for three weeks. All
residents were provided with a flyer outlining collection areas (including maps), dates,
permitted/prohibited items and instructions for utilising the collection service. This year, to
ensure extra clarity for residents, interactive maps were added to the Council website for people
to check their collection weeks.

Issues last year with illegally dumped mattresses influenced Waste Management to offer
residents a mattress collection service on the Friday before the Saturday collection. Mattresses
are picked up and recycled for a small fee of $20. To date the service has been well utilised with
approximately 30 mattresses being collected each weekend.

Unfortunately some residents have continued to put out prohibited items for collection. These
include mattresses, gas bottles, unbundled waste, tyres and paint. Prohibited items are not
collected and Waste Management officers follow up with residents to make sure the waste is
removed from the footpath and disposed of correctly. Steel, which is segregated during
collection, will be recycled by Council.

Waste collected (tonnes) during Bulk Kerbside Collection:
   Week 1 (8 August)       Total - 71.5t Steel - 7.16t
   Week 2 (15 August)      Total - 84.82t Steel – 27.8t
   Week 3 (22 August)      Total - 93.92t Steel – 20.84t

Overview of waste management contracts
       The three major waste management contracts for waste collection, operation of the landfill
         and operation of the resource recovery centre at Eumundi Road are currently held by
         Cleanaway. These contracts are due to expire 31 August 2016, with an option for Council
         to extend the term for one additional year. Waste Management will be recommending that
         the option to extend to 31 August 2017 be taken up (a separate submission to Council will
         be made on this matter including any contract variations required).



                                                                                    Page 58 of 73

Section 59

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          15 SEPTEMBER 2015


   Work will soon begin on drafting the specifications for the next major waste contracts to run
     from 1 September 2017. The specifications will need to implement Noosa Council’s new
     Waste Management Strategy, which will be in accordance with Council’s workshop review
     and methodology of adoption of the recommendations of the Community Jury.
   The contract for the collection and purchase of ferrous and non-ferrous metals and lead
     acid batteries has recently been awarded to Sims Metal.
   The contract for the collection of household hazardous waste has recently been awarded to
     Transpacific Industries.
   The contract with ARG for the processing of green waste has been extended for a further
     12 months.
   Contract negotiations with Waste Management Environmental Consultants, ‘Future Plus
     Environmental’ have occurred as officers ensure that future sampling and analysis reflect
     Council’s move to a new Receiving Environment Monitoring Program (see below).

Hastings Street Collection Issues
A small working group has continued to explore potential options to relieve congestion along
Hastings Street during collection runs. The group has continued to gather information and look
into current business practices in the area and solutions offered in other regions for similar
issues. Current options being explored include the use of an electric vehicle that would collect
bins quietly overnight and remove them to a single collection point off the main street. One
collection point being considered is in the Woods near the middle groyne. Further options will be
explored in coming months.

Veridian Noosa
Noise and service disruption issues from the operation of an on-site waste compactor have
prompted Veridian Noosa to consult with Council in order to seek a solution. The issues relate to
noise from the compactor (particularly during collection) and its proximity to holiday units.
Solutions discussed to date have included removing the need for a compactor by separating out
organics, improved recycling and building a refrigerated bin room. Veridian are hoping that this
may start some competition amongst the high end accommodation sites attaining “green
credentials” for organic recycling. Alternatively the body corporate could lease a new modern
compactor. Waste Management staff will continue to work closely with the Veridian body
corporate to have the matter resolved in the next few months.

Litter and Dumping
Waste Management have responded to 189 complaints about dumped material and 103
complaints for littering during the 2014/2015 financial year.

A surveillance program utilising six cameras purchased with a State Government grant have
identified a number of illegal dumping hotspots through the shire. Cameras are now regularly
deployed at these hotspots. The cameras have identified activity which has resulted in 4 show
cause notices, 4 compliance notices (clean up) and 3 Penalty Infringement Notices (fines) in the
past 4 months.

Temporary signs have been developed and produced for short term use at hotspots and on piles
of recently deposited rubbish. The intent is to convey the message that it is not only Council
officers but the whole community that is taking an interest. This creates the perception there is an
increased likelihood of being seen and reported if you dump or litter.




                                                                                     Page 59 of 73

Section 60

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                       15 SEPTEMBER 2015




       This site was signed as illegal dumping and anonymously cleaned up immediately.

3.   PEOPLE

Waste Management have employed several new staff members over the last few months as a
result of the Service review. Cherie O’Sullivan has commenced (on 0.4 FTE) as Environmental
Officer, Emma Menzies has commenced (on 0.5 FTE) as Waste Education Officer and Janette
Palmer has commenced as Administration Officer. The three additions will be invaluable in
ensuring that Waste Management can continue to deliver a quality service to Noosa residents
and businesses.

Other staff numbers and positions remain constant.

4.   SYSTEMS & PROCESSES

Environmental
Waste Management have recently drafted a Receiving Environment Monitoring Program (REMP)
for the Eumundi Road landfill and resource recovery site. The REMP conforms to the amended
environmental authority for the site issued by the Department of Environment and Heritage
Protection (EHP) last year. It is an outcome based system that allows for more relevant,
responsive and timely monitoring at the site and ensures that controls and responses are
effective in protecting the surrounding environmental values. It was submitted to EHP on 29 July
for their review and feedback. EHP has referred the REMP to the Department of Science,
Information Technology and Innovation for technical review by the State’s experts.



                                                                                 Page 60 of 73

Section 61

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          15 SEPTEMBER 2015


Noosa Council is the first in the region to move to this form of environmental licensing,
monitoring and management. Other councils are expected to follow suit in the near future. The
monitoring and analysis required in the REMP has already been initiated through Council’s
environmental consultants.

Waste Management have commenced formal monthly environmental audits of the contractor’s
environmental management systems for the Eumundi Road site. The audits also extend to full
site inspections. The first audit identified the need for an amended environmental management
plan to secure compliance with current contract requirements. Waste Management staff are now
working closely with the contractor’s environmental adviser to ensure that an effective plan is
produced and implemented at the site. The internal inspection and documented reporting
process has also secured a number of environmental management improvements for the site.

Contract Management
A review and assessment of the obligations and requirements under Waste Management’s
Resource Recovery Contract was conducted in the last four months and compared to actual
on-site activities. Issues and variations identified have been brought to the contractor’s attention
at several contract meetings. Waste Management will move to finalise several unresolved
matters over the next month.

Recently commenced weekly meetings with the contractor to review and provide direction on
waste disposal contract matters will continue for the foreseeable future as significant
improvements have been noted as a result.

Workplace Health and Safety
A third party audit has been carried out on the Eumundi Road Waste Transfer Station by a
specialist consultant. The report detailed nine issues requiring rectification. Waste Management
and Cleanaway are currently in the process of addressing all issues.

Asset Review
Waste Management are about to commence a systematic review and assessment of all
documented and undiscovered assets across its three waste management facilities. A complete
asset management plan will then be produced by the end of the financial year.

5.   Future Direction
   The Community Jury handed down its report in July on the potential for organic waste
     recycling and this is to be explored in more detail by Council over the next couple of
     months. This matter is covered in far more detail in other Council reports. Waste
     Management will be responsible for ensuring that the Jury and Council’s decisions are put
     into practice through a new Waste Management Strategy. As soon as the Council decision
     is finalised work will begin on drafting the new strategy.
   Work will soon begin on drafting the specifications for the next collections, resource
     recovery and disposals contracts. As discussed above, the current contracts will end in
     August 2017. A two year lead-in period is required to draft the complex specifications, go
     through the tender process, assess the tenders, select the successful tenderer/s and allow
     time to purchase and mobilise plant and equipment. Depending on how the Council
     endorses the Jury’s recommendation to collect and compost food waste, then the contracts
     will also need to account for the selection, design, construction and commissioning of a
     composting facility.
   Waste Management’s newly appointed Waste Education Officer will soon commence work
     on the waste communication strategy. The strategy will aim in the first 12 months, to
     initiate an improvement in kerbside recycling volumes. The following 2-3 years will then
     see the priority to move to the effective implementation of an organic waste service. It is
     anticipated that in order for the organic waste recycling strategy to work, effective and
     comprehensive waste education and promotion will be critical. The current staffing levels

                                                                                     Page 61 of 73

Section 62

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                   15 SEPTEMBER 2015


         or alternatively contracted work dedicated to this role will need to be reviewed should this
         initiative go ahead.
   The Waste Education Officer is also currently working towards preparing an education
     package for schools and encouraging and facilitating more effective recycling at local
     events.
   Waste Management will over the next two months conduct a waste audit on bins collected
     across the Noosa Council. The aim of the audit is to measure if Noosa Council’s waste
     communication strategy will improve recycling rates over a 12 month period. It will also
     seek to measure average amounts and quality of organic waste currently produced by
     Noosa residents in preparation for a potential organic waste service. In particular the audit
     will measure:
     a.    The current level and efficiency of domestic kerbside recycling in the Noosa area.
     b.    The average amount of recyclables incorrectly going to landfill.
     c.    The average amount of organic waste currently collected in residual bins and going to
           landfill.
     d.    The level of contamination of green waste bins.
Previous Council Consideration
Ordinary Meeting 7 May 2015 Item 14, Page 5
Waste Management - 4 Monthly Report to 31 March 2015
That Council note the report by the Waste Coordinator to the Infrastructure and Services
Committee Meeting dated 28 April 2015 providing an update on the activities of the Waste
Management Section to 31 March 2015.
Finance & Risk
Refer to Section 1 – Finance.
The Manager of Waste and Environmental Health has recently completed a draft review and
update of Waste Management Risk Management Program. This Program will be reviewed and
updated quarterly by the Waste Coordinator.
Consultation
External Consultation - Community & Stakeholder
The findings of the Noosa Community Jury (subject to Council approval) will form the basis of
Council’s new Waste Management Strategy, “Towards Zero Waste”.
Internal Consultation
Nil.
Departments/Sections Consulted:

X      Community Services                            Planning & Infrastructure
       Disaster Management & Public Order            Building & Plumbing Services
X      Waste & Environmental Health                  DA Planning
       Community Facilities                          Strategic Land Use Planning
       Libraries & Galleries                         Asset Design & Investigations
       Community Development                         Asset Planning
                                                     Civil Operations
                                                     Environment

       Executive Office                              Corporate Services
       Community Engagement                      X   Finance
       Customer Service                              ICT
       Executive Support                             Procurement & Fleet
       Governance                                    Property & Facilities
       Human Resources                               Revenue Services




                                                                                           Page 62 of 73

Section 63

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                        15 SEPTEMBER 2015


8                         ENVIRONMENTAL HEALTH - ANNUAL REPORT 2014/15 INCLUDING UPDATE TO 31
                          JULY
OCUMENT INFORM AT ION




Author                                  Acting Coordinator Environmental Health, Terry Steer
                                        Community Services

Index                                   ECM/ Subject/ Branch Management – Community Services

Attachments                             Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Acting Co-ordinator Environmental Health to the
Infrastructure & Services Committee Meeting of 15 September 2015 providing an update on the
Environmental Health Section performance for 2014/15 and an update activities to 31 July 2015.


REPORT
The purpose of this report is to advise Council of the Environmental Health Section’s activities for
the period 2014/2015, the first month of the current financial year to 31 July 2015 and planned
activities and initiatives for 2015/16.

Environmental Health Section combines the operations of three distinct teams –
    Cemeteries – Providing high quality burial and cemetery services at Cooroy, Pomona and
      Tewantin cemeteries.
    Environmental Health – Providing protection, promotion and improvement of public health,
      safety and environmental services.
    Pest and Vector – Providing pest animal control, (i.e. feral cats, dogs, deer, foxes and
      pigs), pest plant control, (i.e. groundsel, salvinia) and disease vector control (mosquitoes,
      rats, mice) on public and private land.
1.                        FINANCE
The objective of all services within Environmental Health is to operate within approved budgets.
Cemeteries: 2014/2015 Financial Year Summary
                                                                                                              Cemeteries
                                                                                                                2014-15

                                                                              Benchmark % Complete       100.0%



                                                  2014/15       2014/15       2014/15       2014/15        %
                        Statement of Income and
                                                  Original      Current        YTD            YTD        Current     YTD
                               Expenses
                                                  Budget        Budget        Budget        Actuals      Budget    Variance

   Direct Revenue                                    221,088       221,088       221,088       275,264    124.5%      (54,175)
   Direct Expenditure                                216,091       223,905       223,905       220,535     98.5%         3,370
   Net Operating Result                                4,998        (2,817)       (2,817)       54,728                (57,545)
   Competitive Neutrality                                   0             0            0             0      0.0%             0
   Depreciation                                         7,811         7,217        7,217         7,527    104.3%         (310)
   Internal Charges                                    41,806        41,806       41,806        41,806    100.0%             0
   Operating Surplus / (Deficit)                     (44,620)      (51,840)     (51,840)         5,396                (57,235)



                                                                                                                   Page 63 of 73

Section 64

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                   15 SEPTEMBER 2015



                                                Cemeteries
 300,000

 200,000

 100,000

         0
                         Direct Revenue                 Direct Expenditure               Net Operating Result
(100,000)
                                           2014/15                           2014/15
                                           YTD                               YTD
                                           Budget                            Actuals

Comments:
  Revenue exceeded expectations by $54,175.
  Savings of $3,370 were made on forecast expenditure through internal sourcing of
    materials rather than outsourcing.
  All operational projects were delivered as forecast.
  The 2014/15 operating result exceeded expectations with a $5,396 surplus.

Cemeteries: period ending 31 July 2015
                                                                                              Cemeteries
                                                                        for the period ending 31-Jul-2015

                                                                       Benchmark % Complete           8.3%



                                          2015/16        2015/16       2015/16          2015/16        %
    Statement of Income and
                                          Original       Current        YTD               YTD        Current      YTD
           Expenses
                                          Budget         Budget        Budget           Actuals      Budget     Variance

Direct Revenue                               232,247        232,247          19,354         14,181      6.1%          5,173
Direct Expenditure                           229,700        229,700          18,513          7,307      3.2%        11,205
Net Operating Result                           2,547          2,547             841          6,874                  (6,033)
Competitive Neutrality                              0              0               0             0      0.0%              0
Depreciation                                    7,878          7,878             656           656      8.3%              0
Internal Charges                               53,197         53,197           4,433         6,026     11.3%        (1,593)
Operating Surplus / (Deficit)                (58,528)       (58,528)         (4,248)           191                  (4,440)


                                                 Cemeteries
    25,000

    20,000

    15,000

    10,000

      5,000

             0
                          Direct Revenue                Direct Expenditure             Net Operating Result




                                                                                                                Page 64 of 73

Section 65

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                             15 SEPTEMBER 2015


Comments:

     Revenue is $5,173 less than budget
     Expenditure is $11, 205 less than budget due to contractors’ availability.
     Operational projects to be delivered as forecast.


Environmental Health: 2014/2015 Financial Year Summary
                                                                                    Environmental Health
                                                                                                2014-15

                                                                 Benchmark % Complete          100.0%



                                  2014/15       2014/15          2014/15         2014/15         %
     Statement of Income and
                                  Original      Current           YTD              YTD         Current     YTD
            Expenses
                                  Budget        Budget           Budget          Actuals       Budget    Variance

Direct Revenue                        242,944          262,944      262,944          262,537     99.8%           407
Direct Expenditure                    407,222          425,151      425,151          418,857     98.5%         6,293
Net Operating Result                (164,278)        (162,207)    (162,207)        (156,320)                 (5,886)
Competitive Neutrality                      0                0            0                0      0.0%             0
Depreciation                                0                0            0                0      0.0%             0
Internal Charges                      136,031          136,031      136,031          136,031    100.0%             0
Operating Surplus / (Deficit)       (300,308)        (298,237)    (298,237)        (292,351)                 (5,886)




                                     Environmental Health
         600,000

         400,000

         200,000

                 0
                          Direct Revenue                Direct Expenditure              Net Operating Result
       (200,000)
                                           2014/15                            2014/15
                                           YTD                                YTD
                                           Budget                             Actuals

Comments:

     Revenue was only $407 less than forecast which equates to approximately one licence
       application.
     Expenditure variance of $6,293 results from not backfilling positions during environmental
       health officer absences during leave and a minor underspend in materials and services.
     All operational projects were delivered as required, with the exception of temporary food
       business inspections due to constraints on overtime and week-end work.




                                                                                                         Page 65 of 73

Section 66

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    15 SEPTEMBER 2015


Environmental Health: period ending 31 July 2015

                                                                          Environmental Health
                                                             for the period ending 31-Jul-2015

                                                            Benchmark % Complete       8.3%



                                2015/16       2015/16       2015/16      2015/16        %
     Statement of Income and
                                Original      Current        YTD           YTD        Current     YTD
            Expenses
                                Budget        Budget        Budget       Actuals      Budget    Variance

Direct Revenue                      271,048       271,048      227,243      228,996     84.5%       (1,753)
Direct Expenditure                  387,325       387,325       29,807       50,110     12.9%      (20,303)
Net Operating Result              (116,277)     (116,277)      197,436      178,885                  18,550
Competitive Neutrality                    0             0            0            0      0.0%             0
Depreciation                              0             0            0            0      0.0%             0
Internal Charges                    133,118       133,118       11,093       11,161      8.4%          (67)
Operating Surplus / (Deficit)     (249,395)     (249,395)      186,342      167,725                 18,618




Comments:

     Annual licence renewals are run annually with 84.5% of revenue being shown in July which
       is slightly higher than currently forecast.
     Expenditure of $20,303 more than forecast due to unbudgeted one off payment to
       co-ordinator on his resignation from Council. It is anticipated that this will be absorbed by
       vacancy saving.
     Apart from current deficit, the Environmental Health budget is relatively on track with
       projections for this stage of the financial year.




                                                                                                Page 66 of 73

Section 67

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                             15 SEPTEMBER 2015


Pest and Vector: 2014/2015 Financial Year Summary




                                   Pest Management
      1,000,000

        500,000

              0
                      Direct Revenue             Direct Expenditure         Net Operating Result
      (500,000)

     (1,000,000)
                                       2014/15                    2014/15
                                       YTD                        YTD
                                       Budget                     Actuals

Comments:

    Revenue was $24,371 down due to lower “enter and clear” activity for pest plants. This
      indicates an effective education program and compliance.
    Expenditure savings of $82,606 due to underspend in materials and services, $72k and
      employee benefits, $11k. Saving as “enter and clear” expenditure was lower, less
      chemicals used and equipment savings resulting from these items being purchased
      through grants.
    All operational projects were delivered as required.




                                                                                         Page 67 of 73

Section 68

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                            15 SEPTEMBER 2015


Pest & Vector: period ending 31 July 2015


                                                                                    Pest Management
                                                                    for the period ending 31-Jul-2015

                                                                   Benchmark % Complete        8.3%



                                  2015/16         2015/16          2015/16      2015/16         %
      Statement of Income and
                                  Original        Current           YTD           YTD         Current     YTD
             Expenses
                                  Budget          Budget           Budget       Actuals       Budget    Variance

Direct Revenue                         56,464             56,464        1,280             0      0.0%         1,280
Direct Expenditure                    576,976            576,976       23,859        14,591      2.5%         9,268
Net Operating Result                (520,512)          (520,512)     (22,579)      (14,591)                 (7,987)
Competitive Neutrality                      0                  0            0             0      0.0%             0
Depreciation                                0                  0            0             0      0.0%             0
Internal Charges                      124,963            124,963       10,414        11,849      9.5%       (1,435)
Operating Surplus / (Deficit)       (645,475)          (645,475)     (32,992)      (26,440)                 (6,552)




                                           Pest Management
             30,000
             20,000
             10,000
                 0
                          Direct Revenue                Direct Expenditure          Net Operating Result
         (10,000)
         (20,000)
         (30,000)
                                             2015/16                         2015/16
                                             YTD                             YTD
                                             Budget                          Actuals

Comments:

      Expenditure varies due to seasonal nature of pest and vector control program.
      Anticipated savings will be made in expenditure in wages as a result of workers
        compensation insurance for one injured Pest & Vector Officer who has not been backfilled.
      Overall the budget position appears sound for the period to ending July 2015.

2.      CUSTOMER SERVICE

(i)     Cemeteries Activities - 2014/2015 Financial Year Summary

              Conducted 54 burials, 56 ashes interments, provided 71 plaques, made 39
                reservations and completed 230 customer service requests.
              Maintained the grounds, headstones and other structures at the three cemeteries.
              Constructed new niche wall at Pomona cemetery.
              Constructed new concrete beam for burials at Tewantin cemetery.
              Completed loading 6,000 interment records into T1 system.

                                                                                                        Page 68 of 73

Section 69

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                         15 SEPTEMBER 2015


          All new reservation and burial applications are being recorded in T1 system.
          Customer contact scripting created, reviewed and completed.
          Cemetery mapping layers developed and refined with collaboration from the mapping
            team for each of the three cemeteries using Exponare mapping system. Advanced
            search options developed and created for use in Exponare.
          Completed improvements to the garden ashes burial area at Cooroy cemetery.
          External review by AEC of the cemetery budget fees and charges conducted.
          Utilised contractors to undertake maintenance functions to address identified
            workplace health and safety issues.
          Developed new ashes garden at Pomona cemetery.

(ii)   Environmental Health Activities – 2014/2015 Financial Year Summary

          There are 517 licenced premises including food, environmentally relevant activities,
            accommodation (camping grounds/caravan parks) and personal appearance
            services.
          Completed a total of 671 inspections of licenced premises consisting of the following:
            o     412 annual inspections/enforcement follow ups of food, environmentally
                  relevant activities, accommodation (camping grounds/caravan parks) and
                  personal appearance services.
            o     259 additional inspections covering requests, searches and final inspections.
          Approved the establishment of 59 new licenced premises.
          Approved 48 new operators of existing licenced businesses.
          Unable to inspect 50 temporary licenced food businesses due to a restriction on
            overtime.
          Attended 6 development assessment planning meetings to provide expert
            environmental health advice.
          Assessed 8 development applications and providing requests for information or
            conditions of approval and advisory notes.
          Conducted 5 food handler training sessions (approx. 91 participants trained).
          Continued to update customer service scripting on environmental health issues.
          Investigated and resolved 785 customer service requests as follows:

                       Environmental Health Customer Service
                       Requests by Type and Number
                       Type                                             Number
                       Accommodation Park                                   5
                       Air Pollution                                      107
                       Asbestos                                            24
                       Fire                                                 5
                       Food Hygiene                                        70
                       Food Poisoning                                      17
                       Food Rec                                             2
                       Food Unlicenced                                    239
                       Light nuisance                                       6
                       Needle                                               1
                       Noise Nusiance                                     154
                       ERA enquiries                                       19
                       River                                                1
                       Skin Penetration                                     8
                       Water                                               38
                       Water Quality                                       15




                                                                                   Page 69 of 73

Section 70

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           15 SEPTEMBER 2015



           In 2014/15 Council received the following disease notifications from Qld. Health:
             o     126 cryptosporidiosis (water borne*)
             o     43 salmonella unspecified
             o     32 salmonella, specified
             o     17 pertussis(whooping cough)
             o     13 campylobacter (food borne)
             o     7 measles (infectious)
             o     1 salmonella enteritis (food poisoning)

             *Note: Cryptosporidiosis represents the highest high number of notifications (126) in
             the various categories of notifiable disease. The primary source of infections are
             contaminated drinking water and swimming in contaminated swimming pools. A new
             public health initiative put forward for the current financial year to regulate swimming
             pools in Noosa Shire as a means of controlling this potential source of infection.
             There would appear to be grounds for Council to review the the proposal for licencing
             swimming pools based on this information.

(iii)   Pest and Vector Control Activities - 2014/2015 Financial Year Summary

           Investigated and resolved 118 customer service requests which include declared
             weeds, wild animal control and vectors (including mosquito, midge and vermin).
           Conducted a total of 6 aerial mosquito control treatments each covering 980 hectares
             – treatments not required during winter period.
           Continued routine mosquito light trapping at 6 main breeding locations. The traps
             inspected weekly, finding higher numbers after rain and high tides. Overall 4,971
             mosquitoes trapped and identified mainly as potential disease carriers.
           Rat baiting program continued with a total of 22 stations located within the three
             precincts of Hastings Street, Sunshine Beach and Peregian Beach.
           A total of 15kg or 1070 individual rat baits laid. No additional requests concerning
             increasing the number of stations or increasing numbers have been received.
           Received notifications from Qld. Health showing the usual spiking in mosquito borne
             diseases over summer months due to specific high rainfall events, including:
             (i)    119 Ross River virus;
             (ii) 13 Barmah Forest virus; and
             (iii) 2 Dengue Fever (most likely associated with residents infected in North
                    Queensland).
           Completed the annual pest plant management survey, including 1,823 private
             property inspections and treating 581km of public roads to remove pest plants. A
             total of 29 Notices to destroy Class 2 weeds and information sheets were served on
             property owners.
           Pest Management Plan now completed and implementation of recommended actions
             underway.
           Completed feral deer survey of 100 properties in Tinbeerwah in response to
             substantial property damage.
           Destroyed 30 feral deer in Cooroy area during the year.
           Extended the fox control program including “Dob in a Fox” to respond to increased
             fox activity and customer requests in coastal and urban areas.
           Continued to respond to feral dog attacks on stock, poultry and pets.




                                                                                      Page 70 of 73

Section 71

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                         15 SEPTEMBER 2015


3.     STAFF
         On 10 July 2015 the Environmental Health Coordinator Greg Mulder retired from
           Noosa Council. The position of Coordinator has been advertised and a suitable
           applicant appointed. He is due to commence work in mid October.
         A permanent full time environmental health officer position (to replace David Baker)
           was advertised internally on Thursday 3 September.
         In July, Pest Control Officer Richard Mylan suffered serious injuries in a motor vehicle
           accident on the way to work. Mr Mylan remains on work cover and may not return for
           at least another two months. The remaining two (2) pest Control Officers are
           alternatively undertaking the additional duties to make up for Mr Mylan’s absence in
           the short term. This is not sustainable in the longer term and a replacement officer
           will be needed should Mr Mylan’s absence be extended.
         There are currently delays in processing applications for cemeteries, health licence
           applications and pest baiting programs etc. due to the administrative workload. There
           is one Administration Officer (AO) providing support for the Co-ordinator
           Environmental Health, 2.5 Environmental Health Officers, three Pest & Vector
           Officers and a Cemetery Officer. A review of administrative systems to identify
           efficiencies will be one of the first tasks for the new Coordinator.
         In the past month the reduced staffing levels have placed considerable stress on the
           section. Compounding this have been a number of staff absences in the
           Environmental Health team due to illness, family leave and annual leave which has
           impacted on the unit’s business activities. Staff are working hard to address
           outstanding matters and make up for the shortfall.

4.     SYSTEMS AND PROCESSES

       In 2014/15 the section upgraded the following systems and processes:

(i)    Cemeteries
         Improved the garden ashes burial area at Cooroy cemetery.
         Utilised contractors to undertake some maintenance functions to address identified
           workplace health and safety issues
         Further improved T1 record system with ashes and plaques applications.
         Commenced computerising existing hard copy burial and ashes records.

(ii)   Environmental Health
          Implemented recreational water monitoring program under Public Health Act to
            monitor public safety risks (River and Beach)
          New Local Law in place to control public health issues on request regarding ensuring
            safe public swimming pool water quality, improving backpacker-type accommodation
            standards and ensuring healthy rental accommodation standards
          Environmental health officers have now received accredited training in the safe
            handling of asbestos and supervision of asbestos removal in preparation for
            commencement of the provisions of the Public Health Act Regulations commencing
            September 1
          Developed a food business licence information application kit to assist food
            manufacturers
          Developed a food business licence information kit to streamline temporary event (1-4
            day) applications
          Environmental health officers attended internal training on investigation and
            enforcement techniques.




                                                                                    Page 71 of 73

Section 72

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                          15 SEPTEMBER 2015


(iii)   Pest and Vector
           The multi skilling of the three officers to assist in each other’s functions during
             absences and seasonal influences has been an effective strategy in the short term
             with one officer on extended leave due to injury suffered in a motor vehicle accident.
           Continue to plan and coordinate pest and plant control programs in consultation with
             Parks & Natural Area staff of Council’s Planning and Infrastructure Branch.
           Participated in the development of the draft Pest Management Plan. Now involved in
             the operational implementation of the plan.
           Pest and Vector staff have now implemented the safe use practice of a quad bike
             procedure.
           Purchased a tractor mounted rotary ditch digging device (runnelling machine) for the
             maintenance of the existing mosquito control runnelling system.
           Joined/membership of Mosquito and Arbovirus Research Committee (MARC).
           Now working with the MARC to implement a control program consistent with national
             standards and scientific approaches.
           Purchased feral pig trapping equipment with $10,000 grant from Mary River and SEQ
             catchment groups.
           Purchased feral dog trapping equipment with State Govt. grant.

(iv)    Across all teams
           Developed budgets and new initiative proposals for 2015/16.
           Environmental Health Section Plan has been developed.

5.      FUTURE DIRECTION

(i)     Cemeteries
          Computerise a further 2,000 existing hard copy cemetery burial and ashes site
            records.
          New vehicle has replaced the small truck/light after plant operation review.
          Research potential land acquisition for expansion of Tewantin cemetery.
          Create cemetery website.
          Develop on site signage with maps at each cemetery.
          Scanning all cemetery forms and documents into ECM (ongoing).
          Review recommendations of AEC cemetery fees and charges report and implement
            where approved by Council.

(ii)    Environmental Health
           Undertake a food safety compliance project at regulated premises that have their own
             private water supplies, (i.e. properties not serviced with Unitywater mains supply).
           Undertake a compliance program of outstanding development approvals of “deemed
             approved” service stations by Co-ordinator of environmental health.
           Undertake a stormwater pollution prevention program at Hastings Street resorts.
           Organise meetings with State authorities Qld Health, Safe Food, DEHP and WH&S,
             to improve working relationships.
           Update customer service scripting with new local law/initiative information.
           Prepare reports on recreational water monitoring, food activities and personal
             appearance services to Qld Health.
           Train the Vector Control Officer in sediment and erosion control complaints,
             investigations and issue of penalty infringement notices (on-the-spot fines).
           Co-ordinator to investigate the ability of the Planning Scheme to control the
             establishment of new “deleted environmentally relevant activities” (e.g. service
             stations), to adequately maintain environmental protection.



                                                                                    Page 72 of 73

Section 73

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                     15 SEPTEMBER 2015


(iii)     Pest and Vector
             Ongoing development of systems and processes to ensure that 1080 baiting program
               and pest animal, plant and vector control customer requests and inspection data are
               recorded in T1.
             Trialling mobile technology options for Pest Animal, Pest Plant and vector control
               programs including remote monitoring.
             Investigate the viability of contracting out vermin control of council public barbeques.
             Ongoing expansion of the feral dog, deer and pig control program with QPWS,
               Forestry, SEQ Water and local land holders.
             Ongoing educational training program with targeted community groups in pest
               management techniques such as trapping and baiting (mainly feral cats, dogs, foxes,
               pigs and common (Indian) myna bird). This will lead to identifying problem areas with
               specific responses rather than a blanket-type bait and trapping approach.
             Implement the annual pest management program of public and private properties.
               New program approved by Council now underway.
             Develop a program with Department of Agriculture, Fisheries and Forestry to tag and
               research feral deer movements in Tinbeerwah. Map deer densities across the
               region.
             Secure an Ultra-Low Volume (ULV) spray device to control adult mosquitoes.
             Develop a public awareness program for activation during the peak mosquito
               breeding season.
             Reinstate the previously constructed runnels in salt marsh mosquito breeding areas
               that have not been maintained for the past 6 years.
             Investigate the feasibility of a shared boat to improve mosquito control and water
               weeds assessment and treatment in water ways.
Previous Council Consideration
Nil.
Finance & Risk
Refer to Section 1 – Finance.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Internal consultation included Management Accountant & Environmental Health staff.


X       Community Services                             Planning & Infrastructure
        Disaster Management & Public Order             Building & Plumbing Services
X       Waste & Environmental Health                   DA Planning
        Community Facilities                           Strategic Land Use Planning
        Libraries & Galleries                          Asset Design & Investigations
        Community Development                          Asset Planning
                                                       Civil Operations
                                                       Environment

        Executive Office                           X   Corporate Services
        Community Engagement                       X   Finance
        Customer Service                               ICT
        Executive Support                              Procurement & Fleet
        Governance                                     Property & Facilities
        Human Resources                                Revenue Services




                                                                                             Page 73 of 73

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.