Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (33.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                 SCC CORRESPONDENCE


                                   Place barcode here
                                                                  1111111111111111111111111   b’5   .




                                                                           80668151

    THIS IS THE NEXT PART OF A

 MULTIPLE PART RECORD

                     Part               b Of [0
Application number:                                      YVl L--Gt             l3!OOcr 2
                                                                                      .




      C:\Documents and Settings\eje\Desktop\Multi Part Record Cover Sheet NEXT PART (3).doc




                                                                                lBOX~S.\9~. ...d.Q.....IL~
                                                                                              H:
Full text of the other 62 pages

Page 2

C

    Atachment


[OCR of page images]
Attachment
C

Page 3

                                                                 MULTI
                                                                 PSPAN REA D
ENRGY&V1OMeT TRANSPOT tlE
       CfNTRE
       fOR
                                                                            FOR
                                                                 AUSTRLIA
                                                                 GROUP



                            .



                                                 r

                                    ./. ".\ ,,"\. -~
                              ~



                               V


                                                           .’<
                             f



                                   "’\
                                          ~."( ./’,:        _/




                                  "
                            *~.:r.~.,.,
                                                       ~

                                                       :
                                                           ""f
                                                ,,’""L’
                                                    ..

Page 4

DOCUMENT CONTROL RECORD


[DOCUMENT

report      Title:
                            II Peregian Beach MaTketplace



IClient:
                            I [Multi   Span Australia Group


 Project Number:
                              112-060
I REV II PURPOSE II DATE                            IIAUTHOR II REVIEWER IIAPPROVED l[SIGNED----’

01           FINAL
                                II 14-MaY-1311              CMB
                                                                         II      AAP
                                                                                       ]1   AAP
                                                                                                  I~

COPYRIGHT


 This work is copyright. Apart from any use permitted under the Copyright Act 1968, no part may be

 produced without prior permission. Requests and inquiries concerning reproduction and rights
 should be directed to:



 The Director

 Pekol Traffic and Transport

 GD02,67 St Pauls Terrace

 Spring Hill QLD 4000




DISCLAIMER


 While every effort has been made to ensure the accuracy of the analyses, the uncertain nature of

 certain input data and parameters used in the preparation of this reports means that PTT are unable

 to make any warranties in relation to the information contained herein. PIT disclaims            liability for
 any loss or damage that may arise as a consequence of any person relying on the information

 contained in this document.




Pc/ZOllo12/1z.t}6()PEREGIANBEA ClISC/REPORTS/IZ.06QPEREGIAN 17A REVISIONADGer:

Page 5

PII
I’IKOL tRAfFIC & TRANsPORT




TABLE OF CONTENTS

1.0      INTRODUCTION                                                         1

          1.1      Background                                                  1

          1.2      Aim                                                         1

          1.3      Scope of Report                                             2

2.0      EXISTING CONDITIONS                                                  1

         2.1       Subject Site                                                1

         2.2       Local Road Network                                          1

         2.3       Site Access                                                 3

         2.4       Parking                                                     3

         2.5       Road Network Operations                                     3

         2.6       Intersection Operations                                     4

         2.7       Active and Public Transport                                 6

3.0      PROPOSED DEVELOPMENT                                                 7

         3.1       Site Layout                                                 7

         3.2       Access Arrangements                                         7

         3.3       Parking                                                     8

         3.4       Servicing                                                  11

         3.5       Queuing                                                    12

         3.6       Active and Public Transport                                13

4.0      TRAFFIC OPERATIONS                                                   14

         4.1       Assessment Scenarios                                       14

         4.2       Background Traffic Growth                                  14

         4.3       Traffic Generation                                         14

         4.4       Directional Distribution                                   15

         4.5       Intersection Performance                                   16

5.0       CONCLUSIONS & RECOMMENDATIONS                                       19

          5.1      Conclusions                                                19

          5.2      Recommendations                                            19




APPENDIX A:                     TRAFFIC COUNT SURVEYS

APPENDIX B:                      INTERSECTION ANALYSIS

APPENDIX C:                     SITE LAYOUT

APPENDIX D:                      RETAIL PARKING DEMAND DATA

APPENDIX E:                     TURNING COUNTS




P,12011-12112-06 PEREGIANBEACH SCtREPORTSI12.060PEREGIAN TIA RE17SIONA.DOCX   jj

Page 6

1.0     INTRODUCTION



1.1     Background

        In February 2013, Pekol Traffic and Transport (PTT)was commissioned by Multi Span Australia Group

        to undertake a traffic impact assessment for a proposed retail development on the site of the now vacant

        bowls club at Peregian Beach. The proposed development is to comprise a supermarket with supporting

        retail stores. The subject site is located on the eastern side of Rufous Street, south of Woodland Drive and

        to the west of the David Low Way, as shown in Figure 1.J.




        Figure 1.1:           SITE LOCALITY



                o

                                                                                                                    I
                                                                                                                I
                                                                                                                I
                                                                                                            I
                                                                                                            r

                                                                                                        r
                                                                                                    r




                Intersections Assessed
                                                    o

         ....
                Bus Stops


                  -   -

                               .....,.,...? 7RP..
                                                    o


                                                                                .~   .
                                                                                         Ai   iii- .
                                                                                              .
                                                                                                    F
                                                                                                                    r   ’"
                                                                                                                             \

                                                                                                                             ~.,




                                                                                                                        ; ili ff
                                                                                                                                   .’




                                                                                                                                   -"i’
                                                                                                                                          ....,r,


                                                                                                                                             _’j_T
                                                                                                                                                     JJ
1.2     Aim


        The aim of this assessment was to evaluate the proposed development in terms of its likely peak hour

        traffic generation, impact on the surrounding road network, site access operations, commercial vehicle

         servicing arrangements, service vehicle manoeuvring and car parking layout and design.




P’120//-J21/2-{)6()PEREGIAN BEACHSctREPORTSII2-060PEREGIAN TIA REVIS/ONA.DOCX                                                                        1

Page 7

PII
.(KO\TRAFfIC & TRANSPORt




1.3      Scope of Report

        This report begins by summarising the characteristics of the existing road network (Chapter 2), followed

        by a description of the scope and scale of the proposed development, including a consideration of its likely
         traffic operating characteristics (Chapter 3). The latter are then overlayed on top of future year peak hour

        traffic operations on the adjacent road network to identify potential future traffic impacts (Chapter 4).

        The report concludes with a summary of key findings (Chapter 5).




P,120)).)2112.060PEREGIANBEA CH SCIREPORTSIl2.060PEREGIAN TJA REVISIONA.DOC’;                                     2

Page 8

2.0     EXISTING CONDITIONS



2.1     Subject Site

        The subject site, defined as Lot 94 on SP137431, currently comprises tlle now vacant Peregian Beach

        Bowls Club.


        The site is bordered to the north by a telephone exchange facility and community building, to the east by

        commercial offices and a Council car park, to the souili by ilie Peregian Tennis Club and to the west by

        Rufous Street.




2.2     Local Road Network


        David Low Way is a controlled distributor road providing a coastal link between Maroochydore and

        Noosa. In ilie vicinity of the site, it has a total carriageway width of approximately 14m,which comprises

        a   single lane of traffic and a cycle lane in each direction and a wide median. The speed limit on iliis road
        adjacent to the site is 60km/h. David Low Way is also a bus route with a northbound bus stop located
        immediately to the east of ilie site, adjacent to the community building.

        David Low Way meets Woodland Drive at a three-arm priority controlled intersection. There is a right

        turn lane   (approximately 35m in length) and a U-turn bay (some sOm long) on ilie northern and southern
        approaches respectively. Woodland Drive is a local road running east        -
                                                                                        west and   serving ilie adjacent
        residential estate.


        Rufous Street runs south from a pliority controlled intersection with Woodland Drive. It is a short access

        road serving sports fields (DiHirst Oval), ilie Peregian Tennis Club,the Peregian Beach Kindergarten and

        some    community gardens, in addition to the development site. A typical view of Rufous Street is shown in

        Figure 2.1




P,12011.12112.060PEREGIANBEA CHSCIREPORTSIl2.060PEREGIAN TiA REVISiONA.DOC’{                                         J

Page 9

PI I
PEkOL TRAFfiC & TRANSPOrT




         Figure 2.1:          RUFOUS STREET (LOOKING SOUTH TOWARDS THE SITE)




         Key attributes of the surrounding road network are summarised in Table 2.1.




         Table 2.1:           ROAD NETWORK ATTRIBUTES


         FtIrIl.....                   II            DIIYi.. L_ W.y       II          W......... Drive                  II          Rut_Street
                                                                                                                         ifl_
             Road Hierarchy                     Controlled Distributor                    Local Road                    ;1..         Local Road
                                                                                 -’
                                                                                                              ....

                                                                                                                        "I’
             Directionalily                             Two-Way                           Two-Way                       ~~.
                                                                                                                                     Two-Way
                                       .-
                                                 ~                                                                              -




             Number of Lanes           I):                 2             ""!                  2                                          2
                                     :’:-,~                                                                                                     "’’::’   ;..


                                      ’Ill                                 II                                           -y
             Speed Limil (km/h)                            60                               40/50                                        40
                                                                          i~.    -~".                   .~-       -




             Jurisdiction                               Council                            Council                      ’il~’_-       Council
                                                                                                                                                                     .’

             Predominant Land-Use               Residenlial/Commercial                    Residential                   :1           Residential
                                                                                                                                                          ..:!
                                                                                                                        -H                                       ..if:
             Pavement Type                              Bitumen                            Bitumen                                    Bitumen
                                                                           "




                                                                                                                            ,
             Kerb-and-Channel          ’l’                Yes                                Yes                         <I             No
                                                                                                        ...   _.        .
                                          ...                            "                                               t:’                                          I
             Dedicated Parking          il                No               "                 Yes                                        No
                                                                                                                         t!                                      ~
                                                                                                                                                                      I
                                                                                                                                                                 -




             Footpaths                  II                Yes                                Yes                         to             No
                                          "
                                                                                                                         !


             Bicycle Lanes          ~..
                                        it      ~~-
                                                          Yes
                                                                         .....
                                                                                      =
                                                                                             No
                                                                                                              =   ":"
                                                                                                                            I
                                                                                                                                        No                       .1
             Bus Route        _:_~Jl                      Yes                                No
                                                                                                     ___-L---___
                                                                                                                                        No
                                                                                                                                                     1
                                                                                                                                                  ___j




P:120IJ.J2112-060PEREGIANBEACHSClREPORTSI12-060PEREGIANTIAREVISIONA,DOCX                                                                                    2

Page 10

2.3     Site Access


        The development site cunently has frontage access from Rufous Street. The adjacent Council car park is

        accessed from a left-infleft-out priority controlled intersection with David Low Way.




2.4     Parking

        The existing bowling club has no on-site parking facilities although there is informal on-street parking on

        Rufous Street along the site frontage.


        The Council        car   park adjacent to the site is currently provides a total of 35 vehicle parking spaces
        (including one disabled space) and seven motorcycle spaces.

        Anecdotal evidence suggests that the car park is typically no more than half full during weekday mornings

        and afternoons with a higher utilisation during the evenings, when an event takes place at the Community

        House, and on weekends, especially when the Peregian markets take place on the fIrst and third Sunday of

        each month.




2.5     Road Network Operations


        To assist in the quantification of existing road network operations proximate to the site, traffIc counts

        were   undertaken        on   Thursday 21st February between the hours of 4pm            -


                                                                                                     6pm and Saturday 23rd

        February between the hours of llam -lpm at the David Low Way f Woodland Drive intersection. The
        evening peak period was found to occur between 4:30pm                 -

                                                                                  5:30pm whilst the Saturday peak period was
        12:00pm     -
                        1 :OOpm.The survey data is attached in Appendix A, while the key operational attributes of the


        subject intersection is summarised in Table 2.2.




        Table 2.2:               INTERSECTION ATTRIBUTES




P:12011.12112.060PEREGIANBEA CHSCIREPORTSI12.060PEREGIAN TIA REVISIONA.DOCX                                              3

Page 11

PI.I
~(kOL TRAFfiC & TRANSPOrT




         In addition, the Vvoodland Drive I Rufous Street intersection was considered for analysis with traffic flows

         estimated based on the through movement data obtained from the intersection counts at David Low Way

         I Woodland Drive intersection. To be robust, it has been assumed that the activities in Rufous Street

         (sports fields, tennis courts, kindergarten and community gardens) would generate 70 vehicle trip-ends
         (vte)in the peak hours.




2.6      Intersection Operations


         A series of SIDRA analyses were conducted to quantify the existing (2013)traffic operations at the David

         Low Way I Woodland Drive intersection and the Woodland Drive I Rufous Street intersection. The

         existing intersection layouts and the equivalent SIDRA representations are shown in Figures 2.2 and 2.3

         respectively.




         Figure 2.2:           DAVID LOW WAY I WOODLAND DRIVE INTERSECTION


                                                                                           OIwtdLowW..,.1bU1




                                                                                                   l’          :
                                                                                                               :

                                                                                                ’l             :’



                                                                                                               :
                                                                                                               :
                                                                                                                :

                                                                                           o..d .....w.,.SoI




P:120JJ-J2111-06fJ PEREGJAN BEA CHSClREPORTSI12.060PEREGIAN 17A REVISION A.DOCX                                     4

Page 12

                                                                                                                                               -

                                                                                                                                                   ,’:;-"..




        Figure 2.3:                       WOODLAND DRIVE I RUFOUS STREET INTERSECTION



         t:
         _,~4..,
                    ...L:.~""
               ",:;-’.. >2F’(
                                                                                          ..c         ~




         .
              -.--_,.
                        ’.~ (..           .




                                           ...~.~8-,                          .
                                                                                              ....                                     ~
                                                                                                              I
                              ,
                                                                                                  .
                                                             .

                                                                                                      .,.


                                                                                         ~                                             ~
                                                                       __;-                                   r
                                                                                        ~
                  -
                        -
                              -
                                      -
                                           -
                                                     -
                                                             -    -    -
                                                                       .
                                                                              ~                               I                        1
                                      :1,:
                                      .




         ~"--.~.
         ......
          I
                 ~ ’\~/’: "e.": "
                   ’.



                         ~
                         (
                               ’
                                              .,’,       .




                                                                  v’:’"
                                                                                        .~
                                                                                  ’.1<’;’:;

                                                                                ’;.’:,,"’.::_
                                                                                                                         T




          .              t    1-0..
                              ~,’1,
                                      ,         ..
                                                             .
                                                                           ,.,...,-;’    \~ ,
                                          ;                            ,J-"                   ,
                        ...
                              ,’I"                               ,..
                                          !                            of;’
                                                             )’. ~~                                   ’.




         I~
                                                                                                          .




                                                             ~~} ~                                                Rufou. $1r.. SOuth
                                                                                                                             .




              ,



                              it                                       ;,....~


        These analyses were based on the traffic count datapresented in Appendix A with:


        _         gap acceptance parameters as per Table 13.7 of Main Roads’ Road Planning and Design Manual

        _         proportion of heavy vehicles (%HV)inherent in the traffic survey
                  Peak Flow Factors (PFF)inherent in the traffic survey

                  SIDRA default values for other parameters


        The results of these SIDRA analyses are presented in Appendix B and are summarised in Table 2.3,




        Table 2.3:                            EXISTING INTERSECTION OPERATIONS



         ~        HOUR"SCENARIO




        Table 2.4 is an extract from the SIDRA manual, which defmes the operational rating of an intersection in

        relation to the degree of saturation for signalised and priority controlled intersections. The degree of

        saturation for a movement is defined as the ratio of traffic demand to the capacity of the movement. The

        values given in Table 2.4 relate to the approach or movement with the highest degree of saturation.




P,120JJ.J21J2.060PEREGIANBEACHSCIREPORTSIJ2.060PEREGiAN TiA REVISIONA.DOCX                                                                 5

Page 13

PII
PIKOL TRAFfIC,. TRANSPORT




         Table 2.4:           SIDRA INTERSECTION RATINGS

                                                                     lgRIE:QE Ilt(RATIRtc’Xi
         IRATING II             LOS
                                                    IIGNA&:i                 ICiiUltiiiloUTiJI
                                                                                                           .
                                                                                                                 PRIQRITY
                                                                              1
         Excellent            LOSA                   x <= 0.6                "              x <= 0.6                 x <= 0.6
                                                                             ..
                                                                                                           !~
                                                                                                           ,!
         Very Good             LOS B              0.6<x<=0.7                 II
                                                                             "
                                                                                         0.5<x<=0.7        I.
                                                                                                                 0.6 < x <= 0.7
                                                                                                           if
          Good                Lose                0.7 < x <= 0.9             II         0.7 < x <= 0.85     i    0.7 < x <= 0.8
                                                                                                            ,
                                                                             ;i
         Acceptable           LOSD               0.9 < x <= 0.95             ’I
                                                                                        0.85 < x <= 0.95         0.8 < x <= 0.9
                                                                             1
          Poor                 LOSE              0.95 < x <= l.0                        0.95 < x <= 1.0          0.9 < x <= l.0
                                                                                                            ,
                                                                             "                             :1.                    ~.
         Very Poor             LOSF
                                           _L___..
                                                       l.0 < x                W
                                                                    __..__......l.___   _
                                                                                            l.0 < x
                                                                                                       _._-_"’--_.
                                                                                                                     l.0 < X




         In addition, the Department of Transport and Main Roads (DTMR)Guidelines for Assessment of Road


         Impacts of Development (GARID) defines the limit of acceptable operations for priority controlled
         intersections to be 80% of theoretical capacity.


         The results indicate that all of the intersections within the study area currently experience "excellent" (ie

         LOS A) operations under existing conditions during the weekday evening and Saturday peak hours.




2.7      Active and Public Transport


         2.7.1    Pedestrians and Cyclists


         In the vicinity of the site, there are footpaths that run along both sides of David Low Way. Breaks in the

         median to the south of the site and to the north of the junction with Woodland Drive facilitate pedestrian

         movements across David Low Way. There is also a                    footpath along the southern side of Woodland Drive
         as far west as the intersection with       Rufous Street. There is a northbound cycleway running along David

         Low Way, past the site.




         2.7.2    Public Transport


         Scheduled bus services operate on David Low Way, with bus stops located in close proximity to the site, as

         shown in Figure l.l. The Sunbus route 620 serves these bus stops, running with a half hourly frequency

         during weekdays and Saturdays from Tewantin to Maroochydore via Noosa Heads, Slillshine Beach,
         Marcus Beach, Peregian Beach, Coolum Beach and Marcoola.


         Thus, the site is well served by local pedestrian, bicycle and public transport facilities, which will help to

         minimise its dependence on private car travel.




P:120)).)2112-060PEREGIANBEACHSCIREPORTSI12-060PEREGIAN TIA REVISION A.DOCX                                                            6

Page 14

                                                                                                                             ,.




3.0     PROPOSED DEVELOPMENT



3.1     Site Layout


        It is understood that Multi Span Pty Ltd intends to redevelop the site to provide a shopping centre

        comprising a supermarket and associated specialty shops. The proposed development includes a total
        GFA of 1,850m2 and the e>..’pected activities currently comprise:


                 Supermarket:               1,100m2
                 Bottle store:             76m2

        -        Bottle store:             70m2

                 Noodle bar:               70m2

                 Cafe:                     62m2

        -        Newsagent:                 105m2

        -        Chemist:                   108m2

        -        Baker:                     108m2

                 Australian Post:           151m2


        The layout of tl1e proposed development is shown in Figure 3.1 and attached in Appendix C.




3.2     Access Arrangements


        As shown on ilie layout plan, it is proposed to provide a single point of vehicular access to the site from

        Rufous Street. This access would incorporate a 9m wide                crossover   to   accommodate service vehicle

        movements.


        To accommodate the shopping centre traffic, it is recommended that Rufous Street is upgraded and

        widened to provide a 6.5m carriageway from the intersection with Woodland Drive to the site access

        intersection.


        In terms of the accessibility of tl1e proposed development, it would be desirable if additional vehicular

        access   could be     provided from David Low Way, utilising the existing left-in/left-out access for tl1e
        adjacent Council car park. The site layout has been designed to accommodate such an arrangement
        should an access easement through the Council car park be permitted at a future stage.




P:12011-1ZIl2-060 PEREGIANBEACHSCIREPORTSI12-060PEREGIAN TIA REVISIONA.DOCX                                            7

Page 15

PII
PIKOL TRAffiC & TRANSPORT




         Figure 3.1:           SITE LAYOUT




3.3      Parking

         3.3.1    Requirement

         The most relevant parking standard from the Noosa Plan for a shopping centre development is a Type 2

         retail business (shop and salon), which has minimum parking requirements as follows:


                 one space per    20m2, or part thereof, of use area for areas up to 100m2 (excluding outdoor dining

                 area)

                 one   space per 15m2, or part thereof, of use area for areas in excess of 100m2 (excluding outdoor

                 dining area)
                 one space per   10m2,or part thereof of any outdoor dining area




P.1201J-J2IJ2-060 PEREGIAN BEACHSCIREPORTSIl2-060PEREGIAN TIA REVISION A.DOCX                                    8

Page 16

        In addition to the Noosa Plan, we have referenced other relevant guidelines to determine the likely peak

        parking demand for this type of development as follows:

                 the Maroochy Plan, the Caloundra City Plan and the Sunshine Coast Draft Planning Scheme

                 (2012),which have a specific rate for shopping complex use, all require a car parking provision at
                 the rate of one space per 20m2 for the first 2000m2 GFA

                we   understand that the previous Noosa Shire Council typically accepted parking provision for

                 retail developments at a rate of 5.2 spaces per 100m2 GFA

        _        TTM and PTT data            on   parking demand from 13 retail developments (of varying sizes) in
                 Queensland which indicate that the peak parking demand for a 1,850m2 GFA development would
                 be in the order of 5.11 spaces per 100m2 (data included at Appendix D)


        Table 3.1 sets out the parking standards described above and the associated number of spaces to be

        provided under each.



        Table 3.1:            PARKING REQUIREMENTS




        The Noosa vehicle parking requirement is for standalone retail facilities and does not account for the

        efficiencies gained from the consolidation of shared car parking spaces in a shopping centre environment.

        Table 3.1 illustrates that the Noosa Plan rate sits well apart from the others, all of which fall into the 93   -




        96 space range.




        3.3.2 Provision


        On the basis of the above, it is proposed to provide a total of 105 on-site parking spaces for the retail

        development, comprising 100 vehicle spaces and five motorcycle spaces. This represents a provision of
        one space per     17.6m2 GFA (or 5.7 spaces per 100m2 GFA). "\tV-hile this is lower than the Noosa Plan car

        parking requirement, it is considerably higher than the Maroochy Plan and the Sunshine Coast Draft
        Pl nning Scheme.




P:12011.12112.060PEREGIANBEACH SCIREPORTSIJ2.060PEREGJAN TIA REVIS/ONA.DOCX                                         9

Page 17

PI-I’
~.kOl TRAffle & TRANSPORT




         3.3.3    Design

         The    layout and provision         of on-site     car   parking is generally consistent with   the   requirements of
         Australian Standard AS2890.1 :2004 Parking Facilities Part 1: Off-Street Car Parking in terms of bay

         dimensions, aisle widths, vehicle circulation and manoeuvring. This is typified by:

                  2.7m x 5.4m vehicle parking spaces

                  6.2m wide parking aisles

         -        6.5m wide circulation aisles




         3.3.4    People With Disabilities

         A total of two People with Disability (PWD)spaces are proposed, which accords with the standards set

         out in AS2890.6, representing one space for every 50 car parking spaces. The PWD car parking bays are


         appropriately sized and located in close proximity to the shopping centre access in accordance with
         AS2890.6, as indicated on Figure 3.1. This is considered to adequately cater for the anticipated parking

         demands of the proposed development and is in accordance with Council’s reqt rements.




         3.3.5    Motorcyde Parking

         The Noosa Plan requires the provision of motorcycle parking at a rate of one space per 10 car parking

         spaces. The application of this rate would require a total of 10 motorcycle spaces for the development.


         However, vehicle registration data obtained from DTMR for the area surrounding the site (defined as

         postcode 4573), including all of Coolum Beach, Marcus Beach, Mount Coolum, Peregian Beach, Point
         Arb\’right and Yaroomba can be used to provide an independent check on this rate. After removing all
         vehicle types which would not travel to a shopping centre (such as heavy goods vehicles and off-road

         vehicles), the data indicates that motorcycles comprise approximately 5% of all registered vehicles in the

         vicinity of the site. On this basis it is proposed to provide five motorcycle spaces (which represents 5% of
         all on-site parking spaces) for the proposed development.


         This provision is considered reasonable for this type of use given that motorcycles are unlikely to be a

         popular mode of transport for supermarket based trips.



         3.3.6    Council Car Park


         The adjacent Council car park would continue to operate as it does currently, with no changes to the

         layout or operation proposed as part of this development application.




P:120ll.}2112.060 PEREGIAN BEACHSCIREPORTSIl2.060PEREGIAN TIA REVISION A.DOCX                                             10

Page 18

                                                                                                                           --~~-~--




3.4     Servicing

       The Noosa Plan does not specify a design vehicle for this type and size of development. However, both the

       Maroochy Plan and the Sunshine Coast Draft Planning Scheme (2012)recommend that an on-site service
       bay for a Medium Rigid Vehicle (MRV)is required for a development of this size (I,500m2               -
                                                                                                                 l,999m2

        GFA).

       A vehicle service area suitable for accommodating MRV has been                 provided at the rear of the retail
       tenancies. Access to the service area is proposed to be to and from Rufous Street. The access, parking and

        servicing arrangements have been designed such that an MRV can enter and exit the site in a forward

        gear, manoeuvre on-site, before existing in a forward gear. The swept path of a MRV is shown in Figure

        3.2.




        Figure 3.2:         MEDIUM RIGID VEHICLE SWEPT PATH




           ~                                                       SPECIALTV SHOPS




                                                                           o.
                                                                                .’~




                                                                 SERvICE VEHIGLE
                                                                   ACCESS ONLY


                             "" 2m’SCREEN TO
                                 SERVICE AREA



                             ~

                                      EXISTING ROAD VERGE    ~
                                                                      .,




        An additional V AN service bay has also been located in close proximity to the retail units at the front of

        the site, as shown in Figure 3.1 and Appendix C. Should an access to the site from David Low Way be

        permitted in the future, this service bay would be relocated with provision available for this adjacent to
        the motorcycle parking.




P:12011.JlIl2.060PEREGIANBEACHSClREPORTSIJ2.060PEREGIANTIAREVlSlONA.DOCX                                            11

Page 19

PI I
PIKOlTR.APfIC & TRANSPORT




         Therefore, it is considered that adequate provision                       is made for the   standing, parking, loading and
         unloading, access and manoeuvring of service vehicles within the development site.




3.5      Queuing

         A typical verge is 4.25m wide compared to Rufous Street which has a considerably wider verge adjacent to

         the proposed site access. As shown in Figure 3.3, measuring from the back edge of a typical verge to the

         first internal intersection within the site results in a queuing distance of approximately 18m, which is

         sufficient to accommodate a queue length of three vehicles. The Maroochy Plan sets out a design queue

         length of three vehicles for a car park capacity of up to 100 spaces and four vehicles for a car park capacity
         of 101   -
                      150 spaces. However, given the nature and expected traffic volumes on Rufous Street, a queuing

         provision for three vehicles is considered sufficient in this instance.




         Figure 3.3:            SITE ACCESS QUEUING DISTANCE




             ~

            SERVICE AREA




                                       SITE BOUNDARY




                                      TYPICAL VERGE
                                             .

                                                       W 10TH




                                                                                            I’pe,~) -------__




P:12011-11112-060 PER.t:GIAN BEACH SCIREPORTSI12-060PEREGIAN TIA REVISION A.DOCX                                                12

Page 20

3.6     Active and Public Transport


         3.6.1    Pedestrian and Cydists


         The     proposed shopping centre development is expected to adequately cater for pedestrians with
        formalised footpaths linking the site with the existing facilities on David Low Way.


         The bicycle parking requirement for the site has been determined using the rates stated in the Noosa Plan,

         at one   bicycle parking space per 100m2 GFA for a Type 2 retail development. Therefore, space for 19
         bicycles has been provided in accordance with the bicycle parking requirements. The bicycle spaces are
        located in close proximity to the shopping centre entry points.




         3.6.2 Public Transport


         The proposed development is not expected to adversely impact upon existing and future public transport

         operations within the immediate area. In fact, it is anticipated that the proposed development will
         increase the viability of public transport services.




P:12011.1:!112.060 PEREGIANBEACH SCIREPORTSI1:!.06O PEREGIAN TIA REVISION A.DOCX                               13

Page 21

PI’I
~.I(OL UAFAC & TRANSPORT




4.0     TRAFFIC OPERATIONS



4.1     Assessment Scenarios


        It is standard practice when analysing future year traffic operations to adopt a ten year design horizon

        from the year of full occupation. Therefore, the following development staging has been adopted:


                 Traffic Counts:                                  2013

                 Development Application:                         2013

                 Construction and Full Occupation:                2015

                 Occupation plus 10 years:                        2025




4.2     Background Traffic Growth

        The scenarios modelled reflect the development staging with detailed analysis undertaken on the existing

        conditions, opening year (2015)and the future year (2025). A background traffic growth rate of 1.8% per

        annum     has been adopted, as sourced from the Department of Local Government and Planning (DLGP)

        Population Forecasts. Given the site’s proximity of the site to border with Maroochy, we have taken an
        average of the growth rates of resident population in Noosa (0.9%)and Maroochy (2.6%).The application

        of this rate equates to an approximate 22% increase in local traffic volumes over the next 12 years (2013-

        2025).




4.3     Traffic Generation


        The peak hour traffic generation for the proposed development has been estimated by applying published

        traffic generation rates from the RTA Traffic Generating Developments as follows:


        _        Thursday Evening Peak: V(P) 20A(S) + 51A(F) + 155A(SM)+ 46A(SS) + 22A(OM)
                                                        =




                 Saturday Peak:       V(P)   =
                                                 38A(S) + 13A(F)+ 147A(SM) + 107A(SS)

        The abbreviations are as follows:


                 V(P): vehicle trips per 1,000m2 GFA

                 A(S): total Slow Trade GFA (m2)

                 A(F): total Fast Trade GFA (m2)

                 A(SM): total Supermarket GFA (m2)

                 A(SS): total Specialty Shops GFA (m2)

                 A(OM): total Office / Medical GFA (m2)

        It is estimated that the proposal will generate in the order of 205 vte during a typical Thursday evening


        peak hour and 242vte during a Saturday peak hour. It is assumed that both the Thursday evening and
         Saturday morning peak hour in:out split is typically 50:50. The entry/exit movements expected to result



P,120ii.i21J2-060PEREGIANBEACH SCIREPORTSli2-060PEREGIAN TiA REVISIONA.DOCX                                   14

Page 22

       from the proposed shopping centre development during typical Thursday evening and Saturday morning

       peak hours are presented in Table 4.1 and 4.2 respectively.



       Table 4.1:                THURSDAY EVENING PEAK HOUR TRAFFIC GENERATION


       I..op     ea...ory                     II Factor]1                        OFA
                                                                                                   1811n,0ul                          SpIlt       II    InlOullpllt cY..)




                                                                                                                                             .~
       ;~,~p I’ihkt~~,\. ..;> <~>
                                              "
                                                   "’;;;fJ~5’ ~t’rn:’J""" ’1~ o~ ’.
                                                   .                                                   .
                                                                                                           l71 ;D..V~;>iL,~Q;50          "        ,q\;1~.t~~t;t~1~~i~ :. ~~~~;$,:jf
                                             -




       ;~~~~~t(::"                               ~." ~;’~~ ~~;~~;ii~>~:;S{~.’;Jo:f’~I::,~?:;,":~~                 "
                                                                                                                         ~< {~~!::~’:<v~~::"";’:’!~’:’:~1~t:~t,:~ ~~i};’:
                                                                                                                                              .J~’
        ,’~p~4" ;~~~~~~::~~>~;1~,~~:   j.~   ~ 1..:    ~~~~:~.l;jf~) ;1.ij~t~,:t ."J:18~9’\’~\~; :~.:~’t i;:;2~~~:f-<~    ’1,;
                                                                                                                                 iO:5.Q_~>           ,~~~’~t’t~t:rOll,Q~.;~::}_?::if~~~


       Table 4.2:                  SATURDAY MORNING PEAK HOUR TRAFFIC GENERATION




        Typically, 15% of the trips generated by retail developments already occur on the adjacent local road
        network. These trips are commonly referred to as ’drop-in’ trips. Therefore, of the 205vte generated

        during a Thursday evening peak hour by the proposed development, only about 175 (ie 85%)of these will
        be new trips on the adjacent road network (ie David Low Way). In the same way, of the 242vte generated

        during a Saturday peak hour, only approximately 206 of these will be new trips on the adjacent road
        network. However, the full generation was applied for intersection analysis and hence the results are

        considered robust.




4.4     Directional Distribution


        The clistribution of the proposed development related traffic on the existing road network has been

        estimated based on the directional split inherent in the traffic surveys. The expected development traffic

        distribution is shown in Figure 4.1.




P:120J/./21J2.060PEREGIANBEACHSCIREPORTSIJ2-060PEREGIANTlAREVISIONA,DOcr                                                                                                          15

Page 23

1-11
..KOl TRAffiC & TRANSPORT




         Figure 4.1:              DEVELOPMENT DIRECTIONAL DISTRIBUTION


                                      45%
                                            ~
            I David low Way (North)                                                                                           J
                                                                                                          David low Way (South)


                                                       L__
                                 l r r-                --

                                                             50%

                                  50%       45%




                                                   ~   95%
                                                                               SITE




                                                                                  100%


                                                       L               100%__t    J            RufousStreet   I
                                             r t_95%
                                               r-            5%



              ~                             5%




4.5      Intersection Performance


         The likely impact of the proposed development on the future year (2015 and 2025) peak hour operations

         on   the surrounding road network has been assessed based on the peak hour scenario turning movement

         forecasts. A series of SIDRA analyses were conducted for the following intersections.


                   David Low Way / Woodland Drive intersection

                   \l\Toodland Drive / Rufous Street intersection


         These     were     based       on       the   turning movement forecasts presented in Appendix E for the following
         scenarios:



                   Existing year (2013)
                   Opening year (2015)pre-development
                   Opening year (2015)post-development
                   Future year (2025)pre-development

                   Future year (2025)post-development


         The results of these analyses are presented in Appendix B and discussed in more detail below.




P:120JJ-J2IJ2.MOPEREGJANBEACHSC1REPORTSIJ2-MOPEREGJANTIAREVISJONA.DOCX                                                            16

Page 24

        4.5.1    David Low Way I Woodland Drive


        The SIDRA analysis of the David Low Way I Woodland Drive intersection was undertaken using the

        intersection layout as shown in Figure 2.2. The results of these analyses are attached in Appendix B, and

        are surnmarised in Table 4.3.




        Table 4.3:           DAVID LOW WAY I WOODLAND DRIVE OPERATIONS




                                                                                                                                 "_’<<’i                                            ~




                                                                                                                 ~h’,           ’                               ;:t,      ;;."~~         ,~
                                                                                                                 $oulh:illavi:flL’oww
                                                                                        ~                                       .T.                  ’..<’,"~’...,             ,.       111’..




                                                                                  ..~~~’~:t:;:’;:~~f~ ~~~l’t~:                                                                                                  .
                                                                                                                                                                                                                    .




                                                                                                                                                                                                                               .


                                                                                                                                                                                                                                       C~~

                                                                      .
                                                                          ,".,., :!:4!t~,               .’
                                                                                                                 l~s,!=~Q.o ~s"r:?,r~ ’:1f,t.~~p),ighl.rA.l"~                                                                                  -
                                                                                                                                                                                                                                                            -




                                                                                  ~!:,., f",r’         ...."r,                                                                                                                      "!IlI’’’
                                                                           ,..~                        .
                                                                                                                            --"-’~~n~-- .",~".,,~ -’-,;;~                                                  ~JJ’ __~--,rJ}                          -,


                                                                                                             ~.o.;v"W~y\"..T~r ~a_T1.d~~f!";’
                                                                                                                                                                                                                                                        -




                                                                           ’~Q.4 J;;’.h: Sq ,!b~P~                       ,..:
                                                                                    fj    :1}.::’,,/;’_
                                                                                         ~"j             ~"      ?’ r~’     -::t= -",l~" 1<1’’’ft-’,;.~%
                                                                                                                                          _~_’~-                       f;: ".:;t.                ~~
                                                                                    .9,jj.,i1 :t?Wr;sI"’Wo.l1d!!mdsD.riv~...L’tl’.rid,Rigb.t’:~’
                                                                                                                          .




                                                                                   .
                                                                                       ..      .       ’,’
                                                                                                                                );,,~~t:!~~);~:;~A\I~:~;l ~~                                                                                                .




                                                                                 j!5 ~::.,                 ~~~~~~,:;P~~<4’~v.>>:,~ iJhl~~f~~vdJ;;e~,i .                                                                                                 .




                                                                                 ’_r’0.5’ -,,~                 .
                                                                                                                 So               th:"p’,aVid"Low Way’olr~Q~gb and Left ~ ;.,.
                                                                                                                                                               r
                                                                                                                 ~                    ~            ....01.’                ,_,..                   .,...   _.           ~..,       ’___.                ’._


                                                                           ;":                                                                                                                                          ’w’
                                                                                                                                                                                                                                   -~
                                                                                                   _
                                                                                                       IT.
                                                                                                                     "


                                                                                                                                          ::;},,~,-                  .
                                                                                                                                                                           -_1:::                __.~-Q!m                                      ~ _,-’:~:
                                                                                  1:4 ,i;-
                                                                                  ~..
                                                                                                           .



                                                                                                               ’hVY_est: W~n’i~ DrlY5 ~;i:.e!.~d_~                                                                                              _.ii    .
                                                                                                                                                                                                                                                                .




                                                                                         ~..
                                                                                                       ~~~. :l’.(,.?I""~~~ )~’t’I’~.-,,~i-"’~
                                                                                   0.7         "          outh: DaVldlow.w                                                                                                               .




                                                                                    ":      ;"’~u.~~~.~~.,;;~                                                                                                            .




                                                                          "l!t,J.7 -...1"l~eE.;~:&.o21a~sB!lys.: l:~t".t:an~)~! t.....



        Table 4.3 demonstrates that the David Low Way I Woodland Drive intersection is expected to experience

        "excellent" or "very good" operations during the weekday                                               evening and Saturday peak periods. The
        addition of the development related traffic is not expected to significantly affect the critical degree of

        saturation.




        4.5.2    Woodland Drive IRufous Street


        The SIDRA analyses performed to quantify the existing and future year (ie 2015 and 2025) peak hour

        operations of this intersection were undertaken using the intersection layout as shown in Figure 2.3. The
        results of these analyses are summarised in Table 4.4 and presented in Appendix B.




P:12011-12/12.060PEREGIANBEACH SCIREPORTSI12.060PEREGIAN TIA REVISIONADOCX                                                                                                                                                                              17

Page 25

PI~ I
"EKOl T~APFlC & TIlANSPOllT




          Table 4.4:            WOODLAND DRIVE / RUFOUS STREET OPERATIONS


          !PEAK HOU~          & SCENARIO
                                                      ]~DEG:~:~[PER::IIRJtcRmCAL                            MOVEMENT


          Evening Peak
                                             .-                              ,.




              2013 Existing Conditions                             5%                      0.2   South: Rufous Street. Left and Right

              2015 Pre Development                                 5%                      0.2   South: Rufous Street   -   Left and Right
                                                 .-
                                                                         _--:i.::...
              2015 Post Development                                20%                     0.9   South: Rufous Street   -
                                                                                                                            Left and Right
                                                                              1
                                                          .                                                                                       =     .,

                                                                              .
              2025 Pre Development               ~        .        5%
                                                                             "
                                                                             "             0.2   South: Rufous Street   -
                                                                                                                            Left and Right
                                             1-_
                                                          .-                           ’                                                      ,   ..~




              2025 Post Development                                21%
                                                                         ’-!               0.9   South: Rufous Street. Left and Right
                                                                                 "

                                                          ;1":
                                                                             I’
          Saturday Peak                                                      ,
                                                 ~                               ,
                                                                                                                                             - -        .




              2013 Existing Conditions                             5%                      0.2   South: Rufous Street       Left and Right
                                                                             ir                                         -




                                                                                                                                             --
                                                     ,_                                                                                                  -




               2015 Pre Development                                5%                      0.2   South: Rufous Street   -   Left and Right
                                                                           ."
                                             .   .




               2015 Post Development                               23%                     1.0   South: Rufous Street   -
                                                                                                                            Left and Right
                                            ~.       -

                                                               -                     .
                                                          ’
                                                                             :!
               2025 Pre Development                                5%        "             0.2   South: Rufous Street   -
                                                                                                                            Left and Right
                                             .                               ,       .




               2025 Post Development                               24%                     1.1   South: Rufous Street   -   Left and Right
                                                     ._t._




          The results in Table 4.4 indicate that even with the addition of development related traffic, the Woodland

          Drive / Rufous Street intersection will experience "excellent" conditions.




          4_5.3     Summary

          Based on the analysis of expected future year operations it is concluded that:


                    intersection operations will be very good or excellent

                    th,e proposed development will not adversely effect local traffic operations

                    no intersection   upgrades are required to support the proposal




P:12011-12112-060PEREGIAN BEACHSCIREPORTSI12-060PEREGLAN TIA REVISIONA.DOCX                                                                             18

Page 26

5.0 CONCLUSIONS & RECOMMENDATIONS



5.1     Conclusions


        The proposed development has been evaluated in terms of its impact on the surrounding road network,

        site access operations and internal layout. The main points to note are:


        _       it is proposed to redevelop the site to provide               a   shopping centre development comprising a
                supermarket and associated specialty shops with a total of 1,850m2 GFA
        _       vehicular access to the development is proposed via a single point of access from Rufous Street

                the proposed development incorporates 100 car parking spaces and five motorcycle spaces (105

                spaces in total) which are expected to adequately cater for the anticipated parking demand

        _       the proposal includes a loading bay providing commercial vehicle                 servicing facilities, and the

                ability to accommodate on-site refuse collection
                adequate provision         is made for the        standing, parking, loading and unloading, access and
                manoeuvring of service vehicles within the development site
        _        during evening peak hour operations, the proposed development is expected to generate in the
                 order of 205 vehicle trip-ends with 242 predicted during the Saturday peak hour

        _       the proposed       development is not expected to have an adverse impact on future year traffic
                operations of the local road network
                 the proposed development is well serviced by public transport, and is within 200m of bus stops

        _       the proposal is not expected to have any adverse impact on local pedestrian and cyclist operations




5.2     Recommendations


        Based on our analysis it is recommended that:

                 Rufous Street is upgraded and widened to provide a 6.5m carriageway from the intersection with

                 Woodland Drive to the site access intersection.




P,12011.J’?112.060PEREGIANBEACHSClREPORTSI12.060PEREGIANTIA REVISION A.DOC<                                               19

Page 27

                             XCOD.A   NOISIVER   7A   NAIGEREP   060-2/ISTROPERICS   CH   NAIGEREP        060-2112/-1 /021,P




SYEVRUS    TNUOC   CIFFART

A   XIDNEPPA




                                                                                          TIOPSN"tT   &   CifFART    lOKI’f




                                                                                            I                IP

Page 28

AUSTRAFFIC MANUAL INTERSECTION COUNT                                                                                               David Low Way (north)


Site No.:
Location:
                                    Weather: Fine, occassional showers
                   David Low WaylWoodland Drive, Peregian                                                         8
                                                                                                                       C
                                                                                                                           ~1..."."""&."..J....+..                 ~.
                                                                                                                                                                                     ~
Day/Date:          Thursday 21 February 2013, 4:00pm to 6:00pm
                                                                                                                       ~
                                                                                                                  7
                                                                                     Woodland Drive (west)
                   Saturday 23 February 2013, II :OOam to 1:00pm
Thursday Peak:       HOllr ending   -5:30 PM
Saturday Peak:       HOllr ending   -J :00PM
                                                                                                             --r.l}......!........~............ ;
                                                                                                                                   David Low Way (south)



                                Movement 1                        Movement 2                         Movement 3                                 Movement 4                           Movement 5                        MovementS                          Movement 7                         MovementS             Pedestrian Movements
       TIME

    (114 hrend)                                                                                .l!
                                    ..                                                                  ..
                                                                                                                                         j                                    j                                  j
                          i                                ..
                                                                                                                                                                                        ~                  .
                                                     .l!                                                                           .l!                                  .l!
                    ..
                    :l1
                                    ~
                                    i
                                                     :l!   ~         I                   i     :l!
                                                                                               :l:
                                                                                                        ~
                                                                                                                                   :l1   :l:
                                                                                                                                                   I                    :l1   ~         i
                                                                                                                                                                                                           ..
                                                                                                                                                                                                           :l!   :l:
                                                                                                                                                                                                                          I                   i     I        I                   i              t
                    :l:                              :l:                             "   :l:            ~                   "      :l:                              "   :l:                            "   :l:                            "   :l:                            "   :l:
                                                                                                                                                                                                                                                                                       :>
                                                                                                                                                                                                                                                                                                               "
                                                                                                                                                                                                                                                                                                                    A       B      C

                    ~     j ~       ’"
                                             !
                                             ~   f   ~     ~
                                                            <:-
                                                                     ~
                                                                               !
                                                                               ~
                                                                                     ~
                                                                                     ~   ~
                                                                                                <:-
                                                                                                :
                                                                                               l:       ~
                                                                                                                  !
                                                                                                                  ~ ~
                                                                                                                            ,I,l
                                                                                                                                   ~     ~
                                                                                                                                          <:-
                                                                                                                                                   ~
                                                                                                                                                             11
                                                                                                                                                             ~          ~     i         ’"
                                                                                                                                                                                        15
                                                                                                                                                                                        >:
                                                                                                                                                                                                  !
                                                                                                                                                                                                  ~        ~     I         ~
                                                                                                                                                                                                                                    l!
                                                                                                                                                                                                                                    ~         ~     I        ~
                                                                                                                                                                                                                                                                       ! ,I,l
                                                                                                                                                                                                                                                                       ~ ~       ~
                                                                                                                                                                                                                                                                                       ~
                                                                                                                                                                                                                                                                                       ~
                                                                                                                                                                                                                                                                                                ’"

                                                                                                                                                                                                                                                                                                ~
                                                                                                                                                                                                                                                                                                         !
                                                                                                                                                                                                                                                                                                         ~
     4:15PM                0        0            0          0                            106    .        0    110                         0         0        .      0   102   .          0    107                0         0              0         0                        0                   0

     4:30 PM               0                                                             9.                   ..                          0                             101                   109                          0              0         0

     4:45 PM                                                                             "’                   118                                                       10.                   104                                             16                       II

     5:00 PM                                                                             9.                       97                                                    121                   123

     5:15 PM                                                                             6.                   ..                                                        113                   ’"

     5:30 PM                                                                             109                  110                                                       136                   137          10                       10

     5:45 PM                                                                             93                   ..                                                        105                   108                                                                      2

     6:00 PM                                                                             67                   ..                                                        117    1              118          7                        7         7                        7
                                                                                                                                                                                                  G


         ~                                           ;!;                   :II           ~     ::                 ~                I;;                       I;;        : 1:                      ..
                                                                                                                                                                                                           "                        "         "                        "         :!                      :!


         "
         N



       ,.,~
                                                     ::?                       ::?                                                 :!!                       :!!        ~                         5        I;;                      I;;       g                        g
       ~ =                                                                               ~                        ;
       ~..
       ~


                                Movement 1                        Movement 2                         Movement 3                                 Movement..                           Movement 5                        Movement 6                         Movement 7                         Movement 8            PedestrIan MOVements
       TIME

    (1/4 hr end)          .l!                                                                  .l!                                       ..
                                                                                                                                                                              j                                                                     j                                  ~
                    .l!
                    :l1
                    :l:
                          ~         I            "
                                                     j
                                                     :l:
                                                           i         I                   i
                                                                                         :l:
                                                                                               :l1
                                                                                               :l:
                                                                                                        I
                                                                                                                                   .l!
                                                                                                                                   ~
                                                                                                                                   :l:
                                                                                                                                         ~
                                                                                                                                         :l:
                                                                                                                                                   I                "
                                                                                                                                                                        ..
                                                                                                                                                                        :l!
                                                                                                                                                                        :l:
                                                                                                                                                                              "
                                                                                                                                                                              :l:
                                                                                                                                                                                        I              "
                                                                                                                                                                                                           i
                                                                                                                                                                                                           :l:
                                                                                                                                                                                                                 ~
                                                                                                                                                                                                                 "
                                                                                                                                                                                                                 :l:
                                                                                                                                                                                                                          I                   i
                                                                                                                                                                                                                                              :l:
                                                                                                                                                                                                                                                    ~        I               "
                                                                                                                                                                                                                                                                                 .l!
                                                                                                                                                                                                                                                                                 :l!
                                                                                                                                                                                                                                                                                 :l:
                                                                                                                                                                                                                                                                                       :l:
                                                                                                                                                                                                                                                                                                I              "
                                                                                                                                                                                                                                                                                                                    A       B      C
                                                                                     ~                                      ~
                    :
                      <:-
                      :
                    :3’   l:        ~
                                             !~
                                             ~ ~     ~     I         ~
                                                                               l!
                                                                               ~         ~     i        ~
                                                                                                                  !
                                                                                                                  ~
                                                                                                                    ~
                                                                                                                    0
                                                                                                                                   "

                                                                                                                                   :3’   I          ~
                                                                                                                                                             ! ,I,l
                                                                                                                                                             ~ ~        ~     ~
                                                                                                                                                                               <:-
                                                                                                                                                                                        ~
                                                                                                                                                                                                  !
                                                                                                                                                                                                  ~    ~ ~
                                                                                                                                                                                                                 <:-
                                                                                                                                                                                                                 ~         ~
                                                                                                                                                                                                                                    !
                                                                                                                                                                                                                                    ~     !~        <:-
                                                                                                                                                                                                                                                    :
                                                                                                                                                                                                                                                    l:       ~
                                                                                                                                                                                                                                                                       !
                                                                                                                                                                                                                                                                       ~         ~     I        ~
                                                                                                                                                                                                                                                                                                          !
                                                                                                                                                                                                                                                                                                          ~    ~
     11:15AM         1     0        0        1   0    3     0         0        3     0   111    2        0    113            0      3     0         0        3      0   110   2          0    112      0   7     0         0        7     0    9    0         0        .     0   3     0         0        3    0    0       0      0

     11:30AM         3     0        0        3   0    2     0         0        2     0   99     0        0        ..         0     .      0         0        .      0   109    1         0    110      1   6     0         0        8     0   7     0         0        7     0    1    0         0        1    0    0       0       5

     11:45AM         0     0        0        0   0    3     0         0        3     0   111    1        0    112            0      5     0         0        5      0   105    0         0    105      0   .     0         0         ,    0    9    0         0        .     0   .     0         0        .    0    0       0       0

     12:00 PM        0     0        0        0   0    3     0         0        3     0   103    0        0    103            0     .      0         0        .      0   116    1         0    119      2   6     0         0        .     0    5    0         0        5     0   3     0         0        3    0    0       0       1

     12:15 PM        0     0        0        0   0    2     0         0         2    0   112    3        0    115            1      1     0         0         1     0   134    1         0    135      0   .      1        0         5    0   16    0         0        ,.    0   3     0         0        3    0    0       0       1

     12:30 PM        0     0        0        0   0    0     0         0        0     0   112    0        0    112            1     2      0         0        2      0   133    3         0    138      2   9     0         0        .     0   12    0         0        12    0   3     0         0        3    0    0       0       1

     12:45 PM        1     0        0        1   0    1     0         0         1    0   100    2        0    102            1      1     0         0         1     0   12.   2          0    130      2   .     0         0        .     0    3    0         0        3     0   .     0         0        .    0     1      0       1

      1:00 PM        0     0        0        0   0    2     0         0         2    0   110    1        0    111            0      9     0         0        .      0   116    1         0    117      0   .      0        0        .     0    5    0         0        5     0   .     0         0        .    0    0       3       1
                    ~     0         0        ~   0         0         0               0         ..        0                  M            0         0                0                   0              ~         -         0              0         0        0               0         0        0              0    -       M
                                                     :!!                       :!!                                                 Ie                        Ie         ii!   ;:
                                                                                                                                                                                                  i        ~                        51        IS                       :s        I;;                     I;;                       :;!
         !                                                                               :                        =
         {!.
         "
         N



       ,.,~               0         0            0   ~     0         0         ~     0         ..        0                  M            0          0               0         ~         0         ..   .                   0              0         0        0               0         0        0              0           M       .
                    -                        -

                                                                                                                  !                ::?                       ::?                                           :::   -
                                                                                                                                                                                                                                    :II       l5;                      :II       ;!                       ;!        -

       .  .                                                                              a                                                                              ~                         ~

       ~~
       .:l




                                                                                                                                                                                                                                                                                                                                   ~~.


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

David Low Way (north)

AUSTRAFFIC MANUAL INTERSECTION COUNT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

g 2
& o -reoonr o eK ie g 0 cworer ee = Hh 5
5 5
s 2
= m locccccec of lo = m locccccce of Ic
= =
3 s
: < Joccccec- of lo 3 < |Jococccec~ of 1b
é
s1249]0 © © © © 0 0 Ol o spk] 2 2 © 0 © © ofp lo
. pole nar or - ols 5 . wolo- enn ~< <2 ln
5 3
§ | eveantty oy] oo © 2 © 2 0 ofp lo § | eneontty ono oo © oo © ofp lo
2 2
sopuen knvH]0 0 0 0 0 0 0 ofp lo safe) MPH] o 0 © 0 0 © Oo Olp lo
seen won} sm — om = feb s sepMeA WEN]? -— oO mo © ele vs
gepho]o 0 0 © © 0 0 ofp o s890ho]0 oo oc 0 0 © ofp lo
mojo ~« £0 < ow ney loc polo no 0 2S @ why loc
§ 5
Bo ro o Bo oo lo
g 2
sewer heey] © © 0 oo 0 ofp o sepuen hep] © © © 0 0 0 Ol lo
sepyen won}o « So eo 0 nly loc sepyenWen|o no © SY o ole ec
gepko]o 0 © © © 0 0 ofp o s890ho]0 © 0 © © © © ofp lo
mojo o ooo 2 only liz wo|n © 0 © © o © ~los ve
© ©
5 5
E | eigeonttyion]o © © 0 oo © ofp lo | aqeonddy nfo co 0 0 0 0 ofp lo
g g
2 2
sepen deep] 0 © 0 0 0 0 0 ofp o s12M0A hrvoH]0 © oO ~ oO Off t
sepyeryin|o - © © o So nigy az sepuen won| 2 © © < o © ey cz
spyoko] oo 0 © © 0 0 ofp lo spko]o ~ oN ow Oly 1
e revo) 5 jour . molt 23283 3 Elyse les
5 5
J [rmmreyc oo ecco of lo § | asearsvino 2 2 oo 2 © oo lo
2 2
sopuen MeeH]o @ o oo — ~ foe s sojayen hnvoy] en oe eo ww fE A
sopuen wor] 5S 8 28 8 Flees vey soouen wor] SS 238 8 Lies hes
spk] 0 0 © © 2 0 olp o sk] 2 0 0 0 0 0 ofp lo
a pole rm oon an aie lor polo toe a ol6z les
Be :
& | E| evaeondyon]o coo co 0 ofp 0 B | areanidy onfo 0 0 0 0 0 ofp o
ef i
z
é sapyen uon]o - 9 © 0 Nae ot soayon yon] o eo em A  olge lee
s1s99fg]0 0 0 0 0 0 0 ofp lo sp1kglo oo Oe - ~ off le
° mol 325 82 8 Sloe hy ° poll 32822 8 Ele Jory
= : z
$ Be o E | ergeanidyionjo oo 0 0 0 Of o
¥ 3 g
z sojawen MnvoH] ee we mo wl 2 sepen heey] vo - om Ow Hie lo
z = x = ag e
3 sepuen oS 3 = 8 888 slew cov sepuen won| = B= SSS 8 Shese Iver
S
spyofg]o 0 © 0 0 0 0 ofp lo ssykq}o 0 oC oo Oo Olp lo
pola ovo - om ely ler mojo won wo ~ alo s
§ § &
g ce Be o ff o
2.8 s 3
akss
ahg- sepauyen hve] 2 © 2 © © © ofp o sepuen hep] © © © © © © ofp o
sges
ge E85 semen Won Oo eo - om he let sepMeA WEN] Wo NOH A ipE ls
828s
gata Messe sees ol lo mytolo 0 0 0 0 0 0 off 0
EEESER
ES8Sss
Z3eens malls Oi eo oH, lz pil} 9 © 0 0 ~ off 1,
4 as = =
gS @ i 5
eSee.. eqvayddy joyn]o © © © © © © ofp lo E | eiqvonddyjonjo © © © © © © ofp lo
SSS §
BOSS 2 2
age
geese seen Mno_]0 0 0 0 0 0 0 lp lo separ Aneey]o © © © © © © ofp lo
sites
R238 sequen Wo]Oo - © - ~ CO wy ke sequen Wen] - 9 © 2 © © ~ Olg 1b
-A5G
& z =z See22225e
ze Bb Z: ERRE Eee eee g: ete ae
gis 33 Fe SESeEess [fepsinuy Fs ER285828 fepames
ate EE = = FEERSaS
= = =e
Gad Fa

 

 

 

Page 29

AUSTRAFFIC MANUAL INTERSECTION COUNT

Site No.:                             Weather: Fine, occassional showers

Location: David Low Way/Woodland Drive, Peregian

Day/Date: Thursday 21 February 2013
               Saturday 23 February 2013
Thursday Peak:            Hour ending      -
                                                   5:30 PM

Saturday Peak:            Hour   e’nding   -
                                                   1:00 PM                                                                                     David Low Way (north)




                                                                                          ...... ....................................................................................................................................... .........




                                                                                                           Total                                                                      2                 3              Total                           Movements

                                                                                                                                                                                                                                                     vol
                                                                                                                                                                                                                                                 -
                                                                                                                                                                                                                                                           Thursday
                                                                                                                                                                                                                                                            PEAK
                                                                                                                                                                                                                                                     %CV
                                                   Thursday PEAK Safurday PEAK
                                                                                                                                                                                                                                                     vol
                                                                                                                                                                                                                                                 -
                                                                                                                                                                                                                                                           Salurd:ly
                                                                                                                                                                                                                                                            r~^K
                                                    vol
                                                          I   %CV      vol     I   % CV                                                                                                                                                              %CV

                            ..




                                                                                                                                                                                                                                                                                N
                                      Total    I    35         0%      50          0%,




                                       8       I     5         0%       14         0%




                                       7             30        0%      36          0%




                                 Woodland Drive (west)



                                      Total    I    40         0010    29          30/0




                                                                                                                                                                                                                                                               Origin
                            T
                                                                                   vol                                                                                                                                                                                  North   South   West
                                                                Thursday


                                                                                                                                                                                                                                   I
                                                                               -




                                                                 PEAK              %CV                                                                                                                                                                         Thurs     43%     53%     4%


                                                                                   vol                                                                                                                                                                         Sat       42%     53%     5%

                                                              Saturday PEA K   -




                                                                                   %CV


                                                                                                            Total               6                 5                 4                                                   Total                                  Destination


                                                                                                                                                                                                                                                                        North   South   West


                                                                                          ~..... ....................................................................................................................................... .........             Thurs     49%     46%     4%


                                                                                                                                                                                                                                                               Sat       51%     47%      3%




     Legend
     vol   =
               total vehicle volume
                                                                                                                                               David Low Way (south)
     % CV      =
                   percentage ofcommercial vehicles (trucks and buses)

Page 30

B




APENDIX ANLYSE
     INTERSCO


[OCR of page images]
 

 

PEKOL TRAFFIC & TRANSPORT

P:12011-12\12-060 PEREGIAN BEACH SCiREPORTS|12-060 PEREGIAN TIA REVISION A.DOCX

APPENDIX B
INTERSECTION ANALYSES

Page 31

MOVEMENT SUMMARY
Site: 2013 PM Existing Conditions

12-060 Peregian Beach SC
David Low Way I Woodland Drive
2013 PM Existing Conditions
Giveway I Yield (Two-Way)




                                            1.0   0.265           0.5      LOS A               0.0         0.0    0.00    0.07   59.2

 2           T1                 484         1.0   0.265           0.5      LOSA                0.0         0.0    0.00    0.07   59.2

 3u           U                  16         1.0   0.014          12.9                                                            45.2

 Approach                       527         1.0   0.265           0.9          NA              0.1         0.4    0.01    0.09   58.6

     orth: 5vi<!J,.ow Way   -
                                North   -




 8           T1                 415         1.0   0.214           0.0      LOSA                0.0         0.0    0.00    0.00   60.0

 9           R2                  13         1.0   0.014          12.0      LOS B               0.1         0.4    0.50    0.71   45.9

 9u           U                   2         1.0   0.014          12.0      LOS B               0.1         0.4    0.50    0.71   45.9

 Approach                       430         1.0   0.214           0.5          NA              0.1         0.4    0.02    0.02   59.3

 West: Woodland Drive       -
                                West

 10          L2                   5         1.0   0.089          17.4      LOSC             0.3            2.1    0.69    0.89   41.5

                                                                 17.4      LOS C            0.3            2.1    0.69    0.89   41.5

 Approach                        35         1.0   0.089          17.4      LOS C            0.3            2.1    0.69    0.89   41.5
                                                                                      -
                                                                                          -     -                 -   -   --




 Ail Vehicles                   993         1.0   0.265           1.3          NA           0.3            2.1    0.04    0.09   58.1



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 2:15:47 PM                Copyright@ 2000-2013 Akcelik and Associates Pty LId
SIDRA INTERSECTION 6.0.2.3730                             www.sidrasolutions.com                                  SIDRA
Project: P:\2011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\David Low Way       -
                                                                                               Woodland Dr.sip6   INTERSECTION 6
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC

Page 32

MOVEMENT SUMMARY
Site: 2015 PM Pre Development
12-060 Peregian Beach SC
David Low Way I Woodland Drive
2015 PM Pre Development
Giveway I Yield (Two-Way)



 Movement Performance             -
                                      Vehicles
                                                                                                         of
J.Mov~’.\r;:2/9Djj’.i~ iiP.~:~and
~ID’:’!h~IPMov’~:;~~~i~Total             HV      ~,~,JSatn.~ DelaY~~ servlce);!~r"Vehlclesji Que~.~.lf’E!f;r2.p’:;,~.:..~t~1’f~ct!x~e~f.ve~g~.
                                       FIOW~’I:t~1~Deg:.l:~lllVerag~;f?#)..:e.~~J.,~!i/~~95%.i~a.s<  ~Dlstanc~          u eued ’L tV,Stop Rate
                                                                                                                                 ~~
                                                                                                                              ,"! 1’i’~         ’1">:>::J~
                                                                                                                                                    wr.:
                                                                                                                                                             Speed
~:!7~1s~~~~~~~j~t~~~v h/h                 %~~    (~
                                                          ~~~ ~~rse’~~:tt~f~~rlf,\~~.
                                                      ~~~",v/    ~J’                       ~~\~?kvehl~~;~~:~im          I;~{’;./,I
                                                                                                                                         .,._

                                                                                                                                     ~’if~",: er veh ,~:;1km/h
                                                                                                                                    ,.




 South: David Low Way’ South
                        -




 1          L2               28          1.0            0.274           0.5      LOS A            0.0            0.0      0.00                     0.07        59.2

 2          T1              501          1.0            0.274           0.5      LOSA             0.0            0.0      0.00                     0.07        59.2

 3u         u                17          1.0            0.015          12.9      LOSS             0.1            0.4      0.46                     0.71        45.2

 Approach                   546          1.0            0.274           0.9         NA            0.1            0.4      0.01                     0.09        58.6


 North: David Low W     -
                            North
 8          T1              430          1.0            0.222           0.0      LOSA             0.0            0.0      0.00                     0.00        60.0

 9          R2               13          1.0            0.015          12.1      LOS S            0.1            0.4      0.51                     0.71        45.8

 9u         U                 2          1.0            0.015          12.1      LOS S            0.1            0.4      0.51                     0.71        45.8

 Approach                   445          1.0            0.222           0.4         NA            0.1            0.4      0.02                     0.02        59.3


 West: Woodland Drive   -   West

 10         L2                5          1.0            0.094          17.9      LOSC             0.3            2.2      0.71                     0.89        41.0

 12         R2               30          1.0            0.094          17.9      LOS C            0.3            2.2      0.71                     0.89        41.0
 Approach                    35          1.0            0.094          17.9      LOSC             0.3            2.2      0.71                     0.89        41.0


 All Vehicles           1027             1.0            0.274           1.3         NA            0.3            2.2      0.04                     0.09        58.1



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak lik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 4:50:32 PM                      Copyright@ 2000-2013 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.2.3730                                   www.sidrasolutions.com
Project: P:\2011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\David Low Way
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC
                                                                                                 -
                                                                                                     Woodland Dr.sip6    ~’~~em$N~

Page 33

MOVEMENT SUMMARY
Site: 2015 PM Post Development

12-060 Peregian Beach SC
David Low Way / Woodland Drive
2015 PM Pre Development
Giveway / Yield (Two-Way)




Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 4:50:33 PM          Copyright@ 2000-2013 Akcelik and Associates Ply Ltd
SIDRA INTERSECTION 6.0.2.3730                       www.sidrasolutions.com
                                                                                                              SIDRA
Project: P:\2011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIDavid Low Way   -
                                                                                           Woodland Dr.sip6   INTERSECTION 6
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC

Page 34

MOVEMENT SUMMARY
Site: 2025 PM Pre Development
12-060 Peregian Beach SC
David Low Way I Woodland Drive
2025 PM Pre Development
Giveway I Yield (Two-Way)


                                                               --          -           -




 Movement Performance                -
                                         Vehicles
~Mov
                                            ~;:’~P~gj:;,’I~yerag~.~L.1;Level oq;~I’:95%’
                           Dema,n<;l ,FLows~’;                                                    Oue~~~"_,~;:). ~roP:!l~f~Ettt?.ctl’l~:’~~~[’.
                                                                                                     Ba,~~    f                 j’                                   er


       ’\~~~l.O.(~
;1IP,~~~~~.M   Z~iflJIot.’!!~’;’;1.t’i’HV ::~t~t~tsa.t~~lJ[).~laYi;                N~.r,i.cJ~~,;..,~19!1\~?e: fQ~e<u~?:!l;’;,s~o~
                                                                           ’l),l,S,:rvice ’.i~.
                                                                           ;                                                                  ~peedg~~’
                                                                                                                                                      ,~ate:’t,1            ,


i!ki’;:,., .jM{,~...   ,~ veh/h’.~,~~~o/o0l’l.)th~.4’V/C,^",0t0K1sec ,"J       ’
                                                                                   ~; "~~ ,}~" :,-’;",weh             m    ’.J;,r",-<l.t, J’..;’.;;;, Hll er veh ;,i;t~"ikm/h
 South: David Low Way_     -
                               South
 1               L2             33          1.0     0,326            0.6           LOS A                0.0         0.0              0.00              0.07           59.2

 2              T1             596          1.0     0.326            0.6           LOSA                 0.0         0.0              0.00              0.07           59.2

 3u              U              20          1.0     0.019           13.4           LOS B                0.1         0.5              0.50              0.73           44.8

 Approach                      649          1.0     0.326            0.9               NA               0.1         0.5              0.02              0.09           58.6


 North: David Low W y~ North
                           -




 8              T1             511          1.0     0.264            0.0           LOSA                 0.0         0.0              0.00              0.00           59.9

 9              R2              16          1.0     0.020           12.7           LOS B                0.1         0.6              0.55              0.75           45.2

 9u              U               2          1.0     0.020           12.7           LOS B                0.1         0.6              0.55              0.75           45.2

 Approach                      529          1.0     0.264            0.5               NA               0.1         0.6              0.02              0.03           59.3

 West: Woodland Drive      -
                               West
 10              L2              5          1.0     0.128           21.8           LOSC                 0.4         2.9              0.79              0.93           38.4

 12             R2              30          1.0     0.128           21,8           LOSC                 0.4         2.9              0.79              0.93           38.4

 Approach                       35          1.0     0.128           21.8           LOSC                 0.4         2.9              0.79              0.93           38.4


 All Vehicles              1214             1.0     0.326            1.3               NA            0.4            2.9              0.04              0.09           58.0



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 4:50:33 PM
SIDRA INTERSECTION 6.0.2.3730
                                                            Copyright@ 2000-2013 Akcelik and Associates Ply Ltd
                                                            www.sidrasolutions.com
                                                                                                                                     SlfAA
Project: P:12011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIDavid Low Way
8000122,ADAM PEKOL CONSULTING, PLUS /1PC
                                                                                                    -
                                                                                                        Woodland Dr.sip6
                                                                                                                                     INfERs-et’TfN &

Page 35

MOVEMENT SUMMARY
Site: 2025 PM Post Development

12-060 Peregian Beach SC
David Low Way / Woodland Drive
2025 PM Pre Development
Giveway / Yield (Two-Way)




            L2                         1.0   0.354           1.2       LOSA             0.0            0.0    0.00   0.16     58.2

 2          T1                 596     1.0   0.354           1.2       LOSA             0.0            0.0    0.00   0.16     58.2

 3u         U                   20     1.0   0.019          13.4      LOS B             0.1            0.5    0.50   0.73     44.8

 Approach                      702     1.0   0.354           1.6          NA            0.1            0.5    0.01   0.17     57.7

 North: D~vid Low Way      -   North

 8          T1                 511     1.0   0.264           0.0       LOSA                0.0         0.0    0.00   0.00     59.9

 9          R2                  63     1.0   0.078          13.2      LOS B             0.3            2.2    0.59   0.83     44.8

 9u         U                    2     1.0   0.078          13.2      LOS B                0.3         2.2    0.59   0.83     44.8

 Approach                      576     1.0   0.264           1.5          NA               0.3         2.2    0.07   0.09     57.8


 1IY.t:..’&’o Hand~Drive   -   West

 10         L2                  58     1.0   0.424          24.9      LOS C                1.9        13.4    0.82   1.02     36.5

 12         R2                  77     1.0   0.424          24.9      LOS C                1.9        13.4    0.82   1.02     36.5

 Approach                      134     1.0   0.424          24.9      LOS C                1.9        13.4    0.82   1.02     36.5


 All Vehicles              1412        1.0   0.424           3.8          NA               1.9        13.4    0.11   0.22     54.7



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 4:50:34 PM           Copyright @ 2000-2013 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com
                                                                                                              SIDRA
Project: P:\2011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\David Low Way   -
                                                                                           Woodland Dr.sip6   INTERSECrrON 6
8000122,ADAM PEKOL CONSULTING, PLUS 11PC

Page 36

MOVEMENT SUMMARY
Site: 2013 SAT Existing Conditions
12-060 Peregian Beach SC
David Low Way I Woodland Drive
2013 PM Existing Conditions
Giveway I Yield (Two-Way)


                                                                                                                                                                  -
                                                                                                                   -
                                           -                        -
                                                                -




,
     Movement Performance                       -   Vehicles
                               ~tDem-and                                                    31 !95%18 ck’ Queue ~ ~!’:-.
                                                                                                            of                P.rop:;~:’~Effectlve:)’.’.~Average’f
                                                                                                                                  of                  \.,

    lMOV,!;~:""~ODZt~’-’~’_~-’:
                       \.~....~1"I~
                                          F,IOWS;~f:;~’~7,iDeg:~:":’.’1Average"’J,nLevel
                                                              tt.,f- ":~1                                    ..~t~)      "-’-""’’’i         ".’\:....~"     "~I       ’.’\.""".   ~-<..~.   or_




         -;ii~~i.’~..tW,~~v~                                   ~1:’li.".J!~r
    ..                                                                                     ’’’rj;   ’;
                                                ,~..
         ’<,’ifJ.             ;:~!Total ’1_\,~lHV~~~"                        elay :tService’" ’.;-.Vehicles ;~.;"Dlstance,~,,’Queued ’iltStop’Rate’,: fSpeed’
    hiD               ~’;’::                    ..,~"  MSatn,~:’,:i1’t’                    S,",\I
    ~~:,\~ttfi~.                          h/h           %\t;~~..,,~t~v/ ’~,;~ !11}~-,J~;Jsec~,.;’I~.~’~,’f’~;-~’:.~~~’l:.;"~;,~’,r~1~v h~~:;:~:~~~t ~m~~’,&~)’:,:;’.~~~ l}~?f’ 1vert, ~<~.~:,~km/h’
    South                     ay      -
                                          Sout

     1                                    25            1.0             0.295           0.5              LOS A            0.0               0.0              0.00                    0.06    59.3

    2                                     545           1.0             0.295           0.5              LOSA             0.0               0.0              0.00                    0.06    59.3

     3u                                    14           1.0             0.012          13.1              LOS B            0.0               0.4              0.47                    0.71    45.0

    Approach                              584           1.0             0.295           0.8                NA             0.0               0.4              0.01                    0.07    58.9




                                                        1.0             0.239           0.0              LOSA             0.0               0.0              0.00                    0.00    59.9

                                                        1.0             0.006          12.4              LOS B            0.0               0.2              0.53                    0.69    45.6

                                                        1.0             0.006          12.4              LOS B            0.0               0.2              0.53                    0.69    45.6

                                                        1.0             0.239           0.2                NA             0.0               0.2              0.01                    0.01    59.7




                                                        1.0             0.141          18.4              LOSC             0.5               3.5              0.72                    0.89    40.7

     12         R2                                      1.0             0.141          18.4              LOS C            0.5               3.5              0.72                    0.89    40.7

     Approach                             53            1.0             0.141          18.4              LOSC             0.5               3.5              0.72                    0.89    40.7


     All Vehicles                     1106              1.0             0.295           1.4                NA             0.5               3.5              0.04                    0.09    58.0



    Level of Service (LOS)Method: Delay (HCM 2000).
    Vehicle movement LOS values are based on average delay per movement
    Minor Road Approach LOS values are based on average delay for all vehicle movements.
    NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
    good LOS measure due to zero delays associated with major road movements.
    SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
    Gap-Acceptance Capacity: SIDRA Standard (Ak lik M3D).
    HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




                                                                                Copyright @ 2000-2013 Akcelik and Associates Ply Ltd
Processed: Tuesday, 14 May 2013 4:50:35 PM
SIDRA INTERSECTION 6.0.2,3730                                                   www.sidrasolutions.com
                                                                                                                                                            SlCIn~
Project: P:\2011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\Oavid Low Way                                     -
                                                                                                                             Woodland Dr.sip6               l ~% 5ft1;lgN 6
8000122,ADAM PEKOL CONSULTING, PLUS 11PC

Page 37

MOVEMENT SUMMARY
Site: 2015 SAT Pre Development
12-060 Peregian Beach SC
David Low Way I Woodland Drive
2015 SAT Pre Development
Giveway I Yield (Two-Way)




                                    1.0     0.305           0.5       LOSA                 0.0         0.0    0.00   0.06     59.3

 2          T1              564     1.0     0.305           0.5       LOSA                 0.0         0.0    0.00   0.06     59.3

 3u         U                14     1.0     0.012          13.2      LOS B                 0.1         0.4    0.48   0.71     45.0

 Approach                   604     1.0     0.305           0.8          NA                0.1         0.4    0.01   0.07     58.9

 North: D vid Low Way   -   North

 8          T1              480     1.0     0.248           0.0       LOSA                 0.0         0.0    0.00   0.00     59.9

 9          R2                5     1.0     0.007          12.5      LOS B                 0.0         0.2    0.53   0.70     45.5

 9u         U                       1.0     0.007          12.5      LOS B                 0.0         0.2    0.53   0.70     45.5

 Approach                   486     1.0     0.248           0.2          NA                0.0         0.2    0.01   0.01     59.7




 Approach                    53     1.0     0.149          19.1      LOS C                 0.5         3.7    0.74   0.90     40.2


 All Vehicles           1143        1.0     0.305           1.4          NA                0.5         3.7    0.04   0.08     58.0



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 20134:50:35 PM           Copyright @ 2000-2013 Akcelik and Associates Ply Ltd
SIDRA INTERSECTION 6.0.2.3730                       www.sidrasolutions.com
                                                                                                              SIDRA
Project: P:\2011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIDavid Low Way   -   Woodland Dr.sip6   I NTERSEtTI ON 6
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC

Page 38

MOVEMENT SUMMARY
Site: 2015 SAT Post Development
12-060 Peregian Beach SC
David Low Way I Woodland Drive
2015 SAT Pre Development
Giveway I Yield (Two-Way)


                                                                                                                -
                                                                                           -    --

                                               --
         --




     Movement Performance                  -
                                               Vehicles
<


                                                                                                                    9ue~~ l~,’l .)~ ~!.?~::#~ ~’Effectl,!e
        ~ ~:,iHOP :.{.::r~’;L.(~Deman~.
                                                ~1’?Ws~:r~~Deg~.ver~ge,",~lL vel~~f.~9"5}’o(\3aB..?f
    lM
    iID~.";~.~f!Mov...: 1 ;""j:>Total"l!1’:,5 HVP.l’i ,\&Satn’
                       ’




    tfi~.~,;~:}~~;~~;~.~~~q:j,~,v h/h’
                                               ~..


                                                      /o~\~l’%:i.   ,
                                                                                                ~1~Dlstance~.
                                                                        Delay"~.,{,.5!’Service~~~    Vehlcles                   ,;’Queued’:;;’IlStop Rate,   .Averag~
                                                                                                                                                             .,   Speed
                                                                        ;l~se~’;~;;:’l’}lt:r_M’Jf,~~’ t~;<(.;;",.~ ::~~-n~;....;,~,oJ:>t1’;r.U’ er v li’!t.~:jf’4lkm/h
     South. DaVid La        a~   -
                                     SOUl
     1          L2                   89              1.0    0.340           1.3        LOSA               0.0             0.0         0.00           0.17             58.0

     2          T1                   564             1.0    0.340           1.3        LOSA               0.0             0.0         0.00           0.17             58.0

     3u          u                   14              1.0    0.012          13.2        LOS B              0.1             0.4         0.48           0.71             45.0

    Approach                         667             1.0    0.340           1.6            NA             0.1             0.4         0.01           0.18             57.7




                                                     1.0    0.248           0.0        LOS A              0.0             0.0         0.00           0.00             59.9

                                                     1.0    0.074          12.9        LOS B              0.3             2.1         0.58           0.82             45.1

                                                     1.0    0.074          12.9        LOS B              0.3             2.1         0.58           0.82             45.1

                                                     1.0    0.248           1.6            NA             0.3             2.1         0.07           0.10             57.7




     10                                              1.0    0.480          23.9        LOSC               2.4            16.9         0.81            1.04            37.1

     12         R2                   95              1.0    0.480          23.9        LOS C              2.4            16.9         0.81            1.04            37.1

     Approach                        174             1.0    0.480          23.9        LOSC               2.4            16.9         0.81            1.04            37.1


     All Vehicles                1385                1.0    0.480           4.4            NA             2.4            16.9         0.13           0.25             53.9



    Level of Service (LOS)Method: Delay (HCM 2000).
    Vehicle movement LOS values are based on average delay per movement
    Minor Road Approach LOS values are based on average delay for all vehicle movements.
    NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
    good LOS measure due to zero delays associated with major road movements.
    SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

    Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
    HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




    Processed: Tuesday, 14 May 2013 4:50:36 PM                      Copyright @ 2000-2013 Akcelik and Associates Pty Ltd
    SIDRA INTERSECTION 6.0.2.3730                                   www.sidrasolutions.com
    Project: P:\2011-12112-060 Peregian Beach’SCICalcslSIDRAIRevised SIDRAIDavid Low Way
    8000122,ADAM PEKOL CONSULTING, PLUS 11PC
                                                                                                         -   Woodland Dr.sip6        S~’~ni’r
                                                                                                                                     .w-l"t’;S t:,S~~
                                                                                                                                     ’I."        .
                                                                                                                                                     -~.1         ,
                                                                                                                                                                      I., r’

Page 39

MOVEMENT SUMMARY
Site: 2025 SAT Pre Development

12-060 Peregian Beach SC
David Low Way / Woodland Drive
2015 SAT Pre Development
Giveway / Yield (Two-Way)




                                    1.0      0.364           0.5      LOSA              0.0            0.0    0.00    0.06    59.3

 2          T1               672    1.0      0.364           0.5      LOS A             0.0            0.0    0.00    0.06    59.3

 3u         U                 17    1.0      0.017          13.7      LOS B             0.1            0.5    0.53    0.74    44.5

 Approach                    720    1.0      0.364           0.8          NA            0.1            0.5    0.01    0.08    58.8

      : David Low   Way -_No.!!h
 8          T1               571    1.0      0.294           0.0      LOSA              0.0            0.0    0.00    0.00    59.9

 9          R2                 6    1.0      0.009          13.3      LOS B             0.0            0.2    0.58    0.74    44.8

 9u         U                       1.0      0.009          13.3      LOS B             0.0            0.2    0.58    0.74    44.8

 Approach                    578    1.0      0.294           0.2          NA            0.0            0.2    0.01    0.01    59.7

       Woodland Drive    -
                             West

            L2                15    1.0      0.212          24.6      LOS C             0.7            5.1    0.83    0.96    36.7

            R2                38    1.       0.212          24.6      LOS C             0.7            5.1    0.83    0.96    36.7

                              53    1.0      0.212          24.6      LOS C             0.7            5.1    0.83    0.96    36.7


 All Vehicles            1351       1.0      0.364           1.5          NA            0.7            5.1    0.04    0.08    57.8



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 4:50:36 PM           Copyright @ 2000-2013 Akcelik and Associates Pty LId
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com
                                                                                                              SIDRA
Project: P:12011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIDavid Low Way   -
                                                                                           Woodland Dr.sip6   INTERSEtTlON 6
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC

Page 40

-   -




        MOVEMENT SUMMARY
        Site: 2025 SAT Post Develo~ment
        12-060 Peregian Beach SC
        David Low Way I Woodland Drive
        2015 SAT Pre Development
        Giveway I Yield (Two-Way)


                                                                                                                                            -
                                                                                                                                -

                                                                            -   --~-
                         -




         Movement Performance              -   Vehicles
        1M                                            Average.:~f~~evel,2ti.,~,95% RA,:;~:’nfjaUe~~’" ~~JR~?r:"
                                                                                                             ~{t
              ~:;~IOD..j~~i!~~De:ciaralF.IOW5.~g~t~f.JDel~yBk
        .~’i\!.t ~2V,~.~otal.~~v
        ~J~:~~   ~_     eh/h~  %                            v/c
                                                                                                                ~.~f!tf~tig~~1~eed
                                                                ".JS~~!IC~~Vehl~~e:~~^.~f~~~tan-~~4_Q~~Ued ~Sto!iliia!e"
                                                                    _se~~~~~M’J; B~vehl];:}i L~~m
                                                                                                                               yt:!>~~!’~
                                                                                                                             ~i:l~ erveh’
                                                                                                                           ~,4                  1iflkml
         South: David Low Way’ South
                                 -




         1          L2                95          1.0     0.398           1.2      LOS A             0.0            0.0      0.00    0.15          58.2

         2          T1               672          1.0     0.398           1.2      LOS A             0.0            0.0      0.00    0.15          58.2

         3u          U                17          1.0     0.017          13.7      LOS B             0.1            0.5      0.53    0.74          44.5

         Approach                    783          1.0     0.398           1.5          NA            0.1            0.5      0.01    0.17          57.8


         North: David Low Way’   -
                                     North

         8          T1               571          1.0     0.294           0.0      LOS A             0.0            0.0      0.00    0.00          59.9

         9          R2                64          1.0     0.090          14.0      LOS B             0.3            2.4      0.62    0.87          44.2

         9u          U                 1          1.0     0.090          14.0      LOS B             0.3            2.4      0.62    0.87          44.2

         Approach                    636          1.0     0.294           1.5          NA            0.3            2.4      0.06    0.09          57.8


         West: Woodfand Drive    -   West

         10         L2                79          1.0     0.681          37.9      LOS E                3.7        26.3      0.90    1.17          30.2

         12         R2                95          1.0     0.681          37.9      LOS E                3.7        26.3      0.90    1.17          30.2

         Approach                    174          1.0     0.681          37.9      LOS E                3.7        26.3      0.90    1.17          30.2


         All Vehicles            1593              1.0    0.681           5.5          NA               3.7        26.3      0.13    0.24          52.6



        Level of Service (LOS)Method: Delay (HCM 2000).
        Vehicle movement LOS values are based on average delay per movement
        Minor Road Approach LOS values are based on average delay for all vehicle movements.
        NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since th e average delay is not a
        good LOS measure due.to zero delays associated with major road movements.
        SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

        Gap-Acceptance Capacity: SIDRA Standard (Ak lik M3D).
        HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




        Processed: Tuesday, 14 May 2013 4:50:37 PM                Copyright @ 2000-2013 Akcelik and Associates Pty Ltd
        SIDRA INTERSECTION 6_0_2.3730                             www.sidrasolutions.com
        Project: P:\2011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\David Low Way
        8000122,ADAM PEKOL CONSULTING, PLUS I 1 PC
                                                                                                    -
                                                                                                        Woodland Dr_sip6     m~r~asEtTn~)N ~

Page 41

MOVEMENT SUMMARY
Site: 2013 PM Existing Conditions

12-060 Perigian Beach
Woodlland Drive I Rufous Street
2013 PM Existing Conditions
Giveway I Yield (Two-Way)




                                   1.0       0.047          10.7      LOS B            0.2           1.3

            R2                     1.0       0.047          10.7      LOS B            0.2           1.3

                             37    1.0       0.047          10.7      LOS B            0.2           1.3

       Woodland,Drive   -
                            East

 4          L2               35    1.0       0.041           4.3      LOSA             0.0           0.0   0.00     0.43      54.1

 5          T1               42    1.0       0.041           4.3      LOSA             0.0           0.0   0.00     0.43      54.1

 Approach                    77    1.0       0.041           4.3         NA            0.0           0.0   0.00     0.43      54.1

 West: Woodland Drive   -
                            West
 11         T1               37    1.0       0.021           0.8      LOSA             0.1           0.8   0.17     0.07      55.7

 12         R2                2    1.0       O.              0.8      LOSA             0.1

 Approach                    39    1.0       0.021           0.8         NA            0.1           0.8   0.17     0.07      55.7


 All Vehicles               153    1.0       0.047           4.9         NA            0.2           1.3   0.10     0.39      52.6



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 20134:44:14 PM            Copyright@ 2000-2013Akcelik and Associates Ply Ltd
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com                                SIDRA
Project: P:12011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIWoodland Dr- Rufous St.sip6         INT"ERSE’CTION 6
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC

Page 42

--




     MOVEMENT SUMMARy
     Site: 2015 PM Pre Dev
     12-060 Perigian Beach
     Woodland Drive I Rufous Street
     2015 PM Pre Development
     Giveway I Yield (Two-Way)


                                                                                                                                            --
                                                                                        -                      -   -
                                                     -
                         -




      Movement Performance                   -   Vehicles
                                          andtF,I
                       WS~~i~ltQ_~g:I,~Av~rag~.’                   jf,Q eu~        ’~~~ ...!~6i~~                                    ~                            t’V

     lMo~_en
     ~     ifotalli"t’HV’’’’~ r~Sat’i4~~tigela~:\i:; ’)Le;~lEr8~,1k
                                                            ~  .!~sJi~~~    Pzr~PD’
                                                                            u~~     St9.p,.I3?te..>>"1~peed9~~’
                                                                                                ~e                                   f!if
                  .I~%~~~               h/l                 iJ,.>f~/c .’,fr,.~,trsec’       .
                                                                                                              ’l>veh            m~~~                     ~ er veh~~’km/h
      S.9uth: RufQ!.ls Street   -   South

      1            L2                    2          1.0         0.047          10.7             LOSS            0.2            1.3          0.25                  0.67           47.1

      3            R2                   35          1.0         0.047          10.7             LOS S           0.2            1.3          0.25                  0.67           47.1

      Approach                          37          1.0         0.047          10.7             LOS S           0.2            1.3          0.25                  0.67           47.1


      East: Woodland Drive      -   East

      4            L2                   35          1.0         0.041           4.2             LOSA            0.0            0.0          0.00                  0.42           54.2

      5            T1                   43          1.0         0.041           4.2             LOSA            0.0            0.0          0.00                  0.42           54.2

      Approach                          78          1.0         0.041           4.2                  NA         0.0            0.0          0.00                  0.42           54.2


     :"West::_Woo lano Drive West   -




      11           T1                   38          1.0         0.021           0.8             LOS A           0.1            0.8          0.17                  0.07           55.7

      12           R2                    2          1.0         0.021           0.8             LOSA            0.1            0.8          0.17                  0.07           55.7

      Approach                          40           1.0        0.021           0.8                  NA         0.1            0.8          0.17                  0.07           55.7



      All Vehicles                      155          1.0        0.047           4.9                  NA         0.2            1.3          0.10                  0.39           52.7



     Level of Service (LOS)Method: Delay (HCM 2000).
     Vehicle movement LOS values are based on average delay per movement
     Minor Road Approach LOS values are based on average delay for all vehicle movements.
     NA: Intersection LOS and Major Road Ap proach LOS values are Not Applicable for !:wo-way sign control since the average delay is not a
     good LOS measure due to zero delays associated with major road movements.
     SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

     Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
     HV (%)values are calculated for All Movemen! Classes of All Heavy Vehicle Model Designation.




     Processed: Tuesday, 14 May 2013 4:43:48 PM                         Copyright @ 2000-2013 Akcelik and Associates Pty Ltd

                                                                                                                                            ’ ’R:!1       A
                                                                                                                                                ’’

     SIDRA INTERSECTION 6.0.2.3730                                      www.sidrasolutions.com
     Project:   P:\2011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\Woodland Dr                 -   Rufous St.sip6                N>1~       ’.’
                                                                                                                                                          ’




                                                                                                                                                      ,___-’""-    _-
                                                                                                                                                                        ’.   .




                                                                                                                                                                              N
                                                                                                                                                                         ’IS’",6 ,
                                                                                                                                                                                     ....


     8000122,ADAM PEKOL CONSULTING, PLUS 11PC

Page 43

MOVEMENT SUMMARY
Site: 2015 PM Post Dev

12-060 Perigian Beach
Woodland Drive I Rufous Street
2015 PM Post Development
Giveway I Yield (Two-Way)




                                   1.0       0.201          11.6      LOS B               0.9             6.1

            R2                                               1.6      LOS B               0.9             6.1

                            145    1.0       0.201          11.6      LOS B               0.9             6.1

      Woodland Drive   -   East

 4          L2              138    1.0       0.097           7.2      LOSA                0.0             0.0   0.00    0.60   50.7

 5          T1              43     1.0       0.097           7.2      LOSA                0.0             0.0   0.00    0.60   50.7

 Approach                   181    1.0       0.097           7.2         NA               0.0             0.0   0.00    0.60   50.7

 West: Woodland Drive   -
                            West

 11

 12

 Approach

 All Vehicles               372    1.0       0.201           8.3         NA               0.9             6.1   0.18    0.59



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 2:28:43 PM           Copyright @ 2000-2013 Ak   lik and Associates Pty LId
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com                                     SIDRA
Project: P:12011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIWoodland Dr   -
                                                                                         Rufous St.sip6         INTERsetTloN 6
8000122,ADAM PEKOL CONSULTING, PLUS 11PC

Page 44

MOVEMENT SUMMARY
Site: 2025 PM Pre Dev
12-060 Perigian Beach
Woodland Drive I Rufous Street
2025 PM Pre Development
Giveway I Yield (Two-Way)




                                   1.0       0.048                                                                                 47.0

                                   1.0       0.048          10.9      LOS B               0.2             1.3   0.27      0.67     47.0




                                   1.0       0.045           3.8      LOSA                0.0             0.0   0.00      0.39     54.7

                                                             3.8      LOS A               0.0             0.0   0.00      0.39     54.7

                                   1.0       0.045           3.8          NA              0.0             0.0   0.00      0.39     54.7




 11         T1            45       1.0       0.025           0.8      LOSA                0.1             1.0   0.18      0.06     55.5

 12         R2             2       1.0       0.025           0.8      LOSA                                                0.06     55.5

 Approach                 47       1.0       0.025           0.8          NA              0.1             1.0   0.18      0.06     55.5


 All Vehicles            171       1.0       0.048           4.5          NA              0.2             1.3   0.11      0.36     53.1



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




                                                     Copyright @ 2000-2013 Akcelik and Associates Ply ltd
Processed: Tuesday, 14 May 2013 2:28:44 PM
                                                                                                                gJfllB’
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com
Project: P:\2011-12\12-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIWoodland Dr
8000122,ADAM PEKOL CONSULTING, PLUS / 1 PC
                                                                                     -
                                                                                         Rufous St.sip6         lNfE~            jPN &.

Page 45

MOVEMENT SUMMARY
Site: 2025 PM Post Dev

12-060 Perigian Beach
Woodland Drive I Rufous Street
2025 PM Post Development
Giveway I Yield (Two-Way)




            L2                7    1.0       0.206          11.8      LOS B               0.9             6.3   0.38    0.72   46.1

 3          R2              138    1.0       0.206          11.8      LOS B               0.9             6.3   0.38    0.72   46.1

 Approach                   145    1.0       0.206          11.8      LOS B               0.9             6.3   0.38    0.72   46.1

 East: Woodland Drive   -
                            East

 4          L2              138    1.0       0.101           6.9      LOSA                0.0             0.0   0.00    0.58   51.1

 5          T1               52    1.0       0.101           6.9      LOS                 0.0                           0.58   51.1

 Approach                   189    1.0       0.101           6.9          NA              0.0             0.0   0.00    0.58   51.1

 West: Woodland Drive   -   West

 11         T1               45    1.0       0.030           2.1      LOSA                0.2             1.2   0.29    0.15   52.8

 12         R2                7    1.0       0.030           2.1      LOSA                0.2             1.2   0.29    0.15   52.8

 Approach                    53    1.0       0.030           2.1          NA              0.2             1.2   0.29    0.15   52.8


 All Vehicles               387    1.0       0.206           8.1          NA              0.9             6.3   0.18    0.58   49.3



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 2:28:44 PM           Copyright@ 2000-2013 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com                                     SIDRA
Project: P:12011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\Woodland Dr   -
                                                                                         Rufous St.sip6         INT-ERSE’CTION 6
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC

Page 46

    MOVEMENT SUMMARY
    Site: 2013 SAT Existing Conditions
    12-060 Perigian Beach
Woodland Drive I Rufous Street
    2013 SAT Existing Conditions
    Giveway I Yield (Two-Way)


                                                                                                                                         -   -
                                                                                             -       -   --
                                                           -
                                  -




I
     Movement Performance                   -
                                                Vehicles

                                                        _o!!’,,;95%’~B~~~               ~~Qel
                                                                          ’:"~:BJijf.’rOp’:~.~i                     of Qu   u.e
                                               ay~service _les’~r.y!Dlstance ~QLleued ’~ EffeClIye.);t!f’verag~
    ~
    MOV~!.iIP..~~l,:~;t~~~p mana’FIOWS.q~g.ge’:t1!J
    _            ovr.? ,;’ ’~ii’Total
                 ~~~’
                    ~~~-h/h
                                                   HV,
                                                    %
                                                               Sail;
                                                               ~-t’’’                   ~Si~    Rate’,,~peed,                       ,]

                                                                                                              ’.hq<i’~~." "~f~ ~...t~ ~i
                                                                                                                                                    Stop
                                                                                                                                                             t    ,
                                                                                                                                                                      tikm/h


     1           L2                     2          1.0         0.047           10.7      LOS B                0.2             1.3            0.24          0.67         47.1

     3           R2                    35          1.0         0.047           10,7      LOS B                0.2             1.3            0.24          0.67         47.1

     Approach                          37          1.0         0.047           10,7      LOS B                0.2             1.3            0.24          0.67         47.1


    :East: Woodland Drive     -
                                  East
     4           L2                    35          1.0         0.035            5.0      LOSA                 0.0            0.0             0.00          0.48         53.2

     5           T1                    31          1.0         0.035            5.0      LOSA                 0.0            0.0             0.00          0.48         53.2

     Approach                          65          1.0         0.035            5.0          NA               0.0            0.0             0.00          0.48         53.2


     \f!fst: W      lim   Drive   -
                                      West
     11          T1                    53          1.0         0.029            0.6      LOSA                 0.2             1.1            0.16          0.05         56.1

     12          R2                     2          1.0         0.029            0.6      LOSA                 0.2             1.1            0.16          0.05         56.1

     Approach                          55          1.0         0.029            0.6          NA               0.2             1.1            0.16          0.05         56.1


     All Vehicles                     157          1.0         0.047            4.8          NA               0.2             1.3            0.11          0.37         52.6



    Level of Service (LOS)Method: Delay (HCM 2000).
    Vehicle movement LOS values are based on average delay per movement
    Minor Road Approach LOS values are based on average delay for all vehicle movements.
    NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
    good LOS measure due to zero delays associated with major road movements.
    SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

    Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
    HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




    Processed: Tuesday, 14 May 2013 2:28:45 PM                          Copyright @ 2000-2013 Akcelik and Associates Pty LId                 .;
                                                                                                                                              DJt~
    SIDRA INTERSECTION 6.0.2.3730                                       www.sidrasolutions.com
    Project: P:12011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRAIWoodland Dr Rufous St.sip6
    8000122,ADAM PEKOL CONSULTING, PLUS /1 PC
                                                                                                         -                                   OOr~i~mfl’N :6

Page 47

MOVEMENT SUMMARY
Site: 2015 SAT Pre Dev

12-060 Perigian Beach
Woodland Drive I Rufous Street
2015 SAT Pre Development
Giveway I Yield (Two-Way)




                                   1.0       0.047          10.8      LOS B             0.2           1.3   0.25    0.67      47.1

                             35    1.0       0.047          10.8      LOS B             0.2           1.3   0.25    0.67      47.1

                             37    1.0       0.047          10.8      LOS B             0.2           1.3   0.25    0.67      47.1

      Woodland Drive   -   East

            L2               35    1.0       0.035           5.0       LOSA             0.0           0.0   0.00    0.47      53.3

            T1                                                                          0.0           0.0

 Approach                    66    1.0       0.035           5.0          NA            0.0           0.0   0.00    0.47      53.3

 West.:._WooOnd Drive   -   W st
 11         T1               55    1.0       0.030           0.6       LOSA             0.2           1.2   0.16    0.05      56.1

 12         R2               2     1.0       0.030           0.6       LOSA             0.2           1.2   0.16    0.05      56.1

 Approach                    57    1.0       0.030           0.6          NA            0.2           1.2   0.16    0.05      56.1


 All Vehicles               160    1.0       0.047           4.8          NA            0.2           1.3   0.11    0.37      52.7



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 2:28:45 PM           Copyright @ 2000-2013 Akcelik and Associates Ply LId
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com                                 SIDRA
Project: P:12011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\Woodland Dr- Rufous St.sip6          INTERSEtTION 6.
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC

Page 48

’_




                                                                                                                                                   ,




                                                                                                                                                          .




         MOVEMENT SUMMARY
         Site: 2015 SAT Post Dev

         12-060 Perigian Beach
     Woodland Drive I Rufous Street
     2015 SAT Post Development
         Giveway I Yield (Two-Way)


                                                                                                                                      -

                                                                                    -
                                                        --
                              -            _
         -




     I

     I
          Movement Performance                 -   Vehicles
                                                                                                                                                         ctl~e
         fMOV~~09.~ii’\iD~~ d F.IOWs~4t~ADeg’~~J~Av’erage,1,~L                                                            f.’QI,l
         ~ ov;;:-;~~1otal.V~__;~~t!\
          ~~~<<tic eh/h1
                                      ,~~’9"~lay.;~,(~:Service h "yehi.fJE?~ilal~!s\aD
                                  v/c,.Ii’’’’’.~~;ft"sec~’’’:~~~ ~4~i:veh
                                                       %.,l,j;"",,1
                                                                                       ~.
                                                                               ~~Sf~i"ltm{
                                                                                                vel,OfJi95%’8~.<?~; Yit\:.,()_P;~\~Eff ~f.verag-~-
                                                                                                                                          ueued~i!/~~t.?p_l3at
                                                                                                                                          ~1t~ er veh".,w 1"ikm/
                                                                                                                                                                  J~p-~~g
                                                                                                                                                                 ,:



          South: Rufous Street   -
                                     South

          1          L2                   8           1.0             0.233             11.8   LOS B               1.0              7.3     0.39          0.72        46.0

          3          R2                  156          1.0             0.233             11.8   LOS B               1.0              7.3     0.39          0.72        46.0

          Approach                       164          1.0             0.233             11.8   LOS B               1.0              7.3     0.39          0.72        46.0


         ~ t: W oalana Drive      -   East

          4          L2                  156          1.0             0.101             7.9    LOS A               0.0              0.0     0.00          0.63        50.0

          5          T1                   32          1.0             0.101             7.9    LOS A               0.0              0.0     0.00          0.63        50.0

          Approach                       187          1.0             0.101             7.9        NA              0.0              0.0     0.00          0.63        50.0


          West: Woodland Drive       -
                                         West

          11         T1                   55          1.0             0.036             2.1    LOS A               0.2              1.5     0.29          0.15        52.8

          12         R2                    8           1.0            0.036             2.1    LOS A               0.2              1.5     0.29          0.15        52.8

          Approach                        63           1.0            0.036             2.1        NA              0.2              1.5     0.29          0.15        52.8



          All Vehicles                   415           1.0            0.233             8.6        NA              1.0              7.3     0.20          0.59        48.8



         Level of Service (LOS)Method: Delay (HCM 2000).
         Vehicle movement LOS values are based on average delay per movement
         Minor Road Approach LOS values are based on average delay for all vehicle movements.
         NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for W-Io-way sign control since the average delaY is not a
         good LOS measure due to zero delays associated with major road movements.
         SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

         Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
         HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




         Processed: Tuesday, 14 May 2013 2:28:46 PM                           Copyright @ 2000-2013 Akcelik and Associates Pty lid
         SIDRA INTERSECTION 6.0.2.3730                                        www,sidrasolutions.com
         Project: P:12011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\Woodland Dr
         8000122,ADAM PEKOL CONSULTING, PLUS /1 PC
                                                                                                              -
                                                                                                                  Rufous St.sip6           m~~EtTlfJN&.

Page 49

MOVEMENT SUMMARY
Site: 2025 SAT Pre Dev

12-060 Perigian Beach
Woodland Drive I Rufous Street
2025 SAT Pre Development
Giveway I Yield (Two-Way)




                                   1.0       0.048          10.9      LOS B               0.2             1.3   0.27    0.68   46.9

            R2                                                        LOS B               0.2             1.3   0.27    0.68   46.9

 Approach                    37    1.0       0.048          10.9      LOS B                0.2            1.3   0.27    0.68   46.9

 East: Wo       and D   -   East

 4          L2               35    1.0       0.038           4.5       LOSA               0.0             0.0   0.00    0.44   53.8

 5          T1               38    1.0       0.038           4.5       LOSA               0.0             0.0   0.00    0.44   53.8

 Approach                    73    1.0       0.038           4.5          NA              0.0             0.0   0.00    0.44   53.8

 West: Woodland Drive   -   West

 11         T1               65    1.0       0.035           0.6       LOSA               0.2             1.4   0.17    0.04   56.0

 12         R2                2                                                           0.2                   0.17    0.04   56.0

 Approach                    67    1.0       0.035           0.6          NA              0.2             1.4   0.17    0.04   56.0


 All Vehicles               177    1.0       0.048           4.4          NA              0.2             1.4   0.12    0.34   53.0



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak lik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 2:28:46 PM           Copyright @ 2000-2013 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com                                     SIDRA
Project: P:12011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\Woodland Dr   -
                                                                                         Rufous St.sip6         INTERSEtTION 6
8000122,ADAM PEKOL CONSULTING, PLUS 11PC

Page 50

MOVEMENT SUMMARY
Site: 2025 SAT Post Dev
12-060 Perigian Beach
Woodland Drive I Rufous Street
2025 SAT Post Development
Giveway I Yield (Two-Way)




                                             0.239          12.1      LOS                                 7.4   0.41          45.8

                                   1.0       0.239          12.1      LOS B               1.1             7.4   0.41   0.73   45.8




                                   1.0       0.104           7.6      LOSA                0.0             0.0   0.00   0.62   50.3

                                   1.0       0.104           7        LOS A               0.0             0.0   0.00

                                   1.0       0.104           7.6          NA              0.0             0.0   0.00   0.62   50.3




                                   1.0       0.041           1.9      LOSA                0.2             1.7   0.30   0.13   52.8

                           8       1.0       0.041           1.9      LOSA                                 7    0.30   0.13   52.8

 Approach                 74       1.0       0.041           1.9          NA              0.2             1.7   0.30   0.13   52.8


 All Vehicles            432       1.0       0.239           8.3          NA              1.1             7.4   0.21   0.58   48.9



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 2:28:47 PM           Copyright @ 2000-2013 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com
Project: P:12011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIWoodland Dr
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC
                                                                                     -
                                                                                         Rufous St.sip6         ’~JlaSBtTJaN6.

Page 51

 P’/20-1l6
                 PERGIAN
                    BEACH

SC/REPOTIl2-06
                 PERGIAN
                    TlA


                   REVISON
                     A.DOCX


[OCR of page images]
 

PEKOL TRAFFIC & TRANSPORT

APPENDIX ¢€
SITE LAYOUT

P:|2011-12\12-060 PEREGIAN BEACH SC\REPORTS\ 12-060 PEREGIAN TIA REVISION A.DOCX

Page 52

                    "                                      ..
              ,,>                                     ~+
                             o.




    JJ..                                                                                             .......




   cr"                            LOT 1
                                  ON $P 215942
                                                                ....   >,’




                                                                ffi";/D"’
w




                                                                .W
>
                                   """"""’""HOUSE
                                                                                               .’,
r::t::                             FACIUTY BUILDING
                                                                    ~9U5’
                                                                             PUBLIC CAR PARK
o
         ,+

o

z

<C




o
~                                                                                                                    <]EXlSllNG
                                                                                                                              ESIOENTlAl
                                                                                                                              DWELUNG




                                                                                                                    ’i~,:.’




                        l~


                                                                                                               EXlSTlNG reNNIS COURTS

Page 53

P.120/-J(}6{
                          PERGIAN
                             BFA




      CHSlREPOTIJ2-(}6{
                          PERGIAN
                              nA


                            REVISON
                              A.DOCX


[OCR of page images]
 

PEKOL TRAFFIC & TRANSPORT

APPENDIX D
RETAIL PARKING DEMAND DATA

P:|2011-12\12-060 PEREGIAN BFA CH SC\REPORTS\12-060 PEREGIAN TIA REVISION A.DOCX

Page 54

I
    APPEAL NO 1786 of 2012

    ANALYSIS OF TIM PARKING DATA                                                                                                                                                                                                     PII
                                                                                                                                                                                                                                     ’11C01. flA"IC & TtANSro.’



    1. TIM Provided data for 31 sites, with 45 days of survey data (some sites were surveyed on multiple days).

    2. The peak rate for sites with a valid survey date are listed in Table 1.

    3. The seasonal adjustment factors listed in Table 2 were used to factor up slow trading months and factor down busy months.

    4. Sites with very low adjusted demand rates were considered outliers and were excluded from subsequent analysis.

    5. When the resultant data is plotted (see below) it indicates that:

     a. the   peak perking demand rate decreases slowly as store size increases
     b. the peak parking demand rate for a 5,671m2 GFA store would be in the order of 5.03 spaces /100m2 (ie 286 spaces)


    TABLE 1: CAR PARKING SURVEY DATA                                                                                                                                           TABLE 2: SEASONAL ADJUSTMENT FACTORS



                                                                               Peak Demand    Raw Rate                   Seasonal   100 /Seasonal   Adjusted Rate
     Site   Location                                               Size (m2)      (cars)     (cars/100m2) Survey Month    Factor       Factor       (cars/100m2)    Comment    Month              PPT(1)
      1     Alderley Shopping Centre South Pine
                                            -
                                                                    2776           109          3.93          Feb          89           1.12            4.41                   Jan                   96

            Road, Alderlev
      2     Walkerston Village Shopping Centre-                     3190           140          4.39          Mar          84           1.19            5.22                   Feb                   89

            Peak Downs
      3     Woolworths Andergrove          -   Oak .5treet,         3344           144          4.31          Jun          85           1.18            5.07                   Mar                   84

            Andergrove
      9     Victoria Point Town Centre (south                       4800           230          4.79          Feb          89           1.12            5.38                   Apr                   85

            section Woolworths)
      12    Nambour Plaza                                           5000           194          3.88          Dec          100          1.00            3.88         Outlier   May                   85



      13    Paddington Central Shopping Centre                      5200           157          3.02          May           85          1.18            3.55         Outlier   Jun                   85



      14    Albany Creek Market Place           -
                                                    Cnr Old         5424           154          2.84          Mar           84          1.19            3.38         Outlier   Jul                   92

            Northern Road
      16    Bribie Island Shopping Centre               -
                                                            Cnr     6150           280          4.55          Feb           89          1.12            5.12                   Aug                   92

            Goodwin Drive &
      18    Bellbowrie Plaza     -
                                     Cnr Moggill Road               7651           163          2.13          Aug           92          1.09            2.32         Outlier   Sep                   90

            and Birkin Rd,
      20    Kenmore Plaza    -

                                 Moggill Road,                      7931           344          4.34          Jul           92          1.09            4.71                   Oet                   89

            Kenmore
      22    Albany Village                                          8500           382          4.49          Jun           85          1.18            5.29                   Nov                   82



      23    Kenmore Plaza    -

                                 Moggill Road,                      8700           389          4.47          Nov           82          1.22            5.45                   Dee                   100

            Kenmore
                                                                                                2.60                        85          1.18            3.06         Outlier   11) PTT: http://www.ptt.com.au/wp-<ontent!uploads/2012/10/PN_Regional-Shopplng-
      25    Whitsunday Shopping Centre                  -
                                                            Cnr     9252           241                        Apr
                                                                                                                                                                               Centre-Operational-Characterislics,pdf
            Shute Harbour
      26    Bribie Island Shopping Centre               -
                                                            Cnr     10000          392          3.92          Aug           92          1.09            4.26
                                                                                                                                                                                           6.0
            Goodwin Drive &                                                                                                                                                     --
                                                                                                                                                                                 ~
                                                                                                                                                                                                           ......
                                                                                                                                                                                                           .            ~      .
      27    Sunny Park Shopping Centre              -
                                                        Cnr         10655          510          4.79          Oet           89          1.12            5.38                               5.0                                 _   --



                                                                                                                                                                                 ~                        .
                                                                                                                                                                                                                        .
                                                                                                                                                                                                                             ..
                                                                                                                                                                                                                                        ----.
            Mains Road and
                                                                                                                                                                                ]:         4.0
      28    Mt Gravatt Shopping Centre                              12400          571          4.60           Jul          92          1.09            5.01
                                                                                                                                                                                 ~~
                                                                                                                                                                                 ’"        3.0
                                                                                                                                                                                       E
                                                                                                                                                                                 "’0
      29    Logan Central Shopping Centre                           15000          306           2.04         Dee          100          1.00            2.04         Outlier     bOO
                                                                                                                                                                                 c:...     2.0

                                                                                                                                                                                 ~         1.0
                                                                                                                                                                                 0..
      30    Bay Central Shopping Centre Hervey      -
                                                                    15821          773           4.89         Dee          100          1.00            4.89                     -’"
                                                                                                                                                                                  ’"
                                                                                                                                                                                 dO        0.0
            Bay                                                                                                                                                                  0..

      31    Pialba Plaee Shopping Centre                -
                                                            Main    16511          736           4.46         Dee          100          1.00            4.46                                     0            5000         10000          15000           20000
                                                                                                                                                                                                                         Size (m2)
            Street Pialba

Page 55

 

PEKOL TRAFFIC & TRANSPORT

APPENDIX E
TURNING COUNTS

P:12011-12\ 12-060 PFREGIAN BEACH SC\REPORTS\12-060 PEREGIAN TIA REVISION A.DOCX

Page 56

12-060 Peregian
Traffic Volumes


12013 PM Peak Hour Existing Conditions



                                            David Low Way

       41
       >                          U-Turn           Right        Through
       Oi:
       C                              2       I     13      I    411
                   Left I    5
       ~
                  Right I    30
       ~                             27       I     479 I     16
       o
       o
                                     Left         Through U-Turn
       ;::
                                            David Low Way


12015 PM Peak Hour mevelop.,ment




                                            David Low Way


       ~                           U-Turn          Right        Through
       Oi:
       C                              2       I     13      I     426
                   Left I    5
       ~
       0>         Right I    30
       "tS
        o
                                     28       I    496      I     17
                                     Left         Through       U-Turn
       ~
                                            David Low Way




12025 PM Peak Hour Pre-DeveloJ?ment




                                            David Low-Way


        ~                           U-Turn         Right        Through
       Oi:
       C                              2       I     16      I     506
                    Left I   5
       ~
                  Right I    30
       ~                             33       I     590     I     20
        o
                                     Left                       U-Turn
       ~                                          Through

                                            David Low Way

Page 57

Development



                                         David Low Way

       III
       >                         U-Turn         Right        Through
      Oi:
      Q                            0             46             0
       ~
       III
      0:;
      "’C
       0
       0
                 Left
                Right   I
                            52
                            46
                                  52
                                  Left
                                           : :    0
                                               Through
                                                                0
                                                             U-Turn
      ~
                                         David Low Way




20l5 PM Peak Hour Post-Development




                                         David Low Way

       III
       >                         U-Turn         Right        Through
      Oi:
      Q                            2       I     60      1    426
                 Left I     57
       ~
      0:;       Right I     76
      "’C
       o
                                  79       I    496      I     17
       o
                                  Left         Through       U-Turn
      ~
                                         David Low Way




[2025 PM Peak Hour Post-Development


                                         David Low Way

       III
       >
      Oi:
                                 U-Turn         Right        Through
      Q                            2       I     62      I    506
                 Left I     57
       ~
      0:;       Right I     76
      "’C
       o
                                  85       I    590      I     20
       o
                                  Left         Through       U-Turn
      ~

                                         David Low Way

Page 58

12-060 Peregian
Traffic Volumes


I23SAT Peak Hour Existing Conditions


                                           David Low Way

       GI
        >                        U-Turn           Right        Through
       Oi:
       C                             1       I     5       I     440
                   Left I   14
       ~
       ii:        RightI    36
       "0
       o
                                    24       I    518      I      13
       o
                                    Left         Through       U-Turn
       ~
                                           David Low Way


f20J5 SAT Peak Hour Pre-Develop"ment




                                           David Low Way

       GI
       >                          U-Turn          Right         Through
       Oi:
       C                             1       I      5      I      456
                   Left I   14
       ~
       oS;        Right I   36
       "0
       o
                                    25       I    536      I      13
       o
                                    Left         Through        U-Turn
       ~
                                           David Low Way




12025 SAT Peak Hour Pre~Develol?ment



                                           David Low Way

       GI
       >                          U-Turn          Right         Through
       Oi:
       C                             1       I      6      I      542
                   Left I   14
        ~
       oS;        Right I   36
       "0
        o
                                    30       I     638     I       16
        o
                                    Left         Through        U-Turn
       ~
                                           David Low Way

Page 59

Development




                                        David Low Way

       GI
       >
      Oi:
                                U-Turn         Right        Through
      Q                           0             54            0
      ~
       GI
      os:
      "tJ
       0
       0
                Left
               Right   I
                           61
                           54
                                 61
                                 Left
                                          : :    0
                                              Through
                                                               0
                                                            U-Turn
      ==

                                        David Low Way




2015 SAT Peak Hour Post-Development




                                        David Low Way


      ~                         U-Turn         Right        Through
      Oi:
      Q                           1       I     60      I    456
                Left I     75
      ~
      os:      Right I     90
      "tJ
       o
                                 85       I    536      I     13
       o
                                 Left         Through       U-Turn
      ==

                                        David Low Way




2025 SAT Peak Hour Post-Development




                                        David Low Way

      GI
      >
      Oi:
                                U-Turn         Right        Through
      Q                           1       I     61      I    542
                Left I     75
      ~
      os:      Right I     90
      "tJ
       o
                                 90       I    638      I     16
       o
                                 Left         Through       U-Turn
      ==

                                        David Low Way

Page 60

12-060 Peregian
Traffic Volumes


120J 3 PM Peak Hour Existing Conditions    ]




        41
        >
                                                                        ~
                                                                        0
       .i:                                                              0
       Q                                                                a.
                                                                        <
        ~
       .>
              Throughl
                 Right
                          35
                           2
                                                       40
                                                       33   IThrough
                                                                Left    ~.
       "’C                                                              C
        0
                                     2          33
                                                                        ~
        0                                                               .;:
                                    Left       Right
       :t                                                               CD


                                    Rufous Street


~20 J 5 PM Peak Hour Pre-Development :oJ




        41
        >
                                                                        ~
                                                                        0
       .i:                                                              0
       Q                                                                a.
                                                                        <
                          36                           41       Right
        ~
        41
       .>
              Throughl
                 Right     2                           33   I   Left
                                                                        j
                                                                        ~
                                                                             .




       "’C                                                              C
        0
                                     2          33
                                                                        ~
        0                                                               :c-
                                    Left       Right
       :t                                                               CD


                                    Rufous Street




(2025 PM Peak Hour Pre-Develop-ment :J




        41
        >
                                                                        ~
                                                                        0
       .i:                                                              0
       Q                                                                a.
                                                                        <
                          43                           49
        ~
       .>
              Throughl
                 Right     2                           33   IRi9ht
                                                                Left    ~.
       "’C                                                              C
        0
                                     2          33
                                                                        ~
                                                                             .
        0                                                               :
                                    Left       Right
       ~                                                                CD


                                    Rufous Street

Page 61

Development




       CII                                                         :IE
       >
                                                                   0
      0;:
                                                                   0
      0                                                            c.
       ~                 0                          0              ~o
       CII
      oS;
      "C
              Throughl
                 Right   5                          98    IRi9ht
                                                          Left     ~
                                  5          98                    C
       0                                                           ""I
       0
                                 Left       Right                  :co
      ==                                                           ID


                                 Rufous Street



20 J 5 PM Peak Hour Post-Development    ~




       CII
       >
                                                                   :IE
                                                                   0
      0;:
                                                                   0
      0                                                            c.
       ~                 36                         41             ~o
       CII
      oS;
      "C
              Throughl
                 Right   7                          131   IRi9ht
                                                          Left
                                                                   ID
                                                                   ~
                                  7         131                    C
       0                                                           ""I
       0
                                 Left       Right                  :co
      ==                                                           ID


                                 Rufous Street




2025 PM Peak Hour Post-Development      ]




       CII
       >
                                                                   :IE
                                                                   0
      0;:
                                                                   0
      0                                                            c.
       ~                 43                         49             ~o
       CII
      oS;
      "C
              Throughl
                 Right   7                          131   IRi9ht
                                                           Left
                                                                   ID
                                                                   ~
                                  7         131                    C
       0                                                           ""I
       0
                                 Left       Right                  :co
      ==                                                           ID


                                 Rufous Street




      -

Page 62

                                                                        ~...’..~

                                                                              ~




12-060 Peregian
Traffic Volumes


120’3 SAT Peak Hour Existing Conditi~




       Q)
       >
                                                                  ~
                                                                  0
       .C                                                         0
       Q                                                          a.
                                                                  <
       ;:
        Q)
      .S;:
              Throughl
                 Right
                         50
                         2
                                                  29
                                                  33   IThrough
                                                       Left       ~.
      "’D                                                         c
        0
                                  2        33
                                                                  "’l

                                 Left     Right                   <.
       ~                                                          I


                                 Rufous Street


!20’5SAT Peak Hour Pre-Develop"ment




       >
        Q)                                                        ~
                                                                  0
       .C                                                         0
       Q                                                          a.
                                                                  <
                         52                       30
        ;:
        Q)
       .S;:
              ThrOughl
                 Right   2                        33   IRi9ht
                                                       Left
                                                                  ;.
                                                                  ~
       "’D                                                        C
        0
                                  2        33
                                                                  "’l

                                 Left     Right                   <.
       ~                                                          I


                                 Rufous Street



12025 SAT Peak Hour Pre-Develop"ment




        Q)                                                        ~
       .2:                                                        0
        ..                                                        0
       Q                                                          a.
                         62                       36              ~.
        ;:
        Q)
       .S;:
              Throughl
                 Right   2                        33   IRi9ht
                                                        Left
                                                                  I
                                                                  ~
       "’D                                                        c
        0
                                  2        33
                                                                  "’l
        0                                                         <.
                                 Left     Right
       :r.:                                                       I


                                 Rufous Street

Page 63

Development




      (II
      >
                                                                :IE
      o                                                         0
                                                                0
      c                                                         c.
      ;:                   0                     0              ~o
      (II
      os:
      -g
                ThroUghl
                   Right   6                     115   IRi9ht
                                                       Left
                                                                ~
                                                                :E
                                 6       115                    c
       0                                                        ""l
       0
                                Left     Right                  :co
      ~                                                         ~


                                Rufous Street




2015 SAT Peak Hour Post-Development    ]




      (II
          >
                                                                :IE
      o                                                         0
                                                                0
      C                                                         c.
                                                                <
          ;:               52                    30
      (II
      os:
      -g
                Throughl
                   Right   8                     148   IRi9ht
                                                       Left
                                                                j
                                                                :E
                                                                  O




                                 8       148                    C
       0                                                        ""l
       0
                                Left     Right                  :co
      ~                                                         ~


                                Rufous Street




2025 SAT Peak Hour Post-Development    ]




          (II
          >
                                                                :IE
      o                                                         0
                                                                0
      C                                                         c.
                                                                <
          ;:               62                    36

      os:
      -g
          (II
                Throughl
                   Right   8                     148   IRi9ht
                                                        Left
                                                                j
                                                                :E
                                                                      O




                                 8       148                    C
          0                                                     ""l
          0
                                Left     Right                  :co
      ~                                                         ~


                                Rufous Street

Used in these records

About this file

File size
33.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 6 of 10 Traffic Impact Assessment - MCU13_0092.pdf · 33.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.