MOVEMENT SUMMARY
Site: 2013 SAT Existing Conditions
12-060 Peregian Beach SC
David Low Way I Woodland Drive
2013 PM Existing Conditions
Giveway I Yield (Two-Way)
-
-
- -
-
,
Movement Performance - Vehicles
~tDem-and 31 !95%18 ck’ Queue ~ ~!’:-.
of P.rop:;~:’~Effectlve:)’.’.~Average’f
of \.,
lMOV,!;~:""~ODZt~’-’~’_~-’:
\.~....~1"I~
F,IOWS;~f:;~’~7,iDeg:~:":’.’1Average"’J,nLevel
tt.,f- ":~1 ..~t~) "-’-""’’’i ".’\:....~" "~I ’.’\.""". ~-<..~. or_
-;ii~~i.’~..tW,~~v~ ~1:’li.".J!~r
.. ’’’rj; ’;
,~..
’<,’ifJ. ;:~!Total ’1_\,~lHV~~~" elay :tService’" ’.;-.Vehicles ;~.;"Dlstance,~,,’Queued ’iltStop’Rate’,: fSpeed’
hiD ~’;’:: ..,~" MSatn,~:’,:i1’t’ S,",\I
~~:,\~ttfi~. h/h %\t;~~..,,~t~v/ ’~,;~ !11}~-,J~;Jsec~,.;’I~.~’~,’f’~;-~’:.~~~’l:.;"~;,~’,r~1~v h~~:;:~:~~~t ~m~~’,&~)’:,:;’.~~~ l}~?f’ 1vert, ~<~.~:,~km/h’
South ay -
Sout
1 25 1.0 0.295 0.5 LOS A 0.0 0.0 0.00 0.06 59.3
2 545 1.0 0.295 0.5 LOSA 0.0 0.0 0.00 0.06 59.3
3u 14 1.0 0.012 13.1 LOS B 0.0 0.4 0.47 0.71 45.0
Approach 584 1.0 0.295 0.8 NA 0.0 0.4 0.01 0.07 58.9
1.0 0.239 0.0 LOSA 0.0 0.0 0.00 0.00 59.9
1.0 0.006 12.4 LOS B 0.0 0.2 0.53 0.69 45.6
1.0 0.006 12.4 LOS B 0.0 0.2 0.53 0.69 45.6
1.0 0.239 0.2 NA 0.0 0.2 0.01 0.01 59.7
1.0 0.141 18.4 LOSC 0.5 3.5 0.72 0.89 40.7
12 R2 1.0 0.141 18.4 LOS C 0.5 3.5 0.72 0.89 40.7
Approach 53 1.0 0.141 18.4 LOSC 0.5 3.5 0.72 0.89 40.7
All Vehicles 1106 1.0 0.295 1.4 NA 0.5 3.5 0.04 0.09 58.0
Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Ak lik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Copyright @ 2000-2013 Akcelik and Associates Ply Ltd
Processed: Tuesday, 14 May 2013 4:50:35 PM
SIDRA INTERSECTION 6.0.2,3730 www.sidrasolutions.com
SlCIn~
Project: P:\2011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\Oavid Low Way -
Woodland Dr.sip6 l ~% 5ft1;lgN 6
8000122,ADAM PEKOL CONSULTING, PLUS 11PC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 33.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.