Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (33.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

12-060 Peregian
Traffic Volumes


12013 PM Peak Hour Existing Conditions



                                            David Low Way

       41
       >                          U-Turn           Right        Through
       Oi:
       C                              2       I     13      I    411
                   Left I    5
       ~
                  Right I    30
       ~                             27       I     479 I     16
       o
       o
                                     Left         Through U-Turn
       ;::
                                            David Low Way


12015 PM Peak Hour mevelop.,ment




                                            David Low Way


       ~                           U-Turn          Right        Through
       Oi:
       C                              2       I     13      I     426
                   Left I    5
       ~
       0>         Right I    30
       "tS
        o
                                     28       I    496      I     17
                                     Left         Through       U-Turn
       ~
                                            David Low Way




12025 PM Peak Hour Pre-DeveloJ?ment




                                            David Low-Way


        ~                           U-Turn         Right        Through
       Oi:
       C                              2       I     16      I     506
                    Left I   5
       ~
                  Right I    30
       ~                             33       I     590     I     20
        o
                                     Left                       U-Turn
       ~                                          Through

                                            David Low Way

Used in these records

About this file

File size
33.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 6 of 10 Traffic Impact Assessment - MCU13_0092.pdf · 33.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.