5.0 Planning Report Lot 15 Venture Drive

Attached to the e-mail MCU16/0087 & OPW16/0159 Development Application.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

BUSINESS USES CODE
14.12 Specific Outcomes and Probable Solutions for the Business Uses Code

           column 1 Specific Outcomes                                        column 2
                                                              Probable solutions (if code assessable)
14.16    Effects of use

Electricity infrastructure            S18.1 No solution provided
O18 The development does not                                                 Complies – Proposed
adversely impact on existing or                                              development does not
future electricity supply                                                    adversely impact on electricity
infrastructure;                                                              infrastructure.

AND                                   S19.1 Development for uses adjacent
                                       to or within 50m of an existing       Complies - Premises is not
O19 All uses and works maintain an     electricity substation incorporates   located within 50m of an
adequate safe distance from            noise attenuation measures to         electricity substation.
electrical infrastructure including    mitigate noise impacts;
substations, overhead power lines,    AND
power poles and transformers.
                                      S19.2 Buildings and structures         Complies – Is not built
                                       (including swimming pools, sheds,     within easement or overhead
                                       tennis courts and outbuildings) are   power lines.
                                       not constructed under overhead
                                       electricity transmission lines, or
                                       within electricity easements




Noise                                  No solution provided                  Complies – The proposed
O20 Development is designed and                                              building design consists of tilt
sited to avoid noise emissions that                                          slab construction with high
unreasonably diminish the amenity                                            ceilings which provides an
of the area or surrounding uses.                                             effective means to capture
                                                                             and bounce sound internally
                                                                             within
                                                                             the building. Limited openings
                                                                             reduce the escape of sound.
                                                                             The level of noise from the
                                                                             operation is one that is
                                                                             expected within the industrial
                                                                             zone.




 Building Suncoast Green                                                                      Page 12
Log in to download the original file

5.0 Planning Report Lot 15 Venture Drive.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.