Original source · versioned page text
5.0 Planning Report Lot 15 Venture Drive
Attached to the e-mail MCU16/0087 & OPW16/0159 Development Application.
column 1 column 2
Specific Probable solutions (if code assessable)
Outcomes
b) use toughened glass, security screens
and other measures (but not including
security shutters that obscure the view
of shop fronts) are used in windows
which are provided at ground level, to
deter break and enters; and
c) use hardy vandal proof materials
and anti-graffiti paint are used in
O28 Lighting of the construction of buildings.
appropriate intensities Complies – Electrical
S28.1 Lighting of appropriate intensities is contractors will install lighting
is provided to provided which satisfies the requirements of
maximise safety. which meets Australian
Australian Standard AS1158: Public Standard AS1158: Public
Lighting Code, unless otherwise specified in Lighting Code, unless
this Code; otherwise specified in this
AND Code;
S28.2 External lighting of a graduated Complies – The lighting design
intensity is provided which starts at a lower achieves the solution.
level of brightness at the perimeter of the
site and rises to a higher level at the
entrance to buildings or at the centre of the
site;
AND
Complies - Lighting spill has
S28.3 Lighting is directed onto the site and been considered and will be
away from neighbouring properties; operated at acceptable levels
AND and will not impact adjoining
properties.
S28.4 Vandal-resistant lighting is used in
O29 Public toilets are public and publicly accessible areas. Complies - The lighting design
designed and constructed S29.1 Public toilets are located in high achieves the solution.
to— traffic areas;
a) ensure the safety of
all people using AND N/A
them; and S29.2 Features that may legitimise N/A
b) take advantage loitering, such as seating or public
of informal telephones are not located within 20m of N/A
surveillance from toilet entrances; Complies - A public bus stop is
adjoining uses located on Eumundi Noosa Road.
and activities, AND There is currently no pathway
discouraging S29.3 Entrances to public toilets are infrastructure linking this proposed
non-legitimate visible from the street, footpath and other development with the bus stop, but
uses. activity areas on the site or adjoining the design and layout of the
sites. development is such that it will
accommodate future infrastructure.
S30.1 Safe and convenient pathway access
O30 Premises have is provided from the site to link to existing Complies – The subject site is
accessibility to public pathway networks that services public located within a newly created
transport. transport facilities; industrial area of an existing
OR industrial precinct. Pathway access
infrastructure is present in existing
S30.2 Direct pathway access is provided to areas, but not in the area of this
the public transport facility if the facility is subject development. The
contained on site or within 50m from the proposed development, will
property boundary. accommodate future infrastructure.
Building Suncoast Green Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.