Original source · versioned page text
Further Advice (17.10) [As Published]
Issue – Open Space landscape and revegetation
The Operational works landscape plans have not addressed the Planning Scheme Policy 2 –
Landscaping or incorporated the requirements of condition 12 of the higher order approval
(51987.2966.05).
Advice Required
12. Provide revised landscape plans that are in accordance with the higher order approval
(51987.2966.05) development layout.
13. Provide detailed landscape plans that incorporate the requirements of the Riparian Zone
Plans, prepared by Environmental Landscape Planning dated 02/2022.
14. Provide revised landscaping plans that substitute the use of Ravenala Rivularis for a
mixture of native tree species found with the local Regional Ecosystem 12.2.5.
15. Provide revised landscape plans that demonstrate that suitable landscape buffering is
provided to ensure the development is screened from neighbouring properties. This
must include landscape buffering to all boundaries of Lot 2.
3. DUE DATE FOR RESPONSE TO FURTHER ADVICE
A response to the further advice is required by 3 December 2025. Email your response to
[email protected]. OTHER DETAILS
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.
Yours faithfully,
Daniel Epps
Senior Development Engineer
Page 5 of 5
Document Set ID: 24231081
Version: 2, Version Date: 17/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.