19915 Traffic Engineering Report
Good Shepherd Lutheran College, Noosaville
March 2023
Whilst the pick‐up and drop off arrangements shown in Figure 13 are temporary, they
are considered suitable until the formal construction of the master planned car park
is completed, refer to Figure 14. The master planned arrangement provides 16 pick‐
up /drop off bays, plus queueing and 81 short term car parks (increased from 58), with
one way traffic flow within the site. There is also a significant improvement to
pedestrian safety and connectivity within this car park. It is recommended the
pedestrian crossings be raised platforms to further reduce vehicle speeds.
Figure 14 – Master Plan proposed drop off and pick up lane
Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.