Council archive · source document
Traffic Engineering Report · MCU23/0096
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
19915 Traffic Engineering Report
Good Shepherd Lutheran College, Noosaville
March 2023
In summary the current arrangements and proposed master plan provides an
appropriate number of car parking spaces for staff, students and visitor parking. The
changes to the car parking areas have not adversely impacted on the operational
performance of the network. As such there is no demonstrated need for an internal
connection (other than for emergency access). The current temporary drop off and
pick up arrangements are a significant improvement to previous conditions and should
continue to operate with staff supervision and regular reviews. The proposed master
plan drop‐off and pick‐up is considered suitable and will provide further
improvements to the safety and efficiency of access and movement within the College.
Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.