Council archive · source document
Traffic Engineering Report · MCU23/0096
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
19915 Traffic Engineering Report
Good Shepherd Lutheran College, Noosaville
March 2023
3 MASTER PLAN
The proposed master plan is shown in Figure 3. Building B and associated pre‐perp
car parking was completed in 2021 and the new secure staff car park on the corner of
Eumundi Noosa Road and Walter Hay Drive was also completed in 2021. The master
plan includes a new performing arts building, which will be built in place of the old
staff car parking area (refer to blue building 1). The plans also include changes to the
short term car park to improve traffic flow and pedestrian safety and provide a longer
drop‐off and pick‐up lane for students.
Figure 3 – Proposed Master Plan
Source: Burling Brown
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.