Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Swmp · MCU22/0058

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

     3. Downstream pits within the road reserve are to be protected through filter socks or similar.

     4. Diversion of upstream catchments around any exposed areas through the use of diversion drains around the
        site.


     4.2. Operational Phase
The development consists of a small lot duplex consistent in character with the existing residential dwelling. The
proposed development is not considered to significantly alter the pollutant generation potential of the site, and
therefore no additional stormwater quality treatment is proposed for the development.




Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078.docx, 2022-06-24                                Page 11 of 15
Revision 1


P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566      E [email protected]    recorconsulting.com

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SWMP.pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.